Panmure High Level Project Plan
PANMURE STATION HIGH LEVEL PROJECT PLAN (HLPP)1. INTRODUCTION
The Unlock Panmure plan aims to utilise Panmure's potential for urban regeneration.
Location: Positioned between Mount Wellington and Panmure Basin, close to major employment areas including Auckland’s CBD.
Objectives include revitalising the town centre, improving infrastructure, and enhancing local amenities to create a vibrant living and business environment.
Panuku Development Auckland leads the project with support from local government, community boards, and residents.
Key Data points
Population & Demographics: In 2025, the population was roughly 8,790 with a relatively young median age of 34.3 years.
Business Environment: Over 240 businesses are located in the immediate town centre area.
2. PURPOSE OF THIS PLAN2.1 Developing the Unlock Panmure Story
Collaboration with Maungakiekie-Tāmaki Local Board, Tāmaki Regeneration Company (TRC), and local community for shaping plans.
Over 280 community members participated in consultations to gather insights on local preferences.
Key community requests included:
More diverse retail options and a supermarket.
Better connections between existing facilities and public transport.
Enhancements to community spaces and local events.
3. VISION
Aim to create a vibrant centre focused on living, working, and visiting, capitalizing on Panmure's geographical and community strengths.
Strengths include high connectivity, rich natural surroundings, and a diverse, community-focused atmosphere. Key strengths lie in its strategic location between the Tāmaki River and Maungarei (Mt Wellington), its established public transport links, and active community-led development.
Natural Assets & Recreational Space: The suburb is bounded by the scenic Panmure Basin (a tidal estuary) and the Tāmaki River, providing extensive coastal walkways, parks, and playgrounds. The area is overlooked by the volcanic cone Maungarei (Mt Wellington), which offers panoramic views and green space.
Cultural Diversity and Food diversity of High Street: Queen’s Road is known for its diverse culinary scene, featuring a variety of ethnic eateries (Malaysian, Sri Lankan, Pasifika) alongside established local businesses.
Active Local Amenities: The area includes five local schools (including specialized education) and a community library. Plans are underway to build a new civic center and town square to foster a stronger community heart.
Gateway: The "Basin View" project plans to better connect Queens Road directly to the waterfront, enhancing the area’s walkability and creating a "gateway" to the suburb.
Constraints and weaknesses range from geographical and community challenges stemming from its industrial history, rapid redevelopment, and infrastructure bottlenecks. While experiencing revitalisation, the suburb currently grapples with issues related to transport congestion, social deprivation, and safety concerns
Infrastructure Issues: The area has historically struggled with major traffic congestion, particularly around the Panmure Bridge, the Ellerslie-Panmure Highway, and the former, problematic roundabout.
Delayed Public Transport Upgrades: The Eastern Busway project, designed to improve transport links, has faced delays, leaving residents and businesses struggling with continued traffic congestion and reduced connectivity
Vulnerability to Natural Hazards: Parts of Panmure are susceptible to environmental issues, including flood risks, coastal erosion, and potential damage from sea-level rises, which disproportionately affect lower-lying areas.
Fragmented Urban Form: The area is characterized by a "fragmented urban form," with a mix of residential, retail, and industrial zones that lack a cohesive, easily walkable, and "heart" or center.
Aging Infrastructure and Commercial Decline: The town centre has struggled, with some areas viewed as having a "dilapidated" feel and facing competition from nearby, more modern, commercial centers like Sylvia Park.
Lack of Social Services: There has been concern regarding the lack of youth services and social support in the area.
Parking Shortages: The introduction of new traffic management, such as broken yellow lines, has highlighted a shortage of on-street parking for residents and visitors.
Volcanic and Coastal Geography: The area is shaped by volcanic activity (Mt Wellington) and coastal influences, which, while providing scenic value, can restrict development, create challenging terrain, and increase vulnerability to coastal hazards and sea-level rise.
Environmental Constraints: Previous land use, including industrial activity and a former landfill on the edge of the lagoon, requires careful management of environmental factors, such as soil contamination and water quality.
Environmental Sensitivity: The area contains highly significant cultural, archaeological, and geologicalsites (including Mt Wellington) that must be protected, complicating any new road alignments or building projects.
4. CONTEXT4.1 Background and Location
Panmure was historically significant as a port town with rapid development over the years.
Currently, it's surrounded by residential and light industrial areas with essential community amenities.
4.2 Mana Whenua
Mana Whenua are integral to the project, focusing on cultural and historical connections to the land.
Engaging Mana Whenua ensures respect for traditions and cultural narratives during development.
4.3 Cultural Narrative
The Tāmaki River served as a vital transport route. Cultural narratives from the Mana Whenua enrich Panmure’s identity.
Stories affiliated with landmarks enhance the community’s connection to their heritage.
4.4 Project Area
The designated project area is 43 hectares, including economic, infrastructural, and cultural assets.
The area includes the town center on Queens Road and facilities like the Panmure Library and Lagoon Pool.
4.5 Planning
Plans indicate Panmure as a strategic town center under Auckland’s Unitary Plan, promoting growth with a focus on residential and mixed-use zones.
Height restrictions due to volcanic viewshafts range from 15 to 27 m in different areas.
4.6 The Panmure Community
Population of 4,226 expected to grow 93% by 2046.
Diverse ethnic composition with emerging residential and business demands.
4.7 Market Dynamics and Housing Demand
Growth trends signal increasing need for residential developments, evidenced by the Tāmaki regeneration area's target of 7,500 new homes.
Housing data includes:
Average tenure of residence: 45% for 1-4 years, 43% for 5+ years.
House median price: between $813,200-$920,000.
4.8 Transport and Connectivity
Panmure Station's ongoing upgrades and relationship to AMETI enhance public transport access, which is pivotal for urban renewal.
Expected rail boardings will increase from 3,700 daily to 12,000 post-development.
Key Developments
Enhanced walking and cycling infrastructure around Panmure.
5. PRINCIPLES AND GOALS5.1 Our Commitment
Goals based on Maungakiekie-Tāmaki Local Board objectives and Panuku’s urban development framework.
5.2 Development Principles
Leadership in urban regeneration.
Quality place-led design.
Housing provision supporting affordability and diversity.
5.3 Goals for Unlock Panmure
Goal 1: Restore town centre vitality.
Goal 2: Improve connections to and within the town centre.
Goal 3: Make a step change in housing development.
Goal 4: Demonstrate leadership in sustainable development initiatives.
6. STRATEGIC MOVES6.1 Develop a High-Quality Urban Neighbourhood
Change the local housing landscape through initiatives promoting sustainable, community-driven designs.
6.2 Reconnect the Centre to Its Community
Enhance connectivity between the town centre, community spaces, and public transport.
Key infrastructure improvements include walking and cycling paths.
6.3 Enliven the Heart of Queens Road
Strategies to restore vibrancy and attractiveness of the main street.
6.4 Foster Mainstreet Vitality and Business Growth
Collaborate with local businesses to stimulate economic development through active placemaking and resource allocation.
7. PROPOSED IMPLEMENTATION7.1 Development Strategy
Focus on mobilising existing properties and planned acquisitions to enhance Panmure’s development.
7.2 Funding
Outline of potential funding sources including local council budgets and development sale proceeds.
7.3 Commercial Value Creation
Regular assessment of property values regarding strategic developments to maximize community benefit.
7.4 Total Value Creation
Consideration of well-being dimensions (environmental, economic, social, cultural) in all developments.
7.5 Timeframes and Phasing
Estimated 15-year timeline for project realization.
7.6 Outcomes Monitoring
Performance indicators and monitoring frameworks established to evaluate the success of regeneration goals.
8. PLACE-LED COMMUNITY ENGAGEMENT AND COMMUNICATION8.1 Our Approach
Engagement strategy focusing on collaborative relationships with Mana Whenua and local stakeholders.
8.2 Community and Stakeholder Engagement
Establish ongoing communication with the community and significant stakeholders, including local businesses, groups, and government entities.
8.3 Placemaking
Utilise placemaking strategies to foster community-oriented developments and facilitate local involvement in planning processes.