Engineering 2.0
Damage Control Petty Officer (DCPO) (imagine it as a collateral duty)
Maintains DC duties as primary responsibilities
Conducts all PMS on portable DC equipment in divisional spaces
Division Officer
Assigns personnel to DC organizations on the Watch, Quarter, and Station Bill
Ensures divisional personnel are assigned requisite DC PQS (Personnel Qualification Standard)
Recommends a DCPO to the Department Head
Ensures Compartment Check-Off Lists (CCOLs) are current, accurate, and posted
Conducts spot checks of DC PMS (Preventative Maintenance System)
Damage Control Assistant (DCA) Similar to CHENG but for DC
Submits all-hands DC training schedule to the Planning Board for Training (PB4T)
Informs the Damage Control Officer (DCO) of changes to DC equipment status
Oversees training and qualifications of repair lockers and Damage Control Central (DCC) personnel
Supervises training of all DCPOs
Department Head
Ensures optimum readiness within the department
Ensures cooperative DC training with the DCA
Provides required personnel for repair lockers and inport fire parties
Ensures that personnel are qualified and assigned as Damage Control Petty Officers (DCPOs)
Executive Officer
Keeps the CO advised as to the status of the ship’s readiness
Commands the Damage Control Training Team (DCTT)
DCTT is the shipboard training team responsible for training and self-assessing the crew’s response to damage control casualties
Gives final approval for DCPOs
Heads PB4T
Commanding Officer
Responsible for the safety of the ship and the lives of the crew
Ensures the command is adequately trained and continually exercised
Maintains a full awareness of the adequacy and operability
Engineer Officer (CHENG/DCO)
Responsible for the safe and proper operation of the engineering plant to the CO
Serves as the ship's Damage Control Officer (DCO)
Personally supervises the Engineering Officer of the Watch (EOOW) for special evolutions (MPA may supervise in absence of CHENG)
Ensures organization, training, and qualification of the Engineering Training Team (ETT) and DCTT are current and effective
Acts as final PQS qualifier for all Engineering qualifications (except EOOW; CO is final qualifier)
Responsible for the performance of all evolutions, inspections, and repair work in the Engineering Department
Engineer Officer of the Watch (EOOW)
CPO, PO, or Officer on watch in charge of the ship's entire engineering plant
Responsible for safe and proper operation of the plant and core watch duties:
Executes OOD's orders
Notifies appropriate personnel of casualties
Ensures training is conducted on the watch team
Ensures tag-out log is properly maintained
Rapid Response Team (RRT)
Proceeds directly to the scene of the casualty without full Fire Fighting Ensemble (FFE) or Self-Contained Breathing Apparatus (SCBA) to provide initial limited attack casualty response
RRT composition includes:
Fire Marshal
Repair Electrician
Two advanced DC-qualified personnel
Flying Squad / At Sea Fire Party
Backs up the Rapid Response Team
First team to man a Repair Locker in full dress out
Sound Powered Phone Circuits
4JZ: Forward Repair Circuit – DC Central to Repair 2
5JZ: After Repair Circuit – DC Central to Repair 3
7JZ: After Propulsion Engineer Repair Circuit – DC Central/Main Control to Repair
Steering
Emergency Equipment for Steering:
Electrical Pumps (Fill & Drain)
Intended for emergency steering operations to control hydraulic steering system directly
Hand Pumps
Physically control the flow of hydraulic fluid to the desired cylinder
Ratchet Wrenches
Can be used directly on the threaded cylinder ties
Aft Steering Manning:
During RMD, Special Evolutions, and Casualty: EM, EN, Helmsman, and Safety Officer
Ram Steering Assembly: metal attached to the rudders
HPUs move ram which moves the rudders powered by hydralic pressure
MRG Characteristics:
Dual input - Two points of power input from the turbines to the MRG
Double reduction/ Single Reduction (LSD/LPD) - highspeed/low torque to lowspeed/high torque
Double helical - Negates axial thrust
Locked train - Prevents “gear crawling”
Articulated - The gears and pinions are mounted on an outer shaft that “floats” and allows limited flexibility
Compressed Air:
Low-Pressure (LP) Air: 150 psig and below; Valve color: Tan
Medium Pressure (MP) Air: 151-1000 psig; Valve color: Tan
High Pressure (HP) Air: Above 1000 psig; Valve color: Dark Grey
HPAC is the backup for LP air
Vital Air Uses:
Air-condition plant controls
Air-operated (pneumatic) valves and controls
Air-operated hoists and bridge cranes
Sonar dome pressurization
Aviation support
Hazardous Atmpspheres:
Permissible Exposure Limit (PEL): The maximum permissible concentration of a toxic or harmful physical agent to which personnel may be exposed
Lower Explosive Limit (LEL): The minimum percent by volume of a gas that, when mixed with air, will form a flammable mixture
Upper Explosive Limit (UEL): Upper end of the explosive range. Concentrations above this limit are too rich to explode or burn. Concentrations below the UEL are within the explosive range.
Immediately Dangerous to Life and Health (IDLH): Any atmosphere that meets any of the following conditions:
- flammable vapors 10% or greater of the LEL;
- an oxygen content of less than 19.5% or greater than 22%;
- the presence of toxicants above a level that would not allow personnel
to escape within 30 minutes without impairment or irreversible health
effects
Oxygen surplus: oxygen level above 22%
Increased danger of explosion
Oxygen deficiency: oxygen level below 19.5%Portable DC Equipment

Thermal Imaging
Naval Firefighting Thermal Imager (NFTI / TIC)
Primary use: Locates the seat of a fire in smoke-filled compartments and detects hidden hotspots.
Pipe Patching Equipment
Soft Patch
System Pressure: Suitable for systems of 150 psi or less.
Installation: Gasket material must extend at least 2 inches beyond the damaged area.
Restrictions: Not recommended for use on fuel or steam lines.
Jubilee Patch
System Pressure: Suitable for systems of 100 psi or less.
Installation: Gasket material must overlap the damaged area by at least 2 inches on all sides.
Emergency Water-Activated Repair Patch (EWARP)
Operating Limits: Rated for systems up to 150 psi and maximum temperatures of 300°F.
Cure Time: Fully hardens within 30 minutes of water activation.
Available Sizes:
3 in × 9 ft
4 in × 15 ft
Restrictions: Prohibited on fuel and potable water systems due to the risk of chemical contamination.
Auxiliary Equipment & Ventilation
Resilient-Type Hanger
Used to prevent noise radiated from shipboard equipment from interfering with ship sonar and radiating into the water.
Electric Box Fan
Powered by 115V AC.
Moves 3,200 cubic feet of air per minute.
Ram Fan 2000
Water turbine driven by the firemain or P-100 pump.
Moves 2,000 cubic feet of air per minute.
Ship Stability
Center of Buoyancy (COB)
Located at the center of the underwater hull volume.
Follows the waterline (e.g., shifts starboard when the ship rolls starboard).
Moves upward as displacement increases from added weight, increasing underwater hull volume.
Center of Gravity (COG)
The point where the total weight of the ship is concentrated.
Moves toward a weight addition.
Moves away from a weight removal.
Free Surface Effect
Occurs when a compartment, tank, or void is partially filled or flooded.
Free Communication Effect
Occurs when three specific conditions are met:
Compartment must be open to the sea.
Compartment must be partially flooded.
Compartment must be located off centerline.
Engineering Doctrines
Maximum Reliability
Established to ensure the reliability of propulsion, electrical distribution, and steering systems.
Implemented during evolutions where equipment failure increases the risk of collision, grounding, or placing the ship in extremis.
Ensures equipment and distribution redundancy.
Restricted Maneuvering Doctrine (RMD)
Guidance from the Commanding Officer that places the safety of the ship and crew over the safety of equipment.
Based on the CO's comfort level with plant configuration and watchstander proficiency.
Drafted by the Engineer Officer (CHENG).
Promulgated in the CO's Standing Orders.
Authorizes deviations from Engineering Operational Casualty Control (EOCC) procedures.
Heat Illness Progression (in order of severity):
Dehydration
Heat Rash
Heat Cramps
Heat Exhaustion
Heat Stroke (Most Severe)
Treatment: Lower body temperature immediately, immerse in cool water, and seek hospital care.
Heat Exhaustion
Symptoms:
Pale skin
Rapid and weak pulse
Safety Procedures:
Remove individual from the hot space
Provide cool water
Obtain medical personnel
Heat Stroke (Medical Emergency)
Symptoms:
Hot, dry skin
High blood pressure
High body temperature
Safety Procedures:
Immediately immerse person in cool water
Provide water (if conscious)
Creating Fresh Water
Flash Type Distilling Plant - boils and reclaims water
Reverse Osmosis
Potable Water Testing
Medical
Prior to receipt (if from shore)
Daily from each potable water tank
Daily from various locations throughout the ship
Engineering
30 minutes after being treated in a potable water tank
Prior to putting a potable water tank into service
Upon bromine cartridge change out
Fuel and Oil testing:
Clear & Bright
BMSW
Saftey