Hose Connection and Transfer Orders
Check Cargo SDS and Transfer Orders: Confirm PPE requirements prior to commencing work.
Don the Correct PPE: Ensure appropriate personal protective equipment is worn as specified.
Bolt Installation:
Ensure a bolt is installed in every hole.
Bolts must extend beyond the nut face by a minimum of 3 threads.
Gasket Specifications:
Use a new 1/8" gasket.
Only a single gasket is permitted.
Flange Wraps:
Apply flange wraps prior to transfer startup.
Conduct Hose Inspection: Ensure the hose is suitable for the connection.
Insulating Flange or Bonding Cables: Verify presence and condition.
Secure Hose or Arm: Use a tag line for support.
Drip Pan Setup:
Remove drip pan covers.
Secure the hose or arm over the drip pan.
Loosen Bolts:
Loosen bottom header flange bolts slowly.
Loosen side flange bolts as necessary.
Verify the header is clear of pressure and liquid.
Remove Bolts:
Remove all bolts carefully.
Inspect Flange Face:
Inspect for damage, wear, or defect.
Align Hose Arm:
Align the hose arm to the header.
Insert 3 bolts at the flange bottom.
Gasket Installation:
Insert the new gasket properly.
Insert additional bolts in all holes.
Bolt Tightening:
Secure all bolts in a star pattern.
Ensure bolts extend beyond the nut face by at least 3 threads.
Pressure Test:
Conduct a pressure test on the dock hose arm connection.
Wrap dock hose arm connection as required.
Conduct PPE Check Again:
Recheck cargo SDS and transfer orders for PPE requirements.
Tag Line Use: Secure dock hose or arm with a tag line.
Loose Bolt Procedure:
Loosen bottom header bolts slowly.
Loosen side bolts as necessary while leaving top bolt tight.
Verify Conditions:
Ensure dock hose arm is clear of liquid and pressure.
Remove all bolts to detach the dock hose arm.
Remove Dock Hose Arm: Detach it carefully.
Gasket Material Removal: Remove all remnants of gasket material.
Inspect Flange Face: Check for pitting or damage.
Blind Installation: Align and install the blind with the dock hose or arm.
New Gasket Installation: Place a new gasket as needed.
Bolt Insertion: Insert a bolt in every hose flange hole.
Even Tightening: Tighten bolts evenly in a star pattern making sure to maintain the 3 threads rule.
Repeat for Barge Pipeline Header: Conduct the same procedure for the barge pipeline header.
Disconnect Bonding Cable: If applicable, ensure it is detached.
Drip Pan Covers Replacement: Reinstall the drip pan covers.
Conduct Post Transfer Inspection: Evaluate overall safety and integrity post-operation.
Check Cargo SDS and Transfer Orders: Confirm PPE requirements prior to commencing work.
Don the Correct PPE: Ensure appropriate personal protective equipment is worn as specified.
Bolt Installation:
Ensure a bolt is installed in every hole.
Bolts must extend beyond the nut face by a minimum of 3 threads.
Gasket Specifications:
Use a new 1/8" gasket.
Only a single gasket is permitted.
Flange Wraps:
Apply flange wraps prior to transfer startup.
Conduct Hose Inspection: Ensure the hose is suitable for the connection.
Insulating Flange or Bonding Cables: Verify presence and condition.
Secure Hose or Arm: Use a tag line for support.
Drip Pan Setup:
Remove drip pan covers.
Secure the hose or arm over the drip pan.
Loosen Bolts:
Loosen bottom header flange bolts slowly.
Loosen side flange bolts as necessary.
Verify the header is clear of pressure and liquid.
Remove Bolts:
Remove all bolts carefully.
Inspect Flange Face:
Inspect for damage, wear, or defect.
Align Hose Arm:
Align the hose arm to the header.
Insert 3 bolts at the flange bottom.
Gasket Installation:
Insert the new gasket properly.
Insert additional bolts in all holes.
Bolt Tightening:
Secure all bolts in a star pattern.
Ensure bolts extend beyond the nut face by at least 3 threads.
Pressure Test:
Conduct a pressure test on the dock hose arm connection.
Wrap dock hose arm connection as required.
Conduct PPE Check Again:
Recheck cargo SDS and transfer orders for PPE requirements.
Tag Line Use: Secure dock hose or arm with a tag line.
Loose Bolt Procedure:
Loosen bottom header bolts slowly.
Loosen side bolts as necessary while leaving top bolt tight.
Verify Conditions:
Ensure dock hose arm is clear of liquid and pressure.
Remove all bolts to detach the dock hose arm.
Remove Dock Hose Arm: Detach it carefully.
Gasket Material Removal: Remove all remnants of gasket material.
Inspect Flange Face: Check for pitting or damage.
Blind Installation: Align and install the blind with the dock hose or arm.
New Gasket Installation: Place a new gasket as needed.
Bolt Insertion: Insert a bolt in every hose flange hole.
Even Tightening: Tighten bolts evenly in a star pattern making sure to maintain the 3 threads rule.
Repeat for Barge Pipeline Header: Conduct the same procedure for the barge pipeline header.
Disconnect Bonding Cable: If applicable, ensure it is detached.
Drip Pan Covers Replacement: Reinstall the drip pan covers.
Conduct Post Transfer Inspection: Evaluate overall safety and integrity post-operation.