4. Lecture 4 - Mixed - Multi Model - Singleton Method

Manufacturing 3: Review of Lecture 3

Performance Measures

  • Define performance measures for manufacturing processes.

Line Balancing

  • Use the Kilbridge and Wester method to balance a production line.

  • Apply the Ranked positional weight method to balance a line.

Course Structure

Course Outline

  1. Introduction

  2. Plant Layout

  3. Design and Scheduling of Flow Process Systems

    • 3.1 Line Balancing

    • 3.2 The Kilbridge and Wester Method

    • 3.3 The Ranked Positional Weight Method

    • 3.4 More Complex Situations – Mixed Model and Multi Model

  4. Layout for Batch Production – Singleton’s Method

  5. Scheduling

  6. Computer Assisted Production Planning

  7. Just-in-Time Systems

  8. Synchronous Production Systems and Theory of Constraints

  9. Digital Manufacturing and Work Measurement

Learning Outcomes

Session Objectives

  • Understand the difference between multi-model and mixed-model assembly lines.

  • Balance a composite line.

  • Apply Singleton’s method to a sequencing problem.

The Ideal Production System

  • A smoothly flowing stream with many tributaries and no pools, dams, or other accumulations.

Mixed Model Production

  • Mixed Model Production is the practice of assembling several distinct models of a product on the same assembly line.

  • The objective is to smooth demand on upstream workcenters, manufacturing cells or suppliers and thereby reduce inventory, and eliminate changeovers.

  • It also eliminates difficult assembly line changeovers.

Assembly Line Balancing – Complex Situations

  • Assembly lines organized for a single product can be very efficient.

  • Consumer pressure leads to a limited variability being permitted in industry.

  • Economics usually dictates that the variation in product specification is not so significantly different from the base product as to justify a separate assembly line.

Handling Limited Variability

  • Assume the same assembly line is used; how then is the limited variability in product specification handled?

  • If essentially the same work stations are used but necessitate re-tooling and different set-ups, then a multi-model assembly line is used.

  • If roughly the same workstations are used without necessitating significant re-tooling etc. but the inclusion of a relatively small number of additional workstations or the by-passing of a few others, then a mixed-model assembly line is used.

Multi-Model Assembly Lines

  • Assembly lines can handle the production of two or more products consecutively on the assembly line.

  • The major problems associated with organisation and control relate to:

    • Balancing the line where all products are accounted

    • The order in which the products to be launched on to the assembly line

      • This sequence will directly influence the efficiency of the assembly line.

      • The sequence should seek to equalise the loading on workstations and prevent localised bottlenecks and/or shortage of work on other workstations.

    • Batch production economics

      • Batch sizes to be produced relate to the holding costs and setup costs for the product concerned

    • The order in which products are manufactured

      • Minimize setup costs between products

Mixed-Model Assembly Lines

  • Assembly lines can handle the production of two or more products concurrently on the assembly line

  • The major problems associated with organisation and control relate to:

    • Balancing the line where all products are accounted

    • The complexity of balancing a mixed model assembly line depends greatly on the similarity or otherwise between the work element constituency of the different products

    • If there is significant similarity between the products, then the line balancing process will produce similar workstation specifications for the products if they are each considered independently

Balancing Loss

  • So the balancing loss will be small irrespective of which product is being produced

  • However, if there are significant differences in the work element requirements of the products then the previous approach will not work efficiently

Composite Product Requirement

  • In this case it is more appropriate to combine the work element requirements of all products to achieve a composite product requirement for a given period of time

  • The line balancing process then proceeds on the basis of the data for this composite requirement

Worked Example: Composite Balancing Problem

  • Consider Assembly line for Model A

  • Required production rate for Model A = 200/week

  • Elements used in Model A: 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10

Worked Example: Composite Balancing Problem

  • Consider Assembly line for Model B

  • Required production rate for Model B = 100/week

  • Elements used in Model B: 1, 3, 4, 7, 8, 9, 11, 12, 13, 14, 15, 16, 17, 18

Class Exercise

Task

  • Balance the Line for a WS time of 40 hours (1 week)

Steps

  1. Combine both precedence diagrams into a single precedence diagram

  2. Create a composite Balancing line table

  3. Balance the line

Worked Example: Combine Precedence Diagrams

  • Elements used in Models A and B

Worked Example: Step 2

Create a Composite Balancing Line Table

  • The table will provide details of the weekly work requirement for each element taking into account the contributions made by one or both models

  • In this way a positional weight can be calculated for the composite situation based on a week's production

Worked Example – Step 2

Element No

Element Duration (hr)

Model A Req. Per week

Model B Req. Per week

Total Req. Per Week

Total Time Per Week (hr)

Positional Weight

0

0.32

200

0

200

64


1

0.10

200

100

300

30


2

0.20

200

0

200

40


3

0.05

200

100

300

15


4

0.10

200

100

300

30


5

0.23

200

0

200

46


6

0.20

200

0

200

40


7

0.05

200

100

300

15


8

0.32

200

100

300

96


9

0.10

200

100

300

30


10

0.30

200

0

200

60


11

0.10

0

100

100

10


12

0.15

0

100

100

15


13

0.17

0

100

100

17


14

0.08

0

100

100

8


15

0.07

0

100

100

7


16

0.13

0

100

100

13


17

0.20

0

100

100

20


18

0.13

0

100

100

13


  • element duration x total reg. per week

  • eg. 0.32 x200

  • element only A

  • element split

  • element only B

Complete the PW Column

  • Work out Positional weights for each work element

  • Hint PW for Work Element 18 = 13hr

Worked Example – Finished Composite Balancing Line Table

Element No

Element Duration (hr)

Model A Req. Per week

Model B Req. Per week

Total Req. Per Week

Total Time Per Week (hr)

Positional Weight

0

0.32

200

0

200

64

411

1

0.10

200

100

300

30

463

2

0.20

200

0

200

40

347

3

0.05

200

100

300

15

292

4

0.10

200

100

300

30

277

5

0.23

200

100

200

46

307

6

0.20

200

0

200

40

246

7

0.05

200

100

300

15

125

8

0.32

200

100

300

96

206

9

0.10

200

100

300

30

110

10

0.30

200

0

200

60

167

11

0.10

0

100

100

10

157

12

0.15

0

100

100

15

142

13

0.17

0

100

100

17

125

14

0.08

0

100

100

8

61

15

0.07

0

100

100

7

53

16

0.13

0

100

100

13

46

17

0.20

0

100

100

20

20

18

0.13

0

100

100

13

13

Class Exercise

  • Task: Balance the Line for a WS time of 40hours

Steps

  1. Combine both precedence diagrams into a single precedence diagram

  2. Create a composite Balancing line table

  3. Balance the line

Process Step by Step

  • We will go through the process step by step:

  • Lets balance the line for a workstation time of 40hours

  • Use the following table and a blank page to write down procedure

Workstation

Element

Total Time Per Week (hr)

Time Remaining (hr)

Step 3: Balance the Line

  • Examine the hours required for each element per week

  • If a normal 40hour week is assumed, it can be seen that work elements 0, 5, 8 and 10 require more than 40 hour capacity per week

  • one workstation does not have the capacity -

  • need more workstations

Step 3: Balance the Line – Increasing Capacity

  • Examine the hours required for each element per week

  • If a normal 40hour week is assumed, it can be seen that work elements 0, 5, 8 and 10 require more than 40 hour capacity per week

  • It is thus necessary to increase their capacity by multiplying by an integer value i.e. doubling their capacity

  • So for these workstations, instead of assuming there is a 40hour week capacity there is an 80 hour per week capacity

  • When this happens it will be indicated by an extra workstation being added

Workstation 1

  • Remember: 40hr Workstation time

  • Options 0, 1, and 11

  • Choose element 1 for WS 1 based on Positional Weight

  • Remaining WS time = 40-30=10hr

  • Next Choose element 11 as it fits within 40hr limit for WS

Workstation

Element

Total Time Per Week (hr)

Time Remaining (hr)

1

1

30

10

1

11

10

0

Workstation 2

  • Options 0, 12, and 3

  • Element 0 has Largest Positional Weight – Choose it

  • Element 0 time is 64hours which is more than 40hours per station

  • Double Workstation capacity to 80hours (now becomes WS 2 and 3)

  • 16hours spare therefore Element 3 can slot into workstation 2 and 3

Workstation

Element

Total Time Per Week (hr)

Time Remaining (hr)

1

1

30

10

1

11

10

0

2,3

0

64 (80 cap)

16

2,3

3

15

1

Class Exercise

  • Complete the assigning of elements to workstations

  • Calculate balancing loss and line efficiency

Workstation

Element

Total time per week

Time remaining hr

1

1

30

10

1

11

10

0

2, 3

0

64 80 cap

16

2, 3

3

15

1

4

2

40

0

5, 6

5

46 80 cap

34

Calculating Balancing Loss and Efficiency

  • Balancing Loss = \frac{\text{Total time}}{\text{#Workstations x Workstation Time}} = \frac{569}{15 \times 40} = 5.2 \%

  • Efficiency = 100−5.2=94.8%100 - 5.2 = 94.8 \%

Mixed-Model Assembly Lines - Model Launching

  • Note that production volumes indicate that model A has twice the production of model B.

  • So this has to be reflected in the way that the different products are launched on the assembly line.

  • For instance, if a sequence such as: AAAAAAAAAABBBBBAAAAAAAAAABBBBB ………. is used, it will obviously tend to induce temporary bottlenecks at some workstations and shortage of work at others.

  • It would be better to have a launching sequence of: AABAABAABAABAABAABAABAABAABAAB ……….. to induce a more integrated mixing in the assembly line.

Suggested Model Layout

A diagram showing various workstations in a line with queues between them, indicating work input and output.

Tutorial 1 - Question 3

  • Composite Line Balancing

SINGLETON’S METHOD

  • Each product might superficially have different machine sequences and be manufactured in different volumes.

  • However there might be an underlying natural sequence of machines that might not be immediately obvious.

  • Singleton’s method attempts to detect this underlying sequence – if there is one!

Worked Example: Determine the Optimum Production Line Layout

  • For the following 8 Machine 7 Product setup

Product

Machine Sequence

Volume (units/week)

A

2 – 3 – 7 – 1

20

B

6 – 7 – 4 – 8 – 5

40

C

6 – 4 – 7

40

D

2 – 3 – 4 – 5 – 7 – 1

60

E

7 – 2 – 6 – 5 – 1

50

F

6 – 3 – 8 – 5 – 7

30

G

2 – 4 – 8 – 7

20

There are 8! (40320) possible line layouts (or orderings of the 8 machines).

Cross Chart

  • Example “from 2 – 3” there are 20 + 60 units

From Machine

To Machine

1

2

3

4

5

6

7

8

1










2



80




20



3




60



20



4





50


90



5






30

40



6










7










8










Arbitrary Ordering of Machines










Singleton’s Method:

  • Describes the position of a machine requirement in a sequence by placing it on a scale and fix the position on the scale by its position in the sequence.

  • Also weight according to the relative production volume.

  • Combine all such requirements for a machine by superimposing on the same diagram (for a machine).

SINGLETON’S METHOD – Procedure

  1. Step 1: List the Percentile Centre Points of the number of machines

  2. Step 2: Fill in the Singleton’s table and calculate mean and standard deviations for each machine

  3. Step 3: Order machines in order of increasing means

  4. Step 4: Look for backtracking and finalise layout

SINGLETON’S METHOD

  • Step 1: List the Percentile Centre Points of the number of machines

  • These mathematical relationships are used to calculate the mean and standard deviations

Number of Machines

Position

1st

2nd

3rd

4th

5th

6th

7th

3


16.67

50

83.33

-

-

-

-

4


12.5

37.5

62.5

87.5

-

-

-

5


10

30

50

70

90

-

-

6


8.33

25

41.6

58.31

74.97

91.63

-

SINGLETON’S METHOD

  • Step 1: Example: Percentile Centre Points for 3 machines i.e. n=3

Number of Machines (n)

Position

1st

2nd

3rd

4th

5th

6th

7th

3


16.67

50

83.33

-

-

-

-

4


12.5

37.5

62.5

87.5

-

-

-

5


10

30

50

70

90

-

-

6


8.33

25

41.6

58.31

74.97

91.63

-

CP=1002n\text{CP} = \frac{100}{2n}









CP=100n+1002n\text{CP} = \frac{100}{n} + \frac{100}{2n}









CP=300n+1002n\text{CP} = \frac{300}{n} + \frac{100}{2n}









In all working out keep to 2 d.p.!!!

SINGLETON’S METHOD

  • Class Exercise: Calculate the Percentile Centre Points for 7 machines i.e. n=7

Number of Machines (n)

Position

1st

2nd

3rd

4th

5th

6th

7th

7


7.14

21.43

35.71

50.00

64.29

78.57

92.86

SINGLETON’S METHOD

  • Step 1: List the Percentile Centre Points of the number of machines

  • Step 2: Fill in the Singleton’s table and calculate mean and standard deviations for each machine

  • Step 3: Order machines in order of increasing means

  • Step 4: Look for backtracking and finalise layout

SINGLETON’S METHOD

  • Step 2: Calculate mean and standard deviations for each machine in turn

SINGLETON’S Table (Machine 1)

Product

CP (i)

Weighting (ii)

(i) X (ii) (iii)

(i) X (i) (iv)

(iv) X (ii) (v)

A






B






C






D






E






F






G






SINGLETON’S METHOD

  • Step 2: Fill in the Singleton’s table and calculate mean and standard deviations for each machine

  • Establish 1st product on machine 1, i.e. Product A

  • There are four machines for Product A, therefore CP for Product A at position 4 for n=4 machines is 87.5

SINGLETON’S Table (Machine 1)

Product

CP (i)

Weighting (ii)

(i) X (ii) (iii)

(i) X (i) (iv)

(iv) X (ii) (v)

A

87.5

(20) 2

175

7656.25

15312.5

All values are multiples of ten so removed o to simplify calculations

SINGLETONS METHOD

  • Step 2: Fill in the Singleton’s table and calculate mean and standard deviations for each machine

  • Establish next product on Machine 1 i.e. Product D

  • There are six machines for Product D, therefore CP for Product D at position 6 for n=6 machines is 91.63

SINGLETON’S Table (Machine 1)

Product

CP (i)

Weighting (ii)

(i) X (ii) (iii)

(i) X (i) (iv)

(iv) X (ii) (v)

A

87.5

(20) 2

175

7656.25

15312.5

SINGLETONS METHOD

  • Step 2: Fill in the Singleton’s table and calculate mean and standard deviations for each machine

  • Establish next product on Machine 1 i.e. Product D

  • There are six machines for Product D, therefore CP for Product D at position 6 for n=6 machines is 91.63

SINGLETON’S Table (Machine 1)

Product

CP (i)

Weighting (ii)

(i) X (ii) (iii)

(i) X (i) (iv)

(iv) X (ii) (v)

A

87.5

(20) 2

175

7656.25

15312.5

D

91.63

(60) 6

549.78

8396.06

50376.36

SINGLETON’S METHOD

  • Step 2: Fill in the Singleton’s table and calculate mean and standard deviations for each machine

  • Establish next product on Machine 1 i.e. Product E

  • There are five machines for Product E, therefore CP for Product E at position 5 for n=5 machines is 90
    SINGLETON’S Table (Machine 1)

Product

CP (i)

Weighting (ii)

(i) X (ii) (iii)

(i) X (i) (iv)

(iv) X (ii) (v)

A

87.5

(20) 2

175

7656.25

15312.5

D

91.63

(60) 6

549.78

8396.06

50376.36

SINGLETON’S METHOD

  • Step 2: Fill in the Singleton’s table and calculate mean and standard deviations for each machine

  • Establish next product on Machine 1 i.e. Product E

  • There are five machines for Product E, therefore CP for Product E at position 5 for n=5 machines is 90

SINGLETON’S Table (Machine 1)

Product

CP (i)

Weighting (ii)

(i) X (ii) (iii)

(i) X (i) (iv)

(iv) X (ii) (v)

A

87.5

(20) 2

175

7656.25

15312.5

D

91.63

(60) 6

549.78

8396.06

50376.36

E

90

(50) 5

450

8100

40500

∑volume\sum volume






SINGLETON’S METHOD

  • Step 2: Fill in the Singleton’s table and calculate mean and standard deviations for each machine

  • Work out Mean and SD from data

SINGLETON’S Table (Machine 1)

Product

CP (i)

Weighting (ii)

(i) X (ii) (iii)

(i) X (i) (iv)

(iv) X (ii) (v)

A

87.5

(20) 2

175

7656.25

15312.5

D

91.63

(60) 6

549.78

8396.06

50376.36

E

90

(50) 5

450

8100

40500

∑13\sum 13






∑1174.78\sum 1174.78






∑106188.86\sum 106188.86






Mean=∑(i×ii)∑ii\text{Mean} = \frac{\sum (i \times ii)}{\sum ii}






Mean=1174.7813=90.37\text{Mean} = \frac{1174.78}{13} = 90.37






SD=∑(iv×ii)∑ii−Mean2\text{SD} = \sqrt{\frac{\sum (iv \times ii)}{\sum ii} - \text{Mean}^2}






SD=106188.513−90.372=1.28\text{SD} = \sqrt{\frac{106188.5}{13} - 90.37^2} = 1.28






2 d.p.
2 d.p.

SINGLETON’S METHOD

  • Class Exercise:

Split into 7 equal groups and work out the mean and standard deviations for:

Machine 2 - 8

SINGLETONS METHOD

  • Step 1: List the Percentile Centre Points of the number of machines

  • Step 2: Fill in the Singleton’s table and calculate mean and standard deviations for each machine

  • Step 3: Order machines in order of increasing means

  • Step 4: Look for backtracking and finalise layout

SINGLETON’S METHOD

  • Step 3: Order machines in order of increasing means

  • Summary of Results Table

  • Note “rank in order of ascending means”

Machine

Mean

σ

Position

1

90.37

1.28


2

16.67

9.58


3

28.64

4.69


4

45.29

4.88


5

70.55

11.58


6

24.17

17.62


7

58.58

30.25


8

61.67

8.74


SINGLETON’S METHOD

  • Step 3: Order machines in order of increasing means

  • Summary of Results Table

  • Initially sequence should be in order

Machine

Mean

σ

Position

Revised

1

90.37

1.28

8th


2

16.67

9.58

1st


3

28.64

4.69

3rd


4

45.29

4.88

4th


5

70.55

11.58

7th


6

24.17

17.62

2nd


7

58.58

30.25

5th


8

61.67

8.74

6th


SINGLETON’S METHOD

  • Step 3: Order machines in order of increasing means

  • Initially sequence should be in order of increasing means

Machine

Mean

σ

Position

Revised

1

90.37

1.28

8th


2

16.67

9.58

1st


3

28.64

4.69

3rd


4

45.29

4.88

4th


5

70.55

11.58

7th


6

24.17

17.62

2nd


7

58.58

30.25

5th


8

61.67

8.74

6th


Superimpose Workflow

Now superimpose workflow on production line

Example flow – Product A – (2 – 3 – 7 – 1)

SINGLETONS METHOD

Step 1: List the Percentile Centre Points of the number of machines

Step 2: Fill in the Singleton’s table and calculate mean and standard deviations for each machine

Step 3: Order machines in order of increasing means

Step 4: Look for backtracking and finalise layout

SINGLETONS METHOD

Solution Steps

Step 4: Look for backtracking and finalise layout

SINGLETONS METHOD

Step 4: What about “backtracking”

Superimpose back flow of work i.e. Product D

Product D path (2 – 3 – 4 – 5 – 7 – 1)

SINGLETONS METHOD

Step 4: What about “backtracking”

*