PMBOK Guide Sixth Edition Summary Notes
PROJECT INTEGRATION MANAGEMENT
Overview: Unifies processes and activities across the project lifecycle. Accountability rests solely with the project manager.
Develop Project Charter: Formally authorizes the project and grants authority to the project manager. Inputs include business documents (Business Case, Benefits Management Plan) and agreements.
Develop Project Management Plan: Consolidates subsidiary plans into a baseline. Once baselined, changes require formal change control.
Direct and Manage Project Work: Leading the execution of activities and implementing approved changes.
Manage Project Knowledge: Leveraging existing and creating new knowledge. Distinguishes between explicit knowledge (codified) and tacit knowledge (personal/context-based).
Monitor and Control Project Work: Tracking progress against performance objectives via data analysis (Trend, Variance, Root Cause).
Perform Integrated Change Control: Reviewing, approving, and managing changes to deliverables and documents. Often utilizes a Change Control Board (CCB).
Close Project or Phase: Finalizing all activities, archiving information, and releasing resources.
PROJECT SCOPE MANAGEMENT
Scope Definition: Includes Product Scope (features/functions) and Project Scope (work to deliver features).
Collect Requirements: Determining stakeholder needs. Uses tools like Context Diagrams and Prototyping.
Create WBS: Hierarchical decomposition of total work into Work Packages. Follows the rule (total work at lower levels rolls up to the top).
Scope Baseline: Consists of the Project Scope Statement, WBS, and WBS Dictionary.
Validate Scope: Formal acceptance of completed deliverables by the customer.
Control Scope: Monitoring status and managing changes to prevent Scope Creep.
PROJECT SCHEDULE MANAGEMENT
Precedence Diagramming Method (PDM): Links activities via four relationships: FS, FF, SS, SF.
Estimating Durations: Uses Analogous (top-down), Parametric (statistical), or Three-Point Estimating (Triangular: ).
Critical Path Method (CPM): Identifies the longest path with zero total float, determining the minimum project duration.
Schedule Compression:
Crashing: Adding resources to shorten duration for least incremental cost.
Fast Tracking: Performing sequential activities in parallel.
PROJECT COST MANAGEMENT
Earned Value Management (EVM):
Planned Value (PV): Budget for scheduled work.
Earned Value (EV): Value of work actually performed.
Actual Cost (AC): Cost incurred for work performed.
Variances: ; .
Indices: ; .
Estimate at Completion (EAC): Forecasting the total cost based on current performance (e.g., ).
Cost Baseline: Time-phased project budget excluding management reserves.
PROJECT QUALITY MANAGEMENT
Core Concept: Prevention is preferred over inspection. Quality (conformance) vs. Grade (technical characteristics).
Manage Quality: Translating the plan into executable activities (Quality Assurance).
Control Quality: Verifying deliverables meet standards. Uses Control Charts, Check Sheets, and Statistical Sampling.
Cost of Quality (COQ): Conformance costs (Prevention, Appraisal) vs. Nonconformance costs (Internal/External Failure).
PROJECT RESOURCE MANAGEMENT
Team Development: Following the Tuckman Ladder (Forming, Storming, Norming, Performing, Adjourning).
Conflict Management: Five techniques: Withdraw, Smooth, Compromise, Force, and Collaborate.
Responsibility Assignment Matrix (RAM): Often represented as a RACI chart (Responsible, Accountable, Consult, Inform).
PROJECT RISK MANAGEMENT
Identify Risks: Finding individual and overall project risks.
Qualitative Analysis: Prioritizing risks via Probability and Impact Matrix.
Quantitative Analysis: Numerical modeling using Monte Carlo Simulation, Decision Trees, and Tornado Diagrams.
Strategies for Threats: Escalate, Avoid, Transfer, Mitigate, Accept.
Strategies for Opportunities: Escalate, Exploit, Share, Enhance, Accept.
PROJECT PROCUREMENT MANAGEMENT
Contract Types:
Fixed-Price: Firm Fixed Price (FFP), Incentive Fee (FPIF).
Cost-Reimbursable: CPFF, CPIF, CPAF.
Hybrid: Time and Material (T&M).
Source Selection: Criteria include capability, cost, and technical expertise.
PROJECT STAKEHOLDER MANAGEMENT
Engagement Levels: Unaware, Resistant, Neutral, Supportive, Leading.
Stakeholder Analysis: Categorizing by Power, Interest, Influence, or Impact using grids or the Salience Model.