Cost Savings Initiatives

Reserved Instances (RI)

  • Concept: Committing to a specific compute size (CPU and RAM) with cloud providers (e.g., AWS, Azure, GCP) for a period of 12 or 36 months to get discounted rates.
  • Pay-as-you-go model vs. Reserved Instances: The cloud typically uses a "pay as you go" model, where resources are billed by the minute. Reserved Instances offer a discount in exchange for a commitment.
  • Discount example: Approximately 24% discount for an upfront commitment.
  • Implementation: Commit to a certain number of servers (e.g., 1,000) across the entire estate for 12 months, managed centrally.
  • Savings Tracking: Savings calculated based on the difference between the list price (full price) and the new rate card (discounted price with commitment).
  • Monthly Savings: Approximately $75,000 per month.
  • Q1 Savings: $224,000.
  • Finance Team Role: Applies a cross-charge model to end-users, so owners of servers experience seamless cost optimization.
  • Dynamic Environment: Reservation management involves monthly re-baselining due to server changes (being spun up, decommissioned, or added).
  • Reservation Adjustments: May require exchanging reservations for new servers or adding new commitments due to server requests.
  • Fluctuations: Savings can fluctuate. For example, savings decreased in April due to the EUC team decommissioning an old Citrix environment.
  • Renewal: RIs are renewed on a yearly basis. The current term for RISE ends in July.
  • Future Strategy: Identify servers (especially in non-production environments) that can be turned off outside business hours (e.g., weekends) to double savings.
  • Power On/Off Schedule: Servers used only ~50 hours per week can be turned off during off-peak times, yielding additional savings.
  • Trajectory Planning: Incorporate anticipated cost savings into the trajectory, which includes actuals.
  • Tracking Location: Central track document maintained by Steve, updated with monthly cost savings. Validation done via scripts comparing list price vs. actual paid price.

Backup Storage Cost Optimization

  • Long-Term Retention Policy: Backups are retained for ten years.
  • Optimization Strategy: Moving backup jobs to archive storage, which costs 10 times less than hot storage.
  • Baseline: Last quarter of 2024 is used as a baseline (December 2024).
  • Lifecycle Policy: Backups are moved to archive storage after six months using a lifecycle policy.
  • Savings Traction: Cost reduction observed as the lifecycle policy is enabled.
  • January Savings: $8,000.
  • February Savings: Over $26,000.
  • March Savings: $28,000.
  • April Savings: Approximately $35,500.
  • Focus on Specific Cost Centers: Central Technology cost codes: UKQ7 & UK801.
  • Reporting: Report cost reduction specifically for UKQ7 and UK801 cost codes to Sean.
  • Reserved Instances and Cost Centers: An additional line item is needed to reflect savings from RIs specific to UK 207 and UK 801.

SD-WAN Cost Optimization

  • Definition: SD-WAN (Software-Defined Wide Area Network) is a corporate network connecting on-premises locations to the cloud.
  • Function: Provides connectivity from on-prem to cloud and fully matched connectivity between different corporate locations.
  • Private Network: Runs internally and is isolated from the internet.
  • Hub and Spoke Model: Utilizes a hub and spoke topology, with specific devices providing connectivity to cloud regions.
  • Global Presence: Corporate network present in multiple locations within Microsoft Azure, AWS, and GCP.
  • Redundancy: Additional capacity was built for quick failover scenarios, but it's expensive.
  • Decommissioning Strategy: Reduce the number of appliances where possible.
  • Cloud Direct Cost: Cost for hosting the VMs in the cloud.
  • Indirect Cost: Cost related to licensing.
  • Batch 1 (March): Decommissioned Meraki appliances resulting in $10,000 cloud cost savings per month and $12,000 licensing savings.
  • Batch 2 (April): Removed four appliances; cloud cost and licensing cost decreased.
  • Batch 3 (Planned for May/June): Complex change involving three appliances in EMEA (largest region), requiring careful planning.
  • Q1 Overall Savings: $429 as of April.
  • Challenge: Complex changes require careful planning, especially for busy appliances in larger regions like EMEA.