Chapter 5 Civil Analytical: Abbreviations, Regulations, and Civil Graphic Symbols
Civil Analytical Conventions, Calculations, and Symbols
Mathematical Formulas for Civil Analytical Calculations:
Area: Calculated by multiplying length by width, expressed in square meters:
Perimeter: Calculated as the total distance around the boundary, expressed in meters:
Civil Abbreviations:
BL: Building Line (Afrikaans: Boulyn)
G: Gulley (Afrikaans: Rioolput / R)
MH: Manhole (Afrikaans: Mangat / MG)
NTS: Not to Scale (Afrikaans: Nie Volgens Skaal / NVS)
IC: Inspection Chamber (Afrikaans: Inspeksiekamer / IK)
RE: Rodding Eye (Afrikaans: Steekoog / SO)
IE: Inspection Eye (Afrikaans: Inspeksie Oog / IO)
RWDP / RWP: Rainwater Downpipe / Rainwater Pipe (Afrikaans: Reënwaterafvoerpyp / RWAP)
IP: Inspection Pipe (Afrikaans: Inspeksie Pyp)
BIC: Built-in Cupboard (Afrikaans: Ingeboude Kaste / IGK)
IEB: Inspection Eye Bend
PP: Picture Plane
HL: Horizon Line
GL: Ground Line
SP: Station Point
LVP: Left Vanishing Point
RVP: Right Vanishing Point
FFL: Finished Floor Level (Afrikaans: Vloervlak)
NGL: Natural Ground Level
DPC: Damp Proof Course
WB: Wash-Basin (Afrikaans: Handwasbak)
WT: Wash Tub / Wash Trough (Afrikaans: Wastrog)
WC: Water-Closet / Toilet (Afrikaans: Spoelkloset / SK)
SH: Shower (Afrikaans: Stort / ST)
S: Sink (Afrikaans: Opwasbak / OWB)
B: Bath (Afrikaans: Bad)
BT: Bidet
U: Urinal (Afrikaans: Urinaal)
Colour Conventions (National Building Regulations / SANS 10400 / SABS 0143):
Red: Masonry / Klipmesselwerk; also designates Proposed Work on Site Plans (Voorgestelde Werk / Terreinplan).
Green: Concrete / Beton.
Blue: Iron & Steel / Yster & Staal.
Yellow: Wood / Hout.
Black: Glass / Glas.
Grey: Existing Materials / Bestaande Materiale.
Brown: Drainage and Sewerage / Dreinering en Riolering.
Pencil Linework Guidelines and Site Plan Conventions:
Short Broken-Line (B-Type): Used to indicate hidden detail (verborge besonderhede), work not visible, and structures or items to be demolished or removed on civil site plans (werk moet verwyder word / struktuur gesloop).
A-Line: Used for Drainage and Sewerage pipelines on site plans.
B-Line: Used for demarcation of the Building Line (BL) and structures to be demolished.
Demolition Annotations: Demolished elements must be labeled clearly (e.g., "Existing driveway & building to be demolished" / Bestaande oprit & gebou moet gesloop word).
Site and Civil Graphic Symbols:
Gully (G): Represented by concentric square frames depicting the external trap and internal basin.

Grease Trap: Represented by a subdivided rectangular chamber.

Water Meter: Represented by a circular boundary intersected by pipeline lead-in and lead-out markings.

Water-Storage Tank: Represented by a rectangular container surmounted by an uppercase "W".

Electrical Meter (Watt Meter): Represented by a square enclosure containing a centralized uppercase "W".

North Point: Represented by a circle quartered by perpendicular axes with a shaded pointing directional chevron indicating true North.

Ramp: Outlined as an inclined path annotated with its specific gradient ratio (e.g., ) and a full-length central directional arrow. The direction of the arrow must always point "up" the incline across its entire length.

Staircase: Drawn with parallel treads showing a centered travel arrow. The directional arrow must always point "up" the stairs for the full run of the flight.

Tree: Represented in plan view as a segmented circle displaying branch and canopy venation.

Smoke Detector: Indicated by a circular symbol enclosing the capital letters "SD".
Sprinkler System: Indicated by a circular symbol enclosing a stylized capital letter "S".
Contour Line: Continuous line depicting natural ground elevation.
Boundary Line: Demarcation line enclosing the site perimeter.
Sewer Line: Indicated as an unbroken line or designated chain line representing underground foul water discharge pipes.
Corner Height: Designated site elevation at a specified peg or boundary corner.
Rules for Analytical Questions:
Read every question carefully.
Do not make assumptions regarding measurements or features.
Count only features that are specifically requested.
Memorize standard and non-standard SANS civil graphic symbols.
Two-Point Perspective Drawing
Perspective Identification and Setup Elements:
PP (Picture Plane): The transparent plane onto which the perspective view is projected.
HL (Horizon Line): The horizontal eye-level reference line where vanishing points reside.
GL (Ground Line): The horizontal datum line where the object touches the ground level.
SP (Station Point): The fixed point of observation from which the viewer observes the object.
LVP (Left Vanishing Point): The convergence point located on the horizon line to the left.
RVP (Right Vanishing Point): The convergence point located on the horizon line to the right.
Execution Standards:
Accurately project and label both LVP and RVP on the Horizon Line.
Apply setup construction angles accurately, utilizing standard set-square angles (, , or ).
Maintain strict geometric projection of points down from the Picture Plane (PP) to establish vertical and horizontal guidelines.
Verify and construct all visible floor and interior wall lines seen through window openings and doorways to convey proper depth.
Common Errors to Avoid:
Forgetting to write the explicit labels for LVP and RVP.
Inaccurately projecting coordinate points downwards after intersecting the PP line.
Omitting interior depth details (e.g., visible interior wall segments and floor returns visible through apertures).
Floor Plan Execution and Sanitary Fixtures
General Floor Plan Standards:
Scale: Scale all dimensions by dividing original millimeter values by (Scale ).
Dimensioning: When placing dimensions on the drawing, always record the original full-scale dimension values, never the scaled-down drawing measurements.
External Walls: Drawn to full specified structural thickness.
Internal Walls: Drawn to half thickness relative to external cavity walls.
Hatching: Sectioned brickwork and masonry walls must be hatched using continuous lines drawn at a angle (Civil Hatching).
Window Details: Drawn in correct wall cutouts showing outer sills, frames, and glazing lines.
Door Construction Rules:
Align the door frame centered in the width of the wall.
Ensure correct door leaf thickness.
Draw the door swing arc (door throw) precisely with a drawing compass.
External doors must indicate the stepped floor level change down to the exterior.
Room Labels and Finishes: Letter all room descriptions and flooring specifications in uppercase block lettering (5 mm BLOCK CAPITALS).
Sanitary Fixture Conventions (Plan and Elevation Views):
Wash-Basin (WB / Handwasbak): Rectangular basin with an internal waste outlet and rear splash zone.

Sink (S / Opwasbak): Single-bowl or double-bowl configurations with integrated drying board and designated drain outlets.

Shower (SH / Stort): Square or rectangular shower cubicle tray with corner or central waste outlet.

Bath (B / Bad): Rectangular vessel with an inclined end wall in elevation and circular/square outlet drain.

Urinal (U / Urinaal) & Wash Tub (WT / Wastrog): Includes slab/stall type urinals and wall-mounted urinals, alongside freestanding laundry wash tubs.

Water-Closet (WC / Toilet / Spoelkloset): Cistern tank combined with waste pan.
Bidet (BT): Low-mounted plumbing fixture for personal hygiene.
Built-in Cupboard (BIC / Ingeboude Kaste): Outlined storage unit with internal storage divisions.
Electrical Architectural Symbols:
Distribution Board: Hollow rectangle symbol.
Earth: Vertical lead terminating in horizontal decreasing ground bars.
One-Way Switch – Single Pole: Open circuit toggle line with a single terminal circle.
One-Way Switch – Double Pole: Toggle line intersecting two offset parallel terminal markings.
One-Way Switch – Triple Pole: Toggle line intersecting three terminal markings.
Two-Way Switch: Double-ended toggle line linking two terminal contacts.
Regulating Switch: Switch symbol crossed with an oblique arrow line.
Socket Outlet: Semicircular symbol resting on a lead wire.
Switched Socket Outlet: Semicircular socket symbol with an attached integrated switch tick.
Ceiling Light: Symmetrical diagonal cross ().
Wall Mounted Light: Symmetrical cross attached directly to a wall line by a bracket support.
Fluorescent Light: Elongated bar symbol with transverse termination ends.
Sectioned Elevation Execution
Reference Levels and Essential Annotations:
Establish and label the NGL (Natural Ground Level).
Establish and label the FFL (Finished Floor Level).
Indicate the DPC (Damp Proof Course) layer horizontally at the specified floor-wall interface.
Title the completed drawing explicitly as SECTIONED ELEVATION ON A-A.
Structural Masonry, Hatching, and Openings:
Construct foundations to exact depth, thickness, and footing projection dimensions.
Hatch all sectioned brick and concrete masonry walls at .
Accurately draw doors, window frames, lintels, and external sills.
Draw glazing panels clearly inside frames.
Show directional window opening leaves using thin dashed or chain lines.
Roof Assembly Components:
Wall Plates: Timber plates resting on wall heads to distribute roof loads.
Trusses and Truss Plates: Roof framing members connected by gusset/truss gang-plates.
Purlins: Horizontal timbers spanning across rafters to support roof sheeting.
Roof Sheeting: Exterior roof covering profile extending over external walls.
Roof Overhangs: Exact cantilevered projection of eaves beyond the exterior wall face.
Ceiling Battens and Ceiling Board: Ceiling support strips and boards affixed beneath the lower chord of the truss.
Fascia Boards: Horizontal boards attached at the lower eaves ends.
Barge Boards: Inclined timber boards fixed to the gable ends of the roof assembly.
Common Sectioned Elevation Mistakes:
Inaccurate footing and foundation spacing or alignment.
Omitting critical roof elements such as wall plates, purlins, or truss plates.
Applying incorrect hatching angle, line weight, or line spacing.
Forgetting mandatory reference labels (FFL, NGL, DPC, section title).
Drawing linework freehand when technical drawing instruments (rules, set squares, templates) are required.
Examination Strategy and Time Management
Reading Time:
Read thoroughly through the entire question paper.
Mentally solve Question 1 (Analytical) during reading time to streamline early production.
Question 1: Civil Analytical (20 Marks):
Time Allocation: Spend a maximum of .
Work systematically to verify all counts, standard symbols, and area/perimeter formulas.
Question 2: Two-Point Perspective (40 Marks):
Time Allocation: Spend .
Construct all vanishing lines systematically, verify angles, and check interior perspective depth lines.
Question 3: Civil Assembly (100 Marks):
Time Allocation: Spend .
Step 1: Read the entire question completely before making any marks.
Step 2: Scale all dimensions immediately by dividing by (Scale ).
Step 3: Draw the plan view, elevation, or section with proper hatching, fixtures, and labels.
Step 4: Return to the question prompt and systematically cross-reference every checklist item to ensure zero omissions.