Interior
Chapter 22: Selecting Interior Finishes
Finishes Functional Parameters
Durability
Acoustical Performance
Fire Safety
Relationship to Mechanical & Electrical Services
Changeability
Fire Resistance
Aesthetics
Design Compliance / Enhancement
Interior Finishes
Purpose
- Conceal or accommodate building services. - Equipment and Distribution Systems include:
- Mechanical (HVAC)
- Plumbing (water, sewer, storm)
- Sprinkler Systems
- Electrical (power, communication, etc.)
- Vertical Transportation - Others: computer connections, vacuum systems, etc.
MPE System Installation
Shafts: Vertical runs of pipe, duct, wiring, elevators, etc.
- Purpose: concealment and prevention of fire migration.Suspended Ceilings: Horizontal runs of MPE services.
Floors: Services can be cast into the floor or use access flooring.
Plumbing Chases: Designed for water and sewer lines.
Mechanical Spaces: Include rooms, penthouses, roofs, basements, and mezzanines.
Visual Representation of MPE Rough-Ins
Horizontal Runs of Duct
- Includes electrical duct and plumbing duct as seen in high-rise and low-rise buildings.
- Overhead rough-in diagrams include cable trays, plumbing, sprinklers, and electrical systems.
Equipment and Space Considerations
Rooftop Equipment: HVAC equipment such as cooling towers can be mounted on the ground or roof.
Mechanical Equipment Room: Essential for housing various building services equipment.
Electrical Panels: Important for electrical distribution within the building.
Selecting Interior Finishes: Considerations
Appearance
- Must express a particular concept, reflecting the usage, feel, and form of the interior space.
- Factors include lighting, color, patterns, textures, etc.Durability & Maintenance:
- More durable finishes generally incur higher initial costs.
- Selection based on need and usage intensity:
- Examples:
- Hard flooring in an airport vs. carpet in an office.
- Drywall ceilings in hospitals vs. acoustic options in retail spaces.
- CMU (Concrete Masonry Unit) in public restrooms vs. drywall.
- VWC (Vinyl Composite Tile) in corridors vs. paint.Acoustic Criteria
- Interior finish materials affect sound quality and privacy within the building.
- Sound Transmission Class (STC):
- A measure of sound transmission through assemblies.
- Determined by full-scale tests or field tests, requiring proper construction, sealing of penetrations, and installation of doors.
- Ways to Reduce Sound Transmission:
- Material selection for floors, ceilings, and walls.
- Proper installation techniques.
- Use of sound-absorbing insulation and resilient partition mountings.
- Isolation of equipment.
Fire Safety Considerations
Fire Criteria:
- Governed by building codes, addressing:
- Combustibility:
- Flame spread speed
- Fuel Contributed Rating: combustibility of materials.
- Smoke Developed Rating: contribution to smoke, since smoke poses major risks in fires.
- Fire Resistance Ratings: Determined through full-scale tests, criteria include:
- Maintaining physical and structural integrity.
- Preventing passage of fire or hot gases.
- Insulation to keep cool on the non-exposed side.Openings: must be restricted in size and protected against fire/gas penetration. Options include:
- Rated doors. - Fire/smoke dampers in ducts. - Sealed piping sleeves.
- Examples: Fire damper with fusible link, pneumatically operated.
Changeability of Interior Finishes
Varies depending on the building type.
- Office/Retail:
- Frequent changes in services and finishes, requiring lighter, easily changed materials such as acoustic ceilings, drywall, moveable partitions, and carpet. - Government Building/Theater:
- Less frequent changes, necessitating heavier, more permanent materials like drywall ceilings, plaster, CMU, stone, and hard tiles.
Cost Considerations
Initial Cost:
- The installed cost is critical in budget constraints and for projects with shorter lifespans.Life-Cycle Cost:
- Total cost includes initial cost, maintenance, replacement, and energy costs.
- Important when the building’s useful life is long or when ownership is retained for extended periods.
Toxic Emissions from Materials
Concerns about solvents, finishes, airborne fibers, and susceptibility to mold/mildew.
Detection of radon gas and implications of sick buildings.
Trends in Interior Finish Systems
Move from single system constructions to modular components accommodating change.
Transition from Heavier to Lighter Materials:
- Example: Shift from plaster/CMU to drywall; hard tile to vinyl/carpet.Transition from Wet to Dry Systems:
- Example: Shift from plaster to gypsum drywall to acoustic systems.
Sequence of Interior Finishes Installation
Phases Include:
- Overhead rough-in (electrical, plumbing, duct).
- MPE vertical distribution systems installation.
- Partition framing with CMU or metal. - Rough-in for plumbing, electrical, communication systems. - Ceiling framing and rough-in for drywall, acoustic grids, lights, HVAC, etc.
- Installation of cabinetry and built-in equipment.
- Execution of ceiling finishes, wall finishes, and floor finishes.Sequence Dependence: Based on material types/systems and project conditions.
Primary Considerations for Sequence: - Need for subsequent operations like framing and rough-in.
- Priority for essential services like electric piping vs. sewer lines.
- Material durability, project schedule requirements, and availability.