Midterm Exam Review Guide: Frequency Distributions, Sums of Squares, Standard Deviation, Z-Scores, and T-Scores

Midterm Exam Logistics and Course Schedule

  • ** File Navigation and Submission Procedure **:

    • The midterm review sheet is accessible on Canvas under Modules -> Midterm Exam Review via the left-side link.
    • Students complete the assignment in Google Sheets and must export/download the completed review or exam as an Excel file (.xlsx format) prior to submitting it to Canvas.
  • ** Exam Structure **:

    • The exam directly mirrors the Google Sheets review file and contains three distinct tabs at the bottom of the workbook:
      • ** Tab 1 **: Frequency distributions (Frequency, Relative Frequency, Percentage, Cumulative Frequency).
      • ** Tab 2 **: Standard deviation and sums of squares (Definitional Formula, Raw Score Formula, and built-in spreadsheet functions).
      • ** Tab 3 **: Descriptive transformations (zz-scores and TT-scores).
  • ** Time Restrictions and Availability Window **:

    • The exam is available between 8:00 AM8:00\,\text{AM} and 11:59 PM11:59\,\text{PM}.
    • Once initiated, students are allotted 50 minutes50\,\text{minutes} to complete the exam.
    • ** Hard Cutoff Exception **: The exam closes strictly at 11:59 PM11:59\,\text{PM}. If a student begins the exam at 11:30 PM11:30\,\text{PM}, the system will enforce the final cutoff, leaving only 29 minutes29\,\text{minutes} of working time.
  • ** Permitted Resources and Academic Integrity **:

    • The exam is open-note and open-slides; PowerPoint lecture slides may be referenced.
    • Students must complete the work entirely independently.
    • Consulting external resources (such as Google or AI programs) or communicating with peers is strictly prohibited.
    • Utilizing AI programs to generate exam responses is formally classified as plagiarism under the university academic handbook.
  • ** Upcoming Schedule **:

    • ** Next Week **: No in-person lab session; students complete the midterm exam independently online.
    • ** Following Week **: No in-person lab session due to the Torrey Conference.
    • In-person lab meetings resume in three weeks.

Frequency Distributions and Spreadsheet Formulas

  • ** Frequency (ff) **:

    • Represents the total count of observations or participants receiving a specific score within a dataset (e.g., 66 participants receiving a specific test score).
  • ** Relative Frequency **:

    • ** Definition **: The proportion of times a specific event or score occurs relative to the total number of observations (nn).
    • ** Mathematical Formula **:         Relative Frequency=fn\text{Relative Frequency} = \frac{f}{n}
    • ** Spreadsheet Syntax **: Requires explicit cell selection divided by the dataset sum. The formula must reference specific cell identifiers (e.g., =C3/SUM(...)).
  • ** Percentage **:

    • ** Definition **: The relative frequency converted to a standard scale out of 100100.
    • ** Mathematical Formula **:         Percentage=Relative Frequency×100\text{Percentage} = \text{Relative Frequency} \times 100
    • ** Spreadsheet Syntax **: Involves multiplying the calculated relative frequency cell by 100100 using the asterisk operator (e.g., =C3*100).
  • ** Cumulative Frequency **:

    • ** Definition **: The running total of frequencies accumulated row-by-row across the distribution table.
    • ** First Entry **: The cumulative frequency of the initial row is equal to the individual frequency of that row (e.g., 66).
    • ** Subsequent Entries **: Equal to the sum of the previous row's cumulative frequency and the current row's individual frequency (e.g., 6+5=116 + 5 = 11).
    • ** Spreadsheet Implementation **: Can be calculated manually (=6+5) or via reference chaining (= [Previous Cumulative Frequency Cell] + [Current Frequency Cell]). Dragging the chained formula down the column expedites computation.
    • ** Verification Rule **: The final entry in the cumulative frequency column must equal the sum total (nn) of all observed frequencies.

Sums of Squares, Variance, and Standard Deviation

  • ** Definitional Formula Method **:

    • ** Mathematical Formula for Sum of Squares (SSSS) **:         SS=∑(x−xˉ)2SS = \sum (x - \bar{x})^2
    • ** Step 1: Calculate Mean (xˉ\bar{x}) **:
      • Spreadsheet syntax: =AVERAGE(range) (e.g., =AVERAGE(B6:B11)).
    • ** Step 2: Calculate Deviation Scores (x−xˉx - \bar{x}) **:
      • Subtract the mean from each raw score xx.
      • Spreadsheet syntax: =B6 - $B$12.
      • Absolute cell locking: Dollar signs ($) must lock the mean cell row and column so the reference remains static when dragged downward.
    • ** Step 3: Calculate Squared Deviation Scores ((x−xˉ)2(x - \bar{x})^2) **:
      • Square each deviation score.
      • Spreadsheet syntax: = cell^2 using the caret (^) exponent operator.
    • ** Step 4: Calculate Sum of Squares (SSSS) **:
      • Sum all squared deviation scores.
      • Spreadsheet syntax: =SUM(range) across the squared deviations column.
    • ** Step 5: Calculate Sample Variance (s2s^2) **:
      • Divide the calculated SSSS by the degrees of freedom (n−1n - 1).
      • For a sample size of n=6n = 6 subjects, the denominator is 6−1=56 - 1 = 5:             s2=SSn−1s^2 = \frac{SS}{n - 1}
      • Spreadsheet syntax: = SS_cell / 5.
    • ** Step 6: Calculate Sample Standard Deviation (ss) **:
      • Take the square root of the sample variance:             s=s2s = \sqrt{s^2}
      • Spreadsheet syntax: =SQRT(variance_cell).
  • ** Raw Score Formula Method **:

    • ** Mathematical Formula for Sum of Squares (SSSS) **:         SS=∑x2−(∑x)2nSS = \sum x^2 - \frac{(\sum x)^2}{n}
    • ** Step 1: Compute Squared Raw Scores (x2x^2) **:
      • Square each individual raw score xx.\n * Spreadsheet syntax: `= cell^2` and drag down.\n * ** Step 2: Compute Sum of Squared Raw Scores (∑x2\sum x^2) **:\n * Sum the squared raw score column.\n * Spreadsheet syntax: `=SUM(x^2_range)`.\n * ** Step 3: Compute Sum of Raw Scores (∑x\sum x) **:\n * Sum the original raw score column.\n * Spreadsheet syntax: `=SUM(x_range)`.\n * ** Step 4: Compute Square of Total Raw Sum ((\sum x)^2$) **:\n * Square the value obtained in Step 3.\n * Spreadsheet syntax: `= (sum_x_cell)^2`.\n * ** Step 5: Compute Correction Factor (\frac{(\sum x)^2}{n}) **:\n * Divide the squared raw sum by the total sample size n(for(forn = 6subjects,dividebysubjects, divide by6,NOT, NOTn - 1).\n * Spreadsheet syntax: `= (sum_x_squared_cell) / 6`.\n * ** Step 6: Subtract Correction Factor to Obtain SS **:\n * Subtract Step 5 result from Step 2 result (`\sum x^2`).\n * Spreadsheet syntax: `= sum_x2_cell - correction_factor_cell`.\n * *Check*: This value must identically match the SS calculated using the definitional formula.\n * ** Step 7: Calculate Sample Variance (s^2) **:\n * Divide SSbybyn - 1((5forforn = 6).\n * ** Step 8: Calculate Sample Standard Deviation (s) **:\n * Spreadsheet syntax: `=SQRT(variance_cell)`.\n\n* ** Built-In Spreadsheet Function Method **:\n * ** Function Syntax **: `=STDEV(range)`\n * Highlight raw score data cells directly inside the parentheses (e.g., `=STDEV(B42:B47)` or `=STDEV(B2:B31)`).\n * Press Enter to yield standard deviation directly; use this to cross-verify manual formula calculations.\n\n# Standardization: Z-Scores and T-Scores\n\n* ** Z-Score Transformation **:\n * ** Mathematical Formula **:\n        z = \frac{x - \bar{x}}{s}\n * ** Dataset Parameters (Review Example) **:\n * Mean score (\bar{x}):):59.4480\n * Standard deviation (s):):18.30\n * ** Spreadsheet Formula Syntax **:\n * `=(x_cell - $mean_cell) / $sd_cell`\n * ** Operational Requirements **:\n * Parentheses are mandatory around the numerator (x - \bar{x}) to enforce correct mathematical order of operations.\n * Dollar sign absolute reference locking (`$`) must be applied to the mean and standard deviation cell identifiers so the reference cells remain fixed when dragging the formula down standard test score columns.\n\n* ** T-Score Transformation **:\n * ** Mathematical Formula **:\n        T = 50 + 10 \times z\n * ** Spreadsheet Formula Syntax **:\n * `=50 + 10 * z_cell`\n * ** Operational Requirements **:\n * An explicit asterisk operator (`*`) is required for multiplication between the scale factor 10andthereferencedand the referencedz-score cell.\n\n# Questions and Discussion\n\n* ** Student Clarification on Raw Score Calculation **:\n * ** Prompt **: A student inquired about which specific cells were selected to derive the sum of squares (SS) in the raw score formula table.
    • ** Response **: It was demonstrated that cell C32 (representing \sum x^2$$) was selected, from which the adjusted value (\sum x)^2 / n was subtracted.
  • ** Student Clarification on Standard Deviation Function **:

    • ** Prompt **: A student requested a demonstration of the standard deviation function syntax due to screen size visibility issues.
    • ** Response **: Syntax was shown as =STDEV() in uppercase, highlighting the score range B2:B31 inside parentheses and pressing Enter to compute.
  • ** Exam Grading Criteria Clarification **:

    • ** Formula Evaluation **: Full credit on relative frequency and percentage sections requires formula syntax linking corresponding cells. Simple numerical entry without dynamic cell references will not satisfy formula submission checks.
    • ** Cumulative Frequency Flexibility **: Manual addition (=6+5) and dynamic formula references (= previous_cell + current_cell) are both accepted for full credit.