Building Systems Design - Selected Rules and Regulations

Rule IX: Sanitation

  • All buildings must have:
    • Adequate and potable water supply.
    • Adequate plumbing installation.
    • Suitable wastewater treatment or disposal system.
    • Stormwater drainage.
  • Potable water should come from municipal waterworks.
  • Water quality must meet National Standards for Drinking Water.
  • Sanitary sewage should discharge into the nearest street sewer.
  • If no sewer, use septic tanks.
  • Rainwater drainage shall not discharge into the sanitary system.
  • All plumbing must conform to the National Plumbing Code.

Rule X: Building Projections Over Public Streets

  • No projections beyond the property line unless allowed by code.
  • Footings at least 2.402.40 m below grade may project 300300 mm (max).
  • Foundations may encroach 500500 mm into the sidewalk if the top is at least 600600 mm below grade.
  • Projections must not obstruct utilities unless the owner pays for rerouting.
  • Balcony Projections:
    • Refer to Table X.1 for specific projections based on street width.
    • Clearance between street grade and balcony lowest portion must be at least 33 meters.
  • Arcades:
    • Allowed on sidewalks if permitted by building and zoning regulations.
    • Must be at least 33 meters above the sidewalk grade.
  • Canopies (Marquees):
    • Permanent roofed structure over a door or window.
    • Horizontal clearance from curb line: not less than 300300 mm.
    • Vertical clearance: not less than 33 m.
    • Constructed of incombustible material or 22-hour fire-resistive materials.
  • Movable Awnings or Hoods:
    • Horizontal clearance from curb line: not less than 300300 mm.
    • Vertical clearance: not less than 2.402.40 m.
  • Doors/Windows:
    • Must be at least 2.402.40 meters above pavement to project beyond the property line when opened, except fire exits.
  • Corner Buildings with Chaflans:
    • For streets less than 3.603.60 meters wide, a chaflan is required.
    • The length of the chaflan should be less than 4.004.00 meters.
    • No chaflan needed if the building is arcaded.

Rule XI: Protection of Pedestrians During Construction or Demolition

  • Streets, alleys, and sidewalks can only be used with a building permit and per the Rule's provisions.
  • Pedestrians must be protected during adjacent work.
  • Materials on public property, including fences and walkways, must be lighted between sunset and sunrise.
  • Materials shall not obstruct fire hydrants, alarm boxes, utility boxes, or drainage.
  • Mixing mortar/concrete on public streets is prohibited.
  • Utilities must be protected from damage.
  • Temporary Walkways:
    • Minimum width of 1.201.20 meters when a sidewalk is closed; can be reduced to 600600 mm if no sidewalk exists.
    • Not allowed if RROW is 55 meters wide or less.
  • Pedestrian Protection:
    • Protective railings are needed where the walkway is near the roadway or excavation; minimum height is 11 meter.
    • Fences must enclose the construction site; minimum height is 2.402.40 meters.
    • If the horizontal distance (X) between the outermost face of the building (OFB) and the inner edge of the sidewalk is more than half the building height (H/2), only a fence is required.
    • If X <= H/2, both a fence and canopy (at least 2.402.40 m above the walkway) are required.
  • Maintenance of Protective Devices: Must be in good order.
    • Sufficient light for safety.
    • Welding/cutting by TESDA-accredited workers.
    • Secure materials against wind.
    • Hoisting machinery with adequate brakes.
    • Platform hoists with covers.
    • Hoist towers on solid foundations.
    • Regularly lubricated derricks and cranes.
    • Tested ropes/cables.
    • Ladders not extended; maximum single ladder length is 6.006.00 meters. Use intermediate platforms for greater heights.
    • Runways/ramps with a slope not greater than 1:31:3, with a maximum rise of 1.801.80 meters between landings.
    • Scaffolds to support at least four times the maximum load.
    • Temporary flooring not more than three unfilled floors below the highest permanent floor.
    • Floor openings protected by barricades or guardrails (minimum 900900 mm high).
    • Guardrails and toe boards (top rail at least 900900 mm, intermediate rail provided).
  • Removal: Protective fences/canopies must be removed within 30 days after protection is no longer required.
  • Demolition:
    • Adjoining owners must be notified before demolition.
    • Shoring is needed to prevent movement.
    • Demolish floor-by-floor if possible.
  • Other Safeguards:
    • Skilled workmen and supervision required.
    • Report unsafe equipment.
    • Walkways free of protruding nails.
    • Machinery must maintain a 5.005.00 m clearance from overhead electrical facilities.
    • Workers must wear safety helmets and protective gear.
    • Enclosed flame heaters in fire zones.
    • Constant heater supervision.
    • Clean toilet facilities.
    • Potable water and washing facilities.
    • First aid supplies; first-aid room for >200 workers.