Build Build Build Infrastructure Program Summary
Program Overview and Objectives
Launch Date: April 18, 2017.
Core Agency: Department of Public Works and Highways (DPWH), initially headed by Secretary Mark Villar and later DPWH Undersecretary Emil K. Sadain as chief implementer in late 2021.
Context: Centerpiece of "Dutertenomics", incorporating 44 infrastructure projects inherited from previous administrations.
Primary Goals: Reduce poverty, spur economic growth, ease Metro Manila traffic congestion, and close the national infrastructure gap.
Funding and Budget Allocation
Total Spending Target: Approximately US$164.7 billion over a decade (₱8–9 trillion in the medium term).
GDP Share: Targeted infrastructure spending to rise from 5.4% of GDP in 2017 to as much as 7.3% by 2022 (compared to a 2.4% average over the prior five decades).
Geographic Focus: Connecting Luzon, Visayas, and Mindanao to spread development beyond Metro Manila into rural areas.
Evolution of Project Pipeline
2017: Launched with 75 priority projects.
November 2019: Expanded to 100 projects.
August 2020: Revised to 104 projects to integrate health, ICT, and water infrastructure for COVID-19 pandemic recovery.
Status in September 2020: 24 projects remained in approval/planning stages while 80 were under implementation.
Major Project Categories and Key Examples
Rail Transport: Metro Manila Subway Phase 1, MRT-7, North–South Commuter Railway, LRT-1 south extension, LRT-2 east extension, MRT-3 rehabilitation, Panay Railway, Subic–Clark Railway, and Mindanao Railway (never broke ground).
Roads, Bridges & Expressways: NLEX Connector, NLEX Harbor Link, Metro Manila Skyway Stage 3, Cavite–Laguna Expressway (CALAX), Central Luzon Link Expressway, Binondo–Intramuros Bridge, Estrella–Pantaleon Bridge, Panguil Bay Bridge, and Samal Island–Davao City Connector.
Airports: New Bohol–Panglao International Airport, Clark International Airport expansion, Bicol International Airport (New Legazpi), Mactan–Cebu International Airport expansion, and New Manila International Airport (Bulacan).
Flood Control, Water & Irrigation: Kaliwa Dam, Jalaur River Multipurpose Project, Chico River Pump Irrigation, and Angat Water Transmission.
Others: New Clark City, The Philippine Identification System (national ID), and digital/ICT infrastructure.
Outcomes vs. Completion Rate
July 2021 Official Figures: 214 airport projects, 451 port projects, 29,264 km of roads, 5,950 bridges, 11,340 flood-control projects, 11,340 evacuation centers, and 150,149 classrooms completed (includes repairs, widenings, and rehabilitations of pre-existing structures).
Infrastructure Flagship Projects (IFPs) Status: As of April 28, 2022, only 12 out of 119 official flagship projects had been completed. IBON Foundation noted only 11 of over 100 completed as of May 2021, with NEDA projecting a maximum of 40 completions by the end of Duterte's term.
Criticisms and Implementation Challenges
Delays & Deprioritization: Unforeseen delays caused by COVID-19 forced budget reallocations toward health response; some projects like Metro Manila Bus Rapid Transit were deprioritized.
Beneficiaries: Critics such as IBON Foundation asserted that liberalized rules disproportionately favored a narrow group of business entities ("Dutertegarchs") across construction, real estate, and transport sectors.
Government Defense: Officials emphasized that sustained infrastructure spending significantly outpaced historical performance regardless of the single flagship project completion rate.
Legacy and Transition
Transition: Rebranded as "Build Better More" (BBM) under the incoming Marcos administration in June 2022.
Continuity: The Marcos administration retained and continued major key infrastructure projects from the pipeline, including the Metro Manila Subway and MRT-7.