CRE Loan Committee Meeting-8.5.26

·       Edson Solar (Jamie reported out)

·       Bringing back to committee

·       One request from the sponsor for consideration

·       DSCR is at the Borrower letter and not the project level

·       From a conservative calculation used the full interest expense and tax returns from 2024

·       DSCR from 2024 is at a 1.41

·       The actuals document shows a 1.67 coverage

·       More context: Redball is a 25% owner of this project and has repaid a 4.5 million line of credit

·       Redball wants to retire the other debt so that Capital Bank is the only debt left

·       There have been some issues with converting/reporting electricity into revenue

·       There has been a 3 month reserve

·       Right now this is based of a trailing 12 month 1.25 test

·       Bad-boy carve out – Paul mentioned the specifics of that

·       Paul and Jamie meet with Counsel

·       Specific language forthcoming in the bad-boy carvout regarding maintenance and repairs

·       Keep the project-level covenant, and if this fails, move to the borrower-covenant in the event that the project-covenant fails

·       From Kathy: Other debt may be missing in the calculation

·       Historically speaking

·       There was a roll-up transaction so that the 2025 and 2024 tax returns weren’t apples to apples

·       “Re-load backstop”

·       It would be more standard to have six months of reserves

·       DSCR-

·       What is the difference between the project vs the borrower level?

·       From Paul: “We are adding a covenant, not changing or removing the covenant.”

·       The idea is that the solar panel projects will support the debt

·       Ben is the CEO

·       Testing at the Borrower level vs testing at the Project level

·       We had a prior $3.5 million line of credit/loan

·       How much is a 3 month reserve? $300K

·       From Paul: We are bordering on a year into these discussions?

·       This project isn’t performing right now

·       “Approriate structure”

·       What is the agreed testing period?

·       This is more rapidly amortizing than some of our other solar deals

·       If it doesn’t perform, the bad boy carve out jumps in\

·       We need more visibility into Edson Solar and we need to see the debt schedule

·       Edson Solar is owned by an

·       Ben is an investor and bought from Redbull

·       Valuation date- December 2025

·       The measurement period to release

·       Trailing 12 month of 1.25 or evidence that they retired the other 2 loans + had 2 quarters of preforming at the 1.25 (six month)

·       They talked about releasing the escrow

·       To summarize: Reduce six month reserve to 3 month,

·       The purpose of the reserve is to

·       Part B- just look at the trailing 12 month

·       Motion: Approve the addendum as presented with the addition of recognizing the Redball guarantee/underwriting exception is the Redbull not guaranting (they can’t be the guarantor because )

·       The project level stays, if ther are issues we will backstop

·       However, the backstop is not a tool that

·       Confirm that the non-

·       The reduction is the six months to three months

·       The mitigant is the bad-boy carve out (and there is a trip in the bad-boy carve out)

·        Approved by Scot + Amar

·