Integrating Cl2 EWC into VIP NMOS Process - Study Notes

Integrating Cl2 EWC into VIP NMOS Process

Objective & Overview

  • Objective:
    • Compare the impact of replacing the HCl EWC (Enhanced Wet Chemical) Process of Record (POR) with Cl2 EWC on the VIP proxy SiP process.

Test Plan Timeline & Procedures

  • Key Items:
    1. Transfer VIP Proxy recipes to Chamber 51-6:
    • Clean and main recipes; deadline: 07-31-2024.
    1. Baseline VIP Proxy process on 51-6 with HCl EWC:
    • Set as reference; run 3x for sanity check; deadline: 07-31-2024.
    1. Replace HCl with Cl2 EWC (Ironman Version):
    • Optimize thermal traces using Si wafers (without process via SemiAuto) and perform 3x sanity checks; deadline: 07-31-2024.
    1. Chamber Inspection:
    • Detailed quartz and exhaust flange inspection with photos (no breaking vacuum); deadline: 08-02-2024.
    1. Repeatability Test:
    • Run 25x with both HCl and Cl2 EWC; deadline: 08-14-2024.
    1. Recipe tuning:
    • Tune Cl2 etching parameters (flow rate, temperature, time) for best Wafer-to-Wafer (WtW) performance; deadline: 08-21-2024.
    1. Final Repeatability test:
    • Use full stack (SiAsP + SiP) including quartz and exhaust flange inspection; deadline: 08-28-2024.
    1. Share optimized Cl2 EWC process:
    • Distribute recipe with changes in wafer loading and unloading temperature settings; deadline: 09-02-2024.

Process Requirements

  1. Maintaining Thermal Transitions:
    • Cool down to Cl2 etch temperature.
    • Keep quartz temperature high to enhance etch efficiency.
    • Heat up quickly after etching for proper wafer processing continuation.

Main & Cl2 Recipe Steps

  • Cl2 Recipe Steps:
    • Start: 5s at 530°C.
    • Carrier: 5s.
    • Etch Fill: 15s.
    • Hold: 10s.
    • Restore: 15s.
    • Purge: 10s.

Thermal Performance & Stability

  • Thermal Traces documented at various temperature settings (e.g., 530-520°C, with stabilization time specifics).
  • Optimize wafer load/unload conditions to enhance etching and simplify wafer transfers.

Weight Thickness Measurement (WtW) Check

  • Comparison of Cl2 EWC with HCl EWC noted that both showed closely overlapped SiP thickness profiles, indicating minimal impact from new thermal settings.

Inspection Results & Chamber Conditions

  • Inspection for both HCl and Cl2 EWC indicated closely matched thickness profiles and phosphorus concentration from materials used in processes.
  • Chamber condition pre and post-marathon showed virtually no changes in chamber status.

Cl2 EWC Tuning Timeline

  • Continuous process improvements with specific details for establishing and transitioning to Cl2 EWC, alongside key unchanged processes for the upcoming assessments.

Final Adjustments

  • Adjustments made post-Cl2 etching indicated a need to evaluate wafer loading temperatures and quartz temperature differences post-processing. Key observations included potential necessity for tuning based on lower quartz temperatures observed.

Overall Performance & Future Considerations

  • Future analysis necessitates ongoing assessments of material stability and process efficiency as new methods are integrated into production.

  • The success criteria for upcoming tests includes stability attributes across thickness means and concentrations from the previous methodologies.

  • Continuing detailed inspections are essential for ensuring long-term stability and minimal degradation during chemical processes.