· Edson Solar (Jamie reported out)
· Bringing back to committee
· One request from the sponsor for consideration
· DSCR is at the Borrower letter and not the project level
· From a conservative calculation used the full interest expense and tax returns from 2024
· DSCR from 2024 is at a 1.41
· The actuals document shows a 1.67 coverage
· More context: Redball is a 25% owner of this project and has repaid a 4.5 million line of credit
· Redball wants to retire the other debt so that Capital Bank is the only debt left
· There have been some issues with converting/reporting electricity into revenue
· There has been a 3 month reserve
· Right now this is based of a trailing 12 month 1.25 test
· Bad-boy carve out – Paul mentioned the specifics of that
· Paul and Jamie meet with Counsel
· Specific language forthcoming in the bad-boy carvout regarding maintenance and repairs
· Keep the project-level covenant, and if this fails, move to the borrower-covenant in the event that the project-covenant fails
· From Kathy: Other debt may be missing in the calculation
· Historically speaking
· There was a roll-up transaction so that the 2025 and 2024 tax returns weren’t apples to apples
· “Re-load backstop”
· It would be more standard to have six months of reserves
· DSCR-
· What is the difference between the project vs the borrower level?
· From Paul: “We are adding a covenant, not changing or removing the covenant.”
· The idea is that the solar panel projects will support the debt
· Ben is the CEO
· Testing at the Borrower level vs testing at the Project level
· We had a prior $3.5 million line of credit/loan
· How much is a 3 month reserve? $300K
· From Paul: We are bordering on a year into these discussions?
· This project isn’t performing right now
· “Approriate structure”
· What is the agreed testing period?
· This is more rapidly amortizing than some of our other solar deals
· If it doesn’t perform, the bad boy carve out jumps in\
· We need more visibility into Edson Solar and we need to see the debt schedule
· Edson Solar is owned by an
· Ben is an investor and bought from Redbull
· Valuation date- December 2025
· The measurement period to release
· Trailing 12 month of 1.25 or evidence that they retired the other 2 loans + had 2 quarters of preforming at the 1.25 (six month)
· They talked about releasing the escrow
· To summarize: Reduce six month reserve to 3 month,
· The purpose of the reserve is to
· Part B- just look at the trailing 12 month
· Motion: Approve the addendum as presented with the addition of recognizing the Redball guarantee/underwriting exception is the Redbull not guaranting (they can’t be the guarantor because )
· The project level stays, if ther are issues we will backstop
· However, the backstop is not a tool that
· Confirm that the non-
· The reduction is the six months to three months
· The mitigant is the bad-boy carve out (and there is a trip in the bad-boy carve out)
· Approved by Scot + Amar
·