Payment Integration Project – Internal Meeting Notes
Card Testing & Decline Simulation
- Current test card marked as “declined” still approves in sandbox.
- Reminder: both a special card and a specific dollar amount must be entered to force a decline.
- Action: Peter previously e-mailed the correct test matrix; he will forward to Benoit immediately.
Posting File (Batch Settlement)
- DMV team already delivered the “standard posting file” specifications.
- Specs presumed complete; no further gaps identified.
RTPNS – Real-Time Payment Notification Service
- Needed items: IP addresses & DNS endpoints to which payment notifications will be pushed.
- Status by environment:
- SFTP UAT: many IPs already whitelisted.
- Prod: still pending.
- Specific gaps
- No real-time notification hostnames from either DMV or ETIMS yet.
- Benoit claims callback URLs for test and prod were shared earlier; will resend.
- Action: Peter to e-mail Benoit/Ruby list of missing endpoints for confirmation.
Demo / Project Timeline
- Targeted internal demo originally mid-July; slipped to August.
- POS component still the long pole.
- Arvin has just returned from PTO; will provide revised date.
- Google Pay, Apple Pay & other digital-wallet testing begun.
- SDK integration for mobile app under way; refunds still being vetted.
- Overall go-live unaffected; demo now scheduled for August.
Digital Wallets & Mobile SDK
- Google Pay / Apple Pay integrations in progress; may not be in first release.
- Refund workflows across wallets still under investigation.
Agent Dashboard – Single Sign-On (SSO)
- Two use-cases:
- Back-office payment research & reconciliation (OCFO/Trellant).
- POS cashiers initiating payments (John’s DMV CSR team).
- Two technical options offered:
- Basic SSO.
- SAML SSO (already used on DOB project).
- Security roughly equivalent; SAML more feature-rich.
- Required artifacts
- Group names to be created.
- Object IDs & certificates.
- API calls for group provisioning.
- Meeting proposed for 03:30 tomorrow to walk through 200+ permission flags.
- DMV availability uncertain; may piggy-back on existing ETIMS call.
User Groups, Permissions & Access Matrix
- Over 200 granular permissions exist in Agent Dashboard.
- Hugo will circulate spreadsheet listing each permission; DMV to mark “X” for needed rights.
- Typical roles discussed:
- Treasury / OCFO (full research & reporting).
- CSR / Cashiers (execute payments only).
- Reconciliation / Support.
- Dummy group already created for initial testing.
ETIMS / Destiny / Current-State Workflows
- Present-day payment look-ups happen in ETIMS auto-payment screen via reference #.
- Additional escalations routed to OCFO (Beverly Keenan) for deep research.
- Goal: replicate same visibility in new dashboard while minimising duplicated effort.
IVR (Interactive Voice Response) Integration
- Convenience-fee rate confusion:
- Contract rate was 2.65%.
- IVR scripts drafted for 2.75%.
- Negotiated down to 2.50% based on increased volume.
- Audio prompts NOT yet professionally recorded; will update wording before recording.
- John to supply signed amendment/contract evidencing new 2.5% rate.
- Decline vs. error responses
- Typical card issues (CVV, expiry, NSF) will return DECLINED.
- System errors may still surface FAILED; expected to be rare post-UAT.
IP Whitelisting & SFTP
- Multiple SFTP IPs already in firewall; Benoit re-verifying list.
- Need separate whitelist entries for DMV & ETIMS (UAT only at this time).
Action Items & Owners
- Peter → Forward decline-test matrix to Benoit; memorialise 2.5% fee in meeting notes.
- Benoit → Resend callback URLs for test & prod RTPNS; resend any missing IP data.
- Hugo → Distribute permission spreadsheet to DMV, OCFO & ETIMS for completion.
- Sujay → Decide on SSO method (Basic vs. SAML) after consulting Dan; circulate decision.
- Peter → Send SSO technical docs & developer-portal links to Sujay.
- John (Berry) → Verify IVR script and contract amendment; coordinate professional recordings.
- Arvin → Provide updated demo date; likely early August.
- Dan/Marquita → Confirm signing status of new processing-fee contract.
Upcoming Meetings & Cancellations
- ETIMS technical call tomorrow; may extend to 30 minutes for SSO permissions walkthrough.
- Thursday Destiny call cancelled (Hugo OOO); resumes next week.
- Regular e-teams call tomorrow still on calendar.
- Metaphor used: Benoit “ready to put some boxing gloves on” if POS devices delayed; expect possible black eye on Zoom.
- Team encouraged to “swing for the cheap seats” when escalating.
- All participants thanked; follow-up calls scheduled as needed.