Comprehensive Notes on Landscape Architecture Professional Practice
Fundamental Definitions and Ethics in Professional Practice
- Economic Dependency on Environment: The long-term economic survival of society is fundamentally dependent on the natural environment. Current global markets are increasingly hinged upon climate-related factors.
- Scope of Work vs. Scope of Services:
* Scope of Work: Describes the actual project program and physical parameters. It includes what the client needs (e.g., basketball courts, parking lots, playgrounds, 5-acre vs. 20-acre sites) and site specifics like zoning. It tells the professional everything known about the project itself.
* Scope of Services: Describes the distinct tasks and professional duties performed to deliver the project. Examples include zoning changes, design reviews, schematic design, hardscape, planting, irrigation, lighting, specifications, and contract administration (CA).
- The Code of Ethics: The purpose of a code of ethics within a profession is to create a level playing field, ensuring all practitioners play by the same rules and standards regarding the profession, the environment, clients, and staff.
- Professional Obligations to Clients:
* Trust and the maintenance of solid contracts.
* Adherence to core values.
* Providing honest guidance and advice for the best interest of the client's finances.
* Delivering results that are both functional and aesthetically pleasing.
* Ensuring safety and accessibility in all designs.
* Maintaining legality: Adhering to utility sign-offs (e.g., Nevada Power, SNWA/Las Vegas Water District, Southwest Gas).
* Confidentiality: Not discussing projects outside the professional arena.
* Value for Services: Ensuring fees are not "out of whack" with market standards.
* Possession of Required Skills: Professionals must actually possess the skills they claim to have (e.g., designing irrigation for multiple ball fields or parking lots).
* Honesty in Marketing: All social media and marketing materials must be true. Misrepresenting a role on a project (e.g., claiming to be a Project Manager when one was a drafter) can lead to the loss of a license or being removed from agency or "on-call" lists (e.g., EN DOT).
Marketing and Business Development
- Basic Marketing Approach:
1. Understand your specific skills and the services you can offer.
2. Identify who needs those specific services.
3. Identify how to communicate your unique ability to provide those services.
- Marketing Documents:
* Statement of Interest: A document submitted to express interest in a project or job. Often required by government entities to narrow the list of firms that will receive an RFQ or RFP.
* Request for Qualifications (RFQ): Requests only the qualifications of a firm.
* Request for Proposal (RFP): A formal proposal to do work that must include a scope of work, scope of services, and professional fees.
- Business Development (BD):
* Firms often employ a Business Development Director whose sole job is to build relationships and track upcoming projects.
* Public portfolios require active pursuit of work because public entities must post projects.
* Teaming and Niche Markets: Professionals often team with others to cover experience gaps (e.g., high-end residential specialist teaming with an environmental work specialist).
* Exclusivity: Firms may decide to be exclusive with a lead or not, depending on the client and project type.
* Joint Ventures: An innovative approach where two firms may lead a project together, as opposed to a traditional Prime/Sub relationship.
Professional Organizations and Licensure
- CLARB (Council of Landscape Architectural Registration Boards):
* Administers the national exam (LARE).
* Functions as a "warehouse" for professional records, including school transcripts, test scores, and references.
* Note: CLARB does not grant licenses; they only report data to state boards.
- State Board (e.g., Nevada State Board of Architecture, Interior Design, and Residential Design):
* Administers the state-specific exam.
* Holds the final power to grant or deny licensure to an applicant based on background checks and CLARB records.
- Licensure Requirements in Nevada:
* An accredited degree from a university.
* 2\text{ years} of experience under a licensed landscape architect.
* Successful completion of the four LARE exams.
- Professional Obligations to the Profession:
1. Social Leadership: Providing public service.
2. Improvement of the Profession: Conducting research and providing reforms.
3. Preservation/Enhancement of the Role: Maintaining licensure and professional relevancy through Continuing Education Units (CEUs) and professional societies like the ASLA.
4. Providing internships for the "novice generation."
5. Developing professional judgment.
6. Refraining from "badmouthing" the competition.
- Flexner’s Definition of a Profession (Abraham Flexner, 1915/1950, Columbia University):
1. Involves a store of knowledge that is ordinarily complex.
2. Is an intellectual enterprise.
3. Applies theoretical/complex knowledge to human and social problems.
4. Strives to add to the stock of knowledge (Research).
5. Passes knowledge to novice generations via universities.
6. Organizes into peer formations to establish criteria for admission, practice, and conduct.
Firm Structure and Statutory Definitions
- Forms of Firm Ownership:
* Sole Proprietorship.
* Partnership.
* Corporation (e.g., S-Corp or C-Corp).
* Limited Liability Company (LLC).
- Sole Proprietorship Disadvantages: There is no legal distinction between the company and the proprietor. Personal assets (including a house) are liable for company debts or lawsuits.
- Employee Manuals: Should include personnel policies such as benefits, Personal Time Off (PTO) accrual and eligibility, conflict resolution instructions, dress code, hours of operation, and holiday schedules (e.g., some firms only give Veterans Day to veterans).
- Nevada Revised Statutes (NRS):
* NRS 223A.032: Defines a Certificate Holder as someone licensed in the state, active, and in good standing.
* NRS 623A.004: Defines Instruments of Service as the physical forms of deliverables: drawings, specifications, sketches, reports, master plans, renderings, details, and narratives.
* NRS 623A.065: Defines Good Moral Character. Requirements include not being in jail, not owing child support, not having a revoked certificate, and not having felonies or misdemeanors related to the profession (e.g., embezzlement).
Fee Calculation and Project Management
- Fee Calculation Methods:
* By the Sheet: A flat rate per drawing sheet.
* By project size/acreage: Calculating fees based on the total area.
* Essential Constant: 1acre=43,560sq ft.
* Percentage of Construction Budget: Usually a percentage of the total landscape construction budget.
* Lump Sum Fee: A single total fee for the project rather than hourly billing.
- The Hub and Spoke Method: A project structure where the Prime (Lead) is the hub, and all sub-consultants (Civil, Mechanical, Electrical, Environmental) and the client are the spokes. All communication must go through the hub unless permission is granted.
- Project Management (PM):
* For the Client: Delivering a well-designed project on time and on budget.
* For the Office: Delivering a well-designed project on time and on budget, while also generating a profit.
* Tasks: Assembling the team, managing the schedule (milestones, deadlines, critical path), managing internal and external budgets, managing resources, and managing sub-consultants.
- Standard of Care: The level of service or performance that any other reasonable landscape architect would provide in a same or similar situation.
- Staff Organization Types:
1. Vertical.
2. Horizontal.
3. Hybrid (Combination of Vertical and Horizontal).
4. Matrix / Studio.
Legal Obligations, Insurance, and Liability
- Tort: A civil wrong that harms another person by violating a protected right.
- Three Ways Legal Obligations are Incurred:
1. Contract: Breach of a written agreement.
2. Statute: Violation of federal, state, or local laws.
3. Common Law: Following precedents and court decisions.
- Liability Insurance: Often termed Errors and Omissions (E&O). It covers:
1. Negligent Acts.
2. Errors.
3. Omissions.
* Underwriting: The process of evaluating risk.
* Premiums: Based on the type of work, location of work, number of licensed professionals, and claim history.
* Per Claim vs. Aggregate Claim: "Per claim" is the cap on a single event; "Aggregate" is the total cap for all claims in a period.
- General Business Insurance: Covers the physical office, computers, furniture, and interruption of business.
* Anecdote: A firm's window shattered by a rock or a drone lost in high winds (and subsequently stolen) would be covered under this insurance.
- Elements of a Successful Negligence Suit:
1. Duty: A failure to act according to a reasonable standard.
2. Breach: Failure by action, error, or omission.
3. Cause: The breach/failure is the proximate cause of the harm.
4. Damage: Actual physical or financial harm.
Technical Specifications
- CSI Format: The Construction Specification Institute (CSI) MasterFormat is the industry standard.
* Division 32: Covers Exterior Improvements, including site improvements and landscaping.
- Types of Specifications:
1. Descriptive: A "recipe" style, step-by-step instruction (e.g., how to dig a hole, fill with water, and wait 24 hours for drainage).
2. Performance: Work must meet a specific standard (e.g., concrete strength/PSI for a shade structure vs. a sidewalk).
3. Proprietary: Specifically names a manufacturer’s product (e.g., Rain Bird irrigation). Used to ensure quality and avoid rewriting manufacturer specs, which carries risk.
- Standards and References:
* ASTM: American Society of Testing and Materials.
* ANSI: American National Standards Institute.
- Or Equal Clause: Often required by government agencies to provide at least two options and an "or equal" alternative to prevent monopolies, though exceptions exist for system compatibility.
Contract Administration (CA) and Project Delivery
- Contract Administration Role: The professional acts as the owner's agent during construction to ensure the project meets the design intent. This is different from Construction Management.
- Project Delivery Methods:
1. Design-Bid-Build (Traditional): Client hires a designer, the design goes to bid, a contractor is selected. Oldest form; often leads to the client picking the lowest bidder.
2. CMAR (Construction Manager at Risk): Contractor is involved early (e.g., at 30% design). They provide a Guaranteed Maximum Price (GMP). It creates a partnership approach with open costs.
3. Design-Build: The designer and contractor are part of the same team from the start. Preferred by many for total coordination.
4. On-Call: A list maintained by government agencies. Firms on the list are given work orders for specific projects as they arise.
- Submittals and Inspections:
* Submittals: The contractor must submit product data for approval against specs (e.g., ensuring "camo" tan-colored drip heads are used instead of cheaper black ones).
* Payment Applications: Invoices from the contractor that the LA must verify as accurate regarding work completed and materials delivered.
* RFI (Request for Information): Questions from the contractor to clarify design intent.
* Punch List: A document created at the end of a project during the final walk-through listing items that must be fixed or finished before final payment.