Exam Review
Variable and Fixed Costs
Active Layer:
Concept: Active layers refer to levels of output or production capacity where costs are assessed.
Note: Both total fixed cost and variable cost per unit remain constant, regardless of the active layer.
Total Fixed Cost:
Definition: Total fixed costs are costs that do not change with the level of production.
Example Value: Total fixed cost is stated as $8,400.
Calculation of Fixed Cost per Unit:
Formula:
Calculation: .
Result: Fixed cost per unit for MAPFRA replacement is $14.
Variable Cost per Unit:
Definition: Variable costs change with production levels but remain the same per unit.
Calculation:
Formula:
Value: Total variable cost is $6,000.
Calculation: .
Result: Variable cost per unit is $10.
Implication of Stability Across Activity Levels:
Note: Variable cost per unit remains the same across different production levels, such as 500 or 700, which will both equal $10.
Mixed Costs:
Definition: Mixed costs contain both fixed and variable components.
Use in Analysis: Understanding mixed costs is essential for constructing cost equations and forecasting expenses based on activity levels.
Analyzing Mixed Costs with the Heidel Method
Overview of the Heidel Method:
Purpose: To derive a mixed cost equation based on activity levels and associated costs (e.g., electric cost).
Steps of the Heidel Method:
Step 1: Identify high and low points of activity (x) and their respective costs (y).
Step 2: Calculate the slope (b) of the mixed cost.
Formula:
Example Calculation: If high point costs are related to 4,120 units and low point costs are 1,620, the calculated average increase in cost per additional unit rented was found to be $2 per day.
Equations Using High and Low Points:
High Point Equation:
Formula: , where F is the fixed cost and Y and X are the respective costs and activity levels.
Result: E.g., .
Low Point Equation:
Result: E.g., .
Combining and Solving Equations:
Process: Subtract low point equation from high point equation to eliminate F and solve for b, and then use either equation to find F.
Result:
Slope (b) from the high and low compares yields: and .
Mixed Cost Equation:
Final formula:
Application: Applicable for future activities, such as rental days.
Allocation of Manufacturing Overhead (MOH)
Predetermined MOH Rate:
Purpose: Allocate manufacturing overhead costs based on estimated activity levels.
Formula: .
Estimating Total MOH:
Components: Includes both fixed and variable MOH.
Calculation Steps:
Fixed MOH: Given as $535,000.
Variable MOH: Calculated as total variable multiplied by estimated direct labor hours.
Example: for total variable.
Total Estimated MOH = Fixed + Variable = $652,000.
MOH Rate Calculation:
Final Calculation: per direct labor hour.
Interpretation: For every direct labor hour, $16.72 of MOH applies.
Actual MOH Costs:
Example values are provided for calculating actual overhead compared against allocated amount.
Calculated allocated amount was $660,440 versus actual $721,584; thus, it signifies under-allocated costs.
Adjustments for Under-/Over-Allocation:
If over-allocated, costs would decrease; if under-allocated, the under-allocation amount is added to the Cost of Goods Sold (COGS).
Example: The under-allocated amount was recognized as $61,144.
Understanding Job Costing Systems
Job Costing Overview:
Common method used in manufacturing to apply costs based on jobs or batches.
Predetermined MOH rate is established before jobs commence.
Applying MOH Costs:
More intuitive understanding of allocations happens when monitoring actual machine hours versus predetermined estimates.
Example Case: Given a predetermined MOH rate of $5 per machine hour, allocates for actual machine usage of 44,000 hours yielding costs of $220,000.
Components of Actual MOH:
Components of actual costs must be assessed to conclude actual expenses accurately.
Total Actual MOH Calculation: Includes indirect production costs such as utilities, depreciation, and indirect labor.
Total was assessed as $249,000, higher than allocation indicating the need to review cost allocation practices.