Exam Review

Variable and Fixed Costs

  • Active Layer:

    • Concept: Active layers refer to levels of output or production capacity where costs are assessed.

    • Note: Both total fixed cost and variable cost per unit remain constant, regardless of the active layer.

  • Total Fixed Cost:

    • Definition: Total fixed costs are costs that do not change with the level of production.

    • Example Value: Total fixed cost is stated as $8,400.

  • Calculation of Fixed Cost per Unit:

    • Formula: Fixed Cost per Unit=Total Fixed CostNumber of Units\text{Fixed Cost per Unit} = \frac{\text{Total Fixed Cost}}{\text{Number of Units}}

    • Calculation: 8,400600=14\frac{8,400}{600} = 14.

    • Result: Fixed cost per unit for MAPFRA replacement is $14.

  • Variable Cost per Unit:

    • Definition: Variable costs change with production levels but remain the same per unit.

    • Calculation:

    • Formula: Variable Cost per Unit=Total Variable CostNumber of Units\text{Variable Cost per Unit} = \frac{\text{Total Variable Cost}}{\text{Number of Units}}

    • Value: Total variable cost is $6,000.

    • Calculation: 6,000600=10\frac{6,000}{600} = 10.

    • Result: Variable cost per unit is $10.

  • Implication of Stability Across Activity Levels:

    • Note: Variable cost per unit remains the same across different production levels, such as 500 or 700, which will both equal $10.

  • Mixed Costs:

    • Definition: Mixed costs contain both fixed and variable components.

    • Use in Analysis: Understanding mixed costs is essential for constructing cost equations and forecasting expenses based on activity levels.

Analyzing Mixed Costs with the Heidel Method

  • Overview of the Heidel Method:

    • Purpose: To derive a mixed cost equation based on activity levels and associated costs (e.g., electric cost).

  • Steps of the Heidel Method:

    • Step 1: Identify high and low points of activity (x) and their respective costs (y).

    • Step 2: Calculate the slope (b) of the mixed cost.

    • Formula: b=High Point Y−Low Point YHigh Point X−Low Point Xb = \frac{\text{High Point Y} - \text{Low Point Y}}{\text{High Point X} - \text{Low Point X}}

    • Example Calculation: If high point costs are related to 4,120 units and low point costs are 1,620, the calculated average increase in cost per additional unit rented was found to be $2 per day.

  • Equations Using High and Low Points:

    • High Point Equation:

    • Formula: Y=b⋅X+FY = b \cdot X + F, where F is the fixed cost and Y and X are the respective costs and activity levels.

    • Result: E.g., 8,780=b⋅4,120+F8,780 = b \cdot 4,120 + F.

    • Low Point Equation:

    • Result: E.g., 1,620=540b+F1,620 = 540b + F.

  • Combining and Solving Equations:

    • Process: Subtract low point equation from high point equation to eliminate F and solve for b, and then use either equation to find F.

    • Result:

    • Slope (b) from the high and low compares yields: F=540F = 540 and b=2b = 2.

  • Mixed Cost Equation:

    • Final formula: Y=2X+540Y = 2X + 540

    • Application: Applicable for future activities, such as rental days.

Allocation of Manufacturing Overhead (MOH)

  • Predetermined MOH Rate:

    • Purpose: Allocate manufacturing overhead costs based on estimated activity levels.

    • Formula: Predetermined MOH Rate=Estimated Total MOHEstimated Allocation Base\text{Predetermined MOH Rate} = \frac{\text{Estimated Total MOH}}{\text{Estimated Allocation Base}}.

  • Estimating Total MOH:

    • Components: Includes both fixed and variable MOH.

    • Calculation Steps:

    • Fixed MOH: Given as $535,000.

    • Variable MOH: Calculated as total variable multiplied by estimated direct labor hours.

    • Example: 3×39,000=117,0003 \times 39,000 = 117,000 for total variable.

    • Total Estimated MOH = Fixed + Variable = $652,000.

  • MOH Rate Calculation:

    • Final Calculation: 652,00039,000=16.72\frac{652,000}{39,000} = 16.72 per direct labor hour.

    • Interpretation: For every direct labor hour, $16.72 of MOH applies.

  • Actual MOH Costs:

    • Example values are provided for calculating actual overhead compared against allocated amount.

    • Calculated allocated amount was $660,440 versus actual $721,584; thus, it signifies under-allocated costs.

  • Adjustments for Under-/Over-Allocation:

    • If over-allocated, costs would decrease; if under-allocated, the under-allocation amount is added to the Cost of Goods Sold (COGS).

    • Example: The under-allocated amount was recognized as $61,144.

Understanding Job Costing Systems

  • Job Costing Overview:

    • Common method used in manufacturing to apply costs based on jobs or batches.

    • Predetermined MOH rate is established before jobs commence.

  • Applying MOH Costs:

    • More intuitive understanding of allocations happens when monitoring actual machine hours versus predetermined estimates.

    • Example Case: Given a predetermined MOH rate of $5 per machine hour, allocates for actual machine usage of 44,000 hours yielding costs of $220,000.

  • Components of Actual MOH:

    • Components of actual costs must be assessed to conclude actual expenses accurately.

    • Total Actual MOH Calculation: Includes indirect production costs such as utilities, depreciation, and indirect labor.

    • Total was assessed as $249,000, higher than allocation indicating the need to review cost allocation practices.