Project Scope Management | | |
Scope | | |
Steps of Scope Management | | |
Project Scope | defined as work that needs to be accomplished to deliver a product, service or result with the specific features and functions measured against project management plan, scope statement and associated WBS and WBS dictionary
| |
Product Scope | defined as features and functions that characterize a product, service or result measured against product requirem
| |
Plan Scope Management | process of creating a scope management plan that documents how the project scope will be defined, validated and controlled Includes processes on how plans, WBS, changes and deliverables are
| |
Collecting Scope Requirements | Process of determining, documenting and managing stakeholders needs to meet the project objectives provides the basis and managing the project scope Requirements include conditions or capabilities that are to be met by the project to satisfy an agreement or other formally imposed specification. Requirements need to be elicited, analyzed, and recorded in enough detail to be included in the scope baseline and to be measured once project execution begins.
| |
Requirements and WBS Relationship | | |
Information Sources of Requirement Development | | |
Requirements Document | | |
Characteristics of Requirements | | |
Requirements Traceability Matrix | | |
Define Scope | | |
Project Scope Statement | | |
Work Breakdown Structure | A deliverable-oriented hierarchical decomposition of the work to be executed by the project team, to accomplish the project objectives and create the required deliverables. Lowest level are work pacakges
| |
Decomposition | subdivision of project deliverables into smaller, more manageable components until the work and deliverables are defined to the work package level. easier to manage at detailed levels but also ineffieicnt and micromanagin
| |
WBS Dictionary | Description of detailed content of components contained in WBS, including work packages and control accounts. For each WBS component, a code of account identifier, description of work, responsible organization, and list of schedule milestones are included. Other supplementary information may also be included (e.g., quality requirements, technical references).
| |
Outputs of Work Breakdown Structure | Project Scope Statement WBS WBS Dictionary
| |
Scope Verification | Validating Scope includes reviewing deliverables with customer or sponsor to ensure they are completed satisfactorily and obtaining formal acceptance of deliverables by customer or sponsor Output is Accepted Deliverables
| |
Control Scope Inputs | Project Management Plan Requirements Documentation Requirements Traceability Matrix Work Performance Data Organizational Process Assets
| |
Variance Analysis | | |
Outputs of Scope Control | Work Performance Measurements Change Request Project Management Plan Updates Project Document Updates Organizational Process Assets
| |