Earthwork refers to the process of moving a portion of the earth's surface from one location to another, including transforming the earth's material into a new desired shape and physical condition.
It involves excavation, hauling, and placing earth materials.
Importance of Earthworks
Measurement of earth materials in the field.
Computation of the volume of such material.
Determination of the most economical method of performing such work.
Terminologies on the State of Earth Materials
Bank Measure: Volume of earth in its natural state.
Loose Measure: Volume of earth in the vehicle.
Compacted Measure: Volume of earth after compaction.
The state of the earth material is determined by its "swell and shrinkage" properties.
Classification of Materials
Common Excavation/Rock Excavation: Refers to soil; excavated material.
Common Borrow: Refers to the soil found outside the roadway and brought into the roadway if there's not enough material in the roadway excavation to provide for the embankment.
Waste: Materials excavated and thrown away, which are no longer necessary to form embankments.
Terminologies
Cut: Earthwork which is excavated, or is to be excavated.
Fill: Excavation which is placed in embankment, or is to be placed in embankment.
Earthworks Contracting
The contractor bids a lump sum for the work, handling the materials as he sees fit.
The contractor is paid per cubic yard for excavation (includes excavation, hauling, and placing of embankment).
Payment is normally either for cut and not for fill or for fill and not for cut. To pay for both would be paying for the same earth twice.
Highway work - for cut, Dam work - for fill.
Earthworks Contracting Considerations
The cost of hauling a unit volume of earth over a long distance can easily become greater than the cost of excavation, so it is often practical to pay a contractor for excavating and hauling earth.
Area and Volume Determination
Area Determination (Cross Sections)
Profiles of the earth are taken at right angles to the centerline of an engineering project (such as a highway, canal, dam, or railroad).
Taken to obtain volume measurement/estimate earthworks.
Usually taken at each full station and breaks in the ground along the centerline (Assumption: change in the earth's surface from one cross-section to the next is uniform).
Cross Section Types and Area Calculation
Level Section:
Area =c(b+sc)
Three-Level Section:
Area =2c(d<em>l+d</em>r)+4b(h<em>l+h</em>r)
Five-Level Section:
Area =2cb+f<em>ld</em>l+f<em>rd</em>r
Irregular Section:
Area is found by triangles, coordinates, or planimeter.