Chapter 5 Civil Analytical: Abbreviations, Regulations, and Civil Graphic Symbols

Civil Analytical Conventions, Calculations, and Symbols

  • Mathematical Formulas for Civil Analytical Calculations:

    • Area: Calculated by multiplying length by width, expressed in square meters:
          AREA=L×W=m2\text{AREA} = L \times W = \text{m}^2

    • Perimeter: Calculated as the total distance around the boundary, expressed in meters:
          PERIMETER=∑All Sides=m\text{PERIMETER} = \sum \text{All Sides} = \text{m}

  • Civil Abbreviations:

    • BL: Building Line (Afrikaans: Boulyn)

    • G: Gulley (Afrikaans: Rioolput / R)

    • MH: Manhole (Afrikaans: Mangat / MG)

    • NTS: Not to Scale (Afrikaans: Nie Volgens Skaal / NVS)

    • IC: Inspection Chamber (Afrikaans: Inspeksiekamer / IK)

    • RE: Rodding Eye (Afrikaans: Steekoog / SO)

    • IE: Inspection Eye (Afrikaans: Inspeksie Oog / IO)

    • RWDP / RWP: Rainwater Downpipe / Rainwater Pipe (Afrikaans: Reënwaterafvoerpyp / RWAP)

    • IP: Inspection Pipe (Afrikaans: Inspeksie Pyp)

    • BIC: Built-in Cupboard (Afrikaans: Ingeboude Kaste / IGK)

    • IEB: Inspection Eye Bend

    • PP: Picture Plane

    • HL: Horizon Line

    • GL: Ground Line

    • SP: Station Point

    • LVP: Left Vanishing Point

    • RVP: Right Vanishing Point

    • FFL: Finished Floor Level (Afrikaans: Vloervlak)

    • NGL: Natural Ground Level

    • DPC: Damp Proof Course

    • WB: Wash-Basin (Afrikaans: Handwasbak)

    • WT: Wash Tub / Wash Trough (Afrikaans: Wastrog)

    • WC: Water-Closet / Toilet (Afrikaans: Spoelkloset / SK)

    • SH: Shower (Afrikaans: Stort / ST)

    • S: Sink (Afrikaans: Opwasbak / OWB)

    • B: Bath (Afrikaans: Bad)

    • BT: Bidet

    • U: Urinal (Afrikaans: Urinaal)

  • Colour Conventions (National Building Regulations / SANS 10400 / SABS 0143):

    • Red: Masonry / Klipmesselwerk; also designates Proposed Work on Site Plans (Voorgestelde Werk / Terreinplan).

    • Green: Concrete / Beton.

    • Blue: Iron & Steel / Yster & Staal.

    • Yellow: Wood / Hout.

    • Black: Glass / Glas.

    • Grey: Existing Materials / Bestaande Materiale.

    • Brown: Drainage and Sewerage / Dreinering en Riolering.

  • Pencil Linework Guidelines and Site Plan Conventions:

    • Short Broken-Line (B-Type): Used to indicate hidden detail (verborge besonderhede), work not visible, and structures or items to be demolished or removed on civil site plans (werk moet verwyder word / struktuur gesloop).

    • A-Line: Used for Drainage and Sewerage pipelines on site plans.

    • B-Line: Used for demarcation of the Building Line (BL) and structures to be demolished.

    • Demolition Annotations: Demolished elements must be labeled clearly (e.g., "Existing driveway & building to be demolished" / Bestaande oprit & gebou moet gesloop word).

  • Site and Civil Graphic Symbols:

    • Gully (G): Represented by concentric square frames depicting the external trap and internal basin.

    

Gully graphic symbol
  • Grease Trap: Represented by a subdivided rectangular chamber.

    

Grease trap graphic symbol
  • Water Meter: Represented by a circular boundary intersected by pipeline lead-in and lead-out markings.

    

Water meter graphic symbol
  • Water-Storage Tank: Represented by a rectangular container surmounted by an uppercase "W".

    

Water storage tank graphic symbol
  • Electrical Meter (Watt Meter): Represented by a square enclosure containing a centralized uppercase "W".

    

Electrical meter / watt meter graphic symbol
  • North Point: Represented by a circle quartered by perpendicular axes with a shaded pointing directional chevron indicating true North.

    

North point indicator symbol
  • Ramp: Outlined as an inclined path annotated with its specific gradient ratio (e.g., 1:101:10) and a full-length central directional arrow. The direction of the arrow must always point "up" the incline across its entire length.

    

Ramp drawing symbol showing direction arrow and gradient
  • Staircase: Drawn with parallel treads showing a centered travel arrow. The directional arrow must always point "up" the stairs for the full run of the flight.

    

Staircase drawing symbol with upward direction arrow
  • Tree: Represented in plan view as a segmented circle displaying branch and canopy venation.

    

Tree representation symbol on site plan
  • Smoke Detector: Indicated by a circular symbol enclosing the capital letters "SD".

  • Sprinkler System: Indicated by a circular symbol enclosing a stylized capital letter "S".

  • Contour Line: Continuous line depicting natural ground elevation.

  • Boundary Line: Demarcation line enclosing the site perimeter.

  • Sewer Line: Indicated as an unbroken line or designated chain line representing underground foul water discharge pipes.

  • Corner Height: Designated site elevation at a specified peg or boundary corner.

    • Rules for Analytical Questions:

  • Read every question carefully.

  • Do not make assumptions regarding measurements or features.

  • Count only features that are specifically requested.

  • Memorize standard and non-standard SANS civil graphic symbols.

Two-Point Perspective Drawing

  • Perspective Identification and Setup Elements:

    • PP (Picture Plane): The transparent plane onto which the perspective view is projected.

    • HL (Horizon Line): The horizontal eye-level reference line where vanishing points reside.

    • GL (Ground Line): The horizontal datum line where the object touches the ground level.

    • SP (Station Point): The fixed point of observation from which the viewer observes the object.

    • LVP (Left Vanishing Point): The convergence point located on the horizon line to the left.

    • RVP (Right Vanishing Point): The convergence point located on the horizon line to the right.

  • Execution Standards:

    • Accurately project and label both LVP and RVP on the Horizon Line.

    • Apply setup construction angles accurately, utilizing standard set-square angles (30∘30^\circ, 45∘45^\circ, or 60∘60^\circ).

    • Maintain strict geometric projection of points down from the Picture Plane (PP) to establish vertical and horizontal guidelines.

    • Verify and construct all visible floor and interior wall lines seen through window openings and doorways to convey proper depth.

  • Common Errors to Avoid:

    • Forgetting to write the explicit labels for LVP and RVP.

    • Inaccurately projecting coordinate points downwards after intersecting the PP line.

    • Omitting interior depth details (e.g., visible interior wall segments and floor returns visible through apertures).

Floor Plan Execution and Sanitary Fixtures

  • General Floor Plan Standards:

    • Scale: Scale all dimensions by dividing original millimeter values by 5050 (Scale 1:501:50).

    • Dimensioning: When placing dimensions on the drawing, always record the original full-scale dimension values, never the scaled-down drawing measurements.

    • External Walls: Drawn to full specified structural thickness.

    • Internal Walls: Drawn to half thickness relative to external cavity walls.

    • Hatching: Sectioned brickwork and masonry walls must be hatched using continuous lines drawn at a 45∘45^\circ angle (Civil Hatching).

    • Window Details: Drawn in correct wall cutouts showing outer sills, frames, and glazing lines.

    • Door Construction Rules:

    • Align the door frame centered in the width of the wall.

    • Ensure correct door leaf thickness.

    • Draw the door swing arc (door throw) precisely with a drawing compass.

    • External doors must indicate the stepped floor level change down to the exterior.

    • Room Labels and Finishes: Letter all room descriptions and flooring specifications in 5 mm5\,\text{mm} uppercase block lettering (5 mm BLOCK CAPITALS).

  • Sanitary Fixture Conventions (Plan and Elevation Views):

    • Wash-Basin (WB / Handwasbak): Rectangular basin with an internal waste outlet and rear splash zone.

    

Wash-basin plan and elevation views
  • Sink (S / Opwasbak): Single-bowl or double-bowl configurations with integrated drying board and designated drain outlets.

    

Single and double sink plan and elevation views
  • Shower (SH / Stort): Square or rectangular shower cubicle tray with corner or central waste outlet.

    

Shower tray plan and elevation views
  • Bath (B / Bad): Rectangular vessel with an inclined end wall in elevation and circular/square outlet drain.

    

Bath plan and elevation views
  • Urinal (U / Urinaal) & Wash Tub (WT / Wastrog): Includes slab/stall type urinals and wall-mounted urinals, alongside freestanding laundry wash tubs.

    

Wash tub and urinal plan and elevation views
  • Water-Closet (WC / Toilet / Spoelkloset): Cistern tank combined with waste pan.

  • Bidet (BT): Low-mounted plumbing fixture for personal hygiene.

  • Built-in Cupboard (BIC / Ingeboude Kaste): Outlined storage unit with internal storage divisions.

    • Electrical Architectural Symbols:

  • Distribution Board: Hollow rectangle symbol.

  • Earth: Vertical lead terminating in horizontal decreasing ground bars.

  • One-Way Switch – Single Pole: Open circuit toggle line with a single terminal circle.

  • One-Way Switch – Double Pole: Toggle line intersecting two offset parallel terminal markings.

  • One-Way Switch – Triple Pole: Toggle line intersecting three terminal markings.

  • Two-Way Switch: Double-ended toggle line linking two terminal contacts.

  • Regulating Switch: Switch symbol crossed with an oblique arrow line.

  • Socket Outlet: Semicircular symbol resting on a lead wire.

  • Switched Socket Outlet: Semicircular socket symbol with an attached integrated switch tick.

  • Ceiling Light: Symmetrical diagonal cross (×\times).

  • Wall Mounted Light: Symmetrical cross attached directly to a wall line by a bracket support.

  • Fluorescent Light: Elongated bar symbol with transverse termination ends.

Sectioned Elevation Execution

  • Reference Levels and Essential Annotations:

    • Establish and label the NGL (Natural Ground Level).

    • Establish and label the FFL (Finished Floor Level).

    • Indicate the DPC (Damp Proof Course) layer horizontally at the specified floor-wall interface.

    • Title the completed drawing explicitly as SECTIONED ELEVATION ON A-A.

  • Structural Masonry, Hatching, and Openings:

    • Construct foundations to exact depth, thickness, and footing projection dimensions.

    • Hatch all sectioned brick and concrete masonry walls at 45∘45^\circ.

    • Accurately draw doors, window frames, lintels, and external sills.

    • Draw glazing panels clearly inside frames.

    • Show directional window opening leaves using thin dashed or chain lines.

  • Roof Assembly Components:

    • Wall Plates: Timber plates resting on wall heads to distribute roof loads.

    • Trusses and Truss Plates: Roof framing members connected by gusset/truss gang-plates.

    • Purlins: Horizontal timbers spanning across rafters to support roof sheeting.

    • Roof Sheeting: Exterior roof covering profile extending over external walls.

    • Roof Overhangs: Exact cantilevered projection of eaves beyond the exterior wall face.

    • Ceiling Battens and Ceiling Board: Ceiling support strips and boards affixed beneath the lower chord of the truss.

    • Fascia Boards: Horizontal boards attached at the lower eaves ends.

    • Barge Boards: Inclined timber boards fixed to the gable ends of the roof assembly.

  • Common Sectioned Elevation Mistakes:

    • Inaccurate footing and foundation spacing or alignment.

    • Omitting critical roof elements such as wall plates, purlins, or truss plates.

    • Applying incorrect hatching angle, line weight, or line spacing.

    • Forgetting mandatory reference labels (FFL, NGL, DPC, section title).

    • Drawing linework freehand when technical drawing instruments (rules, set squares, templates) are required.

Examination Strategy and Time Management

  • Reading Time:

    • Read thoroughly through the entire question paper.

    • Mentally solve Question 1 (Analytical) during reading time to streamline early production.

  • Question 1: Civil Analytical (20 Marks):

    • Time Allocation: Spend a maximum of 10 minutes10\,\text{minutes}.

    • Work systematically to verify all counts, standard symbols, and area/perimeter formulas.

  • Question 2: Two-Point Perspective (40 Marks):

    • Time Allocation: Spend 60 minutes60\,\text{minutes}.

    • Construct all vanishing lines systematically, verify angles, and check interior perspective depth lines.

  • Question 3: Civil Assembly (100 Marks):

    • Time Allocation: Spend 90 minutes90\,\text{minutes}.

    • Step 1: Read the entire question completely before making any marks.

    • Step 2: Scale all dimensions immediately by dividing by 5050 (Scale 1:501:50).

    • Step 3: Draw the plan view, elevation, or section with proper hatching, fixtures, and labels.

    • Step 4: Return to the question prompt and systematically cross-reference every checklist item to ensure zero omissions.