CLC Lecture 6
Lewin's Planned Change Model (Page 17)
Ensures that employees are ready for change
Executes intended change
Ensures that the change becomes permanent
Unfreeze stage (Page 18)
People experience emotions such as denial, impatience, uncertainty, and doubt
Managers must communicate the need for change and why it is being implemented
Clear communication helps employees accept the new change and let go of old customs
Involving employees in this stage promotes a positive approach to the change process
Change stage (Page 19)
Change should be implemented within a short time
Longer change processes increase the likelihood of employees reverting to old habits
Implementing change quickly helps employees understand its importance sooner
Freeze stage (Page 20)
Solidify the change
Employees tend to revert to old habits after the change is implemented
Interim evaluations, monitoring, and adjustments are necessary to stabilize the new situation
Employees need to understand that there is no turning back and act in accordance with the new situation
Kotter's 8-Step Change Model (Page 22)
Establishing a sense of urgency
Creating the guiding coalition
Developing a vision and strategy
Communicating the change vision
Empowering broad-based action
Generating short-term wins
Consolidating gains and producing more change
Anchoring new approaches in the culture
Emphasizes the importance of communicating the need for change and the vision of what the change will accomplish
Highlights the role of the leader in creating a feeling of urgency and necessity for change
Comparison of Lewin's and Kotter's Change Models (Page 23)
Lewin's Planned Change Model
Kotter's 8-Step Change Model
The Action Research Model (Page 25)
Focuses on planned change as a cyclical and iterative process of collaboration between "co-learners"
Involves organization members in the change process
Also referred to as "participatory action research," "action learning," "action science," or "self-design"
The Positive Model (Page 27)
Focuses on the organization's strengths and capabilities
Members understand the organization's best practices and build on them to achieve higher performance
Applied through appreciative inquiry, a positive way of looking at challenges
Comparison of Planned Change Models (Page 28)
Similarities:
Change preceded by diagnosis or preparation
Apply behavioral science knowledge
Stress involvement of organization members
Recognize the role of a consultant
Differences:
General vs. specific activities
Centrality of consultant role
Problem-solving vs. social constructionism
General Model of Planned Change (Page 29)
A general framework for planned change suggested by the four previous models
Different Types of Planned Change (Page 31)
Magnitude of Change:
Incremental (limited scope) vs. Fundamental/Quantum (more complex, extensive, long-term)
Degree of Organization:
Overorganized (mechanistic, bureaucratic, rigid) vs. Underorganized (needs a different model for planned change with a clearly defined role from the consultant side)
Domestic vs. International Settings:
Includes culture, equality, inclusion, time horizons
Critique of Planned Change (Page 32)
Conceptualization:
Change is not linear
Change is not rational nor a controlled process
The relationship between change and performance is unclear
Uncertainty about when the change process will be over
Practice:
Lack of comprehensive information, especially in the diagnosis process
Limited consulting skills and focus
Tendency towards quick fixes rather than development approaches
Partial (non-holistic) approaches
Abstract