Activity-Based Costing and Activity-Based Management Comprehensive Study Guide
Plastim ABC System Implementation and Calculation Steps
Step 1: Cost Object Identification
The primary cost objects in the Plastim activity-based costing system are the S3 lenses and C5 lenses.
Step 2: Direct Cost Identification
Direct costs associated with the cost objects are directly traced and consist of:
Direct Materials
Direct Manufacturing Labor
Mold Cleaning and Maintenance
Step 3 & Step 4: Indirect Cost Pools and Cost-Allocation Bases
Indirect overhead costs are accumulated into activity-specific cost pools, each associated with a designated cost-allocation base (cost driver):
Design Activity Pool:
Total Indirect Cost:
Cost Allocation Base / Cost Driver: Parts-Square feet
Total Base Quantity:
Molding Machine Setup Activity Pool:
Total Indirect Cost:
Cost Allocation Base / Cost Driver: Setup-Hours
Total Base Quantity:
Molding Machine Operations Activity Pool:
Total Indirect Cost:
Cost Allocation Base / Cost Driver: Molding Machine-Hours
Total Base Quantity:
Shipment Setup Activity Pool:
Total Indirect Cost:
Cost Allocation Base / Cost Driver: Shipments
Total Base Quantity:
Distribution Activity Pool:
Total Indirect Cost:
Cost Allocation Base / Cost Driver: Cubic Feet Delivered
Total Base Quantity:
Administration Activity Pool:
Total Indirect Cost:
Cost Allocation Base / Cost Driver: Direct Manufacturing Labor-Hours
Total Base Quantity:
Step 5: Cost Allocation Rate Calculations
The indirect cost allocation rates per unit of cost driver are calculated as follows:
Design Activity Rate: \frac{\450,000}{100\text{ parts-square feet}} = \
Molding Machine Setup Activity Rate: \frac{\300,000}{2,000\text{ setup-hours}} = \
Molding Machine Operations Activity Rate: \frac{\637,500}{12,750\text{ molding machine-hours}} = \
Shipment Setup Activity Rate: \frac{\81,000}{200\text{ shipments}} = \
Distribution Activity Rate: \frac{\391,500}{67,500\text{ cubic feet delivered}} = \
Administration Activity Rate: \frac{\255,000}{39,750\text{ direct manufacturing labor-hours}} = \
Step 6: Indirect Cost Allocation
The calculated indirect cost rates from Step 5 are multiplied by the actual quantity of cost drivers consumed by each cost object (S3 and C5 lenses) to assign overhead costs.
Essential skill requirement: Be able to correctly identify the Activity (cost pool) and its corresponding Cost Driver (refer to practice problem HW #5-21).
ABC vs. Simple Costing Evaluation and Comparative Analysis
Mathematical and Methodological Validity
Both Activity-Based Costing (ABC) and Simple Costing systems are mathematically correct.
Both accounting methods are considered acceptable management accounting approaches.
Impact on Product Costing and Strategic Decision-Making
Each costing method yields a different cost figure for the cost objects.
Differing cost figures directly lead to different gross margin calculations across products.
Discrepancies in gross margins may lead to different business decisions, particularly regarding product pricing.
Overhead Allocation Dynamics
Only overhead (indirect cost) allocation is affected by the choice of costing system. Total costs for the entire firm remain exactly the same; they are merely allocated differently among the cost objects within the firm.
Selection Criteria for Costing Methods and Drivers
The selection of the appropriate costing method and cost drivers must be based on:
Operational experience.
Standard industry practices.
A comprehensive cost-benefit analysis of each option under consideration.
Effectiveness and Limitations of Activity-Based Costing
Perceived Superiority of ABC
ABC is generally perceived to produce superior costing figures due to its implementation of multiple cost drivers across multiple activity levels.
Critical Role of Cost Driver Selection
An ABC system is only as good as the drivers selected and their actual causal relationship to underlying costs.
Poorly chosen cost drivers will produce inaccurate product costs, even when using an ABC framework.
Accuracy Guarantees
Utilizing an ABC system does not guarantee more accurate product costs.
Indicators and Signals for ABC Implementation
Operational and Costing Red Flags
The presence of specific operational conditions indicates that implementing ABC could benefit a firm:
Significant amounts of indirect costs are currently allocated using only one or two cost pools.
All or most indirect costs are identified as output unit-level costs.
Products make diverse demands on shared resources due to differences in volume, process steps, batch sizes, or overall complexity.
Products that a company is well-suited to manufacture yield small profits, whereas products that a company is less suited to manufacture display unexpectedly large profits.
Activity-Based Management (ABM) Framework and Strategic Applications
Definition of Activity-Based Management (ABM)
Activity-Based Management (ABM) is a method of management that uses Activity-Based Costing (ABC) information as an integral component in critical decision-making situations.
Key Applications and Decision-Making Benefits
ABM provides essential analytical support across four key organizational domains:
Pricing and Product-Mix Decisions: Re-evaluating product profitability to set competitive prices and adjust product volume mix.
Cost Reduction and Process Improvement Decisions: Streamlining operational workflows and eliminating non-value-added activity costs.
Design Decisions: Assessing how product design choices impact activity consumption and manufacturing costs.
Planning and Managing Activities: Enhancing operational budgeting, activity efficiency, and long-term capacity management.