SECTION 07 52 00 - SBS MODIFIED BITUMINOUS MEMBRANE ROOFING
1. GENERAL
- Scope of Work: Installation of roofing materials purchased by Pomona Unified School District (PUSD) at Diamond Ranch High School over properly prepared substrates.
- Materials: Items in bold italics provided by District, other items to be furnished by Contractor; all materials by The Garland Company.
1.01 DECKING REQUIREMENTS
- Inspection: Inspect decking and alert inspector of discrepancies.
- Installation:
- For decks without insulation: Mechanically fasten red rosin and HPR Type II base sheet.
- For decks with insulation: Use red rosin, then insulation, followed by ¼” DensDeck Prime.
1.02 ROOFING ASSEMBLY INSTALLATION
- Drainage: Ensure all drains are functional before roofing; document any issues.
- Roof Hatch Replacement: Use BILCO model S-20 compliant with NRCA. Match existing dimensions.
- Asphalt Installation:
- Install Stressbase 80 hot asphalt (20% pre-consumer recycled content).
- Install flashings with StressPly E and other products per LEED standards.
1.03 SEALING AND COATING
- Penetrations and Vents: Seal with KEE-Lock mastic.
- Cool-Sil Coating: Required reflective coating per Title 24 specifications.
- Responsibilities: Roofing contractor to install sheet metal work including gutters, downspouts, edge flashing, and access accessories.
- Installation Standards: Conform to ASCE 7-16 and ANSI/SPRI ES1.
1.05 ENVIRONMENTAL CONSIDERATIONS
- Weather Limitations: Do not apply roofing during inclement weather or with rain forecasted.
- Debris Management: Maintain cleanliness on site and ensure proper disposal of materials.
2. PRODUCT SPECIFICATIONS
- Materials Overview: Roofing systems provided by The Garland Company.
- Warranty: Manufacturer to provide a 30-year No Dollar Limit warranty on labor and materials.
3. INSTALLATION REQUIREMENTS
- Examination: Ensure substrates are ready; document any unsuitable conditions.
- Heat Application: Use appropriate heating methods for asphalt; do not exceed temperature limits.
3.01 CUT-OFFS AND WATERSTOPS
- Protection: Protect exposed edges of incomplete work using organic felt and sealant.
3.05 CLEANING
- Site Cleanliness: Remove roofing material residue and follow manufacturer's cleaning instructions.
3.06 FINAL INSPECTION
- Inspections by Authorities: Conduct post-roofing inspections and address identified issues promptly.