Comprehensive Study Notes: Solar-Powered School Greenhouse Project (MYP 3 Mathematics Criterion A)

Assessment Overview & Administrative Specifications

  • Curriculum Framework and Year Level:

    • Program: Middle Years Programme (MYP 3, Grade 8).
    • Academic Year: 2026–2027.
    • Task Type: In-Class Assessment Task.
    • Project Theme: The Solar-Powered School Greenhouse Project.
  • Assessment Criteria & Grading Parameters:

    • Core Assessment Objective: Criterion A (Knowing and Understanding).
    • Maximum Criterion Achievement Level: Level 88.
    • Total Raw Marks Available: 5050 raw marks (distributed across 8 dedicated questions; summary table scales total raw marks to standard criterion bands out of 4040 / Level 88).
    • Assessed Mathematical Branches: Spatial Reasoning (Geometry & Measurement) and Reasoning with Data (Statistics & Probability).
  • Examination Protocols & Execution Guidelines:

    • Time Allowed: 50 minutes50\,\text{minutes}.
    • Permitted Auxiliary Equipment: Standard Scientific Calculator, Metric Ruler.
    • General Instructions:
      • All responses must be fully transcribed with complete mathematical steps and working shown.
      • Standard scientific units must be explicitly stated in every final numerical value.
      • All non-exact numerical solutions must be rounded to exactly 3 significant figures3\,\text{significant figures} unless otherwise specified in the prompt.

Geometric Analysis of Composite Greenhouse Floor Layout (Question 1)

Greenhouse Floor Plan Layout

  • Architectural Floor Composition:

    • The total greenhouse ground plot consists of two contiguous sections: a primary rectangular planting area denoted by vertices ABCDABCD and an adjacent right-angled triangular seedling sector denoted by vertices ADEADE.
    • Geometric dimensions established on the site plan:
      • Top horizontal edge: AB=14 mAB = 14\,\text{m}.
      • Right vertical wall: BC=9 mBC = 9\,\text{m}.
      • Bottom horizontal edge of rectangular section: DC=14 mDC = 14\,\text{m}.
      • Horizontal extension of triangular sector: ED=12 mED = 12\,\text{m}.
      • Internal shared boundary (dashed altitude line): AD=BC=9 mAD = BC = 9\,\text{m}, forming right angles with both ABAB and the baseline ECEC.
      • The entire baseline spans EC=ED+DC=12 m+14 m=26 mEC = ED + DC = 12\,\text{m} + 14\,\text{m} = 26\,\text{m}.
  • Derivation of the Slanted Boundary Line (AEAE):

    • The seedling sector ADEADE forms a right-angled triangle where AD⊥EDAD \perp ED.
    • Applicable Theorem: Pythagorean Theorem:
      • AE2=AD2+ED2AE^2 = AD^2 + ED^2
    • Numerical substitution:
      • AE2=(9 m)2+(12 m)2AE^2 = (9\,\text{m})^2 + (12\,\text{m})^2
      • AE2=81 m2+144 m2=225 m2AE^2 = 81\,\text{m}^2 + 144\,\text{m}^2 = 225\,\text{m}^2
    • Exact length evaluation:
      • AE=225 m2=15 mAE = \sqrt{225\,\text{m}^2} = 15\,\text{m}
    • The boundary segment AEAE measures exactly 15 m15\,\text{m}, forming a classical 3:4:53:4:5 scaled Pythagorean triple (3×3=93 \times 3 = 9, 4×3=124 \times 3 = 12, 5×3=155 \times 3 = 15).
  • Total Outer Perimeter of Composite Boundary (ABCDEABCDE):

    • Perimeter definition: Summation of all exterior boundary segments enclosing the composite polygon (AB+BC+CD+DE+EAAB + BC + CD + DE + EA):
      • Perimeter=AB+BC+CD+DE+AE\text{Perimeter} = AB + BC + CD + DE + AE
      • Perimeter=14 m+9 m+14 m+12 m+15 m\text{Perimeter} = 14\,\text{m} + 9\,\text{m} + 14\,\text{m} + 12\,\text{m} + 15\,\text{m}
      • Perimeter=64 m\text{Perimeter} = 64\,\text{m}
    • Note on internal boundaries: The interior divider line ADAD (9 m9\,\text{m}) is strictly internal and excluded from outer perimeter accounting.
  • Total Usable Floor Area of the Composite Plot:

    • Method 1: Component Summation:
      • Area of rectangular planting section (ABCDABCD):
        • AreaABCD=length×width=14 m×9 m=126 m2\text{Area}_{ABCD} = \text{length} \times \text{width} = 14\,\text{m} \times 9\,\text{m} = 126\,\text{m}^2
      • Area of triangular seedling section (△ADE\triangle ADE):
        • AreaADE=12×base×height=12×12 m×9 m=54 m2\text{Area}_{ADE} = \frac{1}{2} \times \text{base} \times \text{height} = \frac{1}{2} \times 12\,\text{m} \times 9\,\text{m} = 54\,\text{m}^2
      • Composite Area:
        • Areatotal=AreaABCD+AreaADE=126 m2+54 m2=180 m2\text{Area}_{\text{total}} = \text{Area}_{ABCD} + \text{Area}_{ADE} = 126\,\text{m}^2 + 54\,\text{m}^2 = 180\,\text{m}^2
    • Method 2: Right Trapezoid Formula:
      • Parallel bases: top edge a=AB=14 ma = AB = 14\,\text{m}, full bottom edge b=EC=26 mb = EC = 26\,\text{m}.
      • Perpendicular height: h=AD=BC=9 mh = AD = BC = 9\,\text{m}.
      • Area=a+b2×h=14 m+26 m2×9 m=40 m2×9 m=20 m×9 m=180 m2\text{Area} = \frac{a + b}{2} \times h = \frac{14\,\text{m} + 26\,\text{m}}{2} \times 9\,\text{m} = \frac{40\,\text{m}}{2} \times 9\,\text{m} = 20\,\text{m} \times 9\,\text{m} = 180\,\text{m}^2

Solar Radiation Data Analysis & Statistical Measures (Question 2)

  • Empirical Observation Dataset:

    • Context: Average daily solar insolation measured in units of kWh/m2/day\text{kWh/m}^2/\text{day} recorded across each calendar month over a one-year cycle.
    • Tabulated monthly solar radiation:
      • January (Jan): 6.2 kWh/m26.2\,\text{kWh/m}^2
      • February (Feb): 5.8 kWh/m25.8\,\text{kWh/m}^2
      • March (Mar): 5.0 kWh/m25.0\,\text{kWh/m}^2
      • April (Apr): 3.6 kWh/m23.6\,\text{kWh/m}^2
      • May (May): 2.4 kWh/m22.4\,\text{kWh/m}^2
      • June (Jun): 1.8 kWh/m21.8\,\text{kWh/m}^2
      • July (Jul): 2.0 kWh/m22.0\,\text{kWh/m}^2
      • August (Aug): 3.2 kWh/m23.2\,\text{kWh/m}^2
      • September (Sep): 4.2 kWh/m24.2\,\text{kWh/m}^2
      • October (Oct): 5.4 kWh/m25.4\,\text{kWh/m}^2
      • November (Nov): 6.0 kWh/m26.0\,\text{kWh/m}^2
      • December (Dec): 6.4 kWh/m26.4\,\text{kWh/m}^2
  • Calculation of the Mean Daily Solar Radiation:

    • Mathematical formula for the arithmetic mean (xˉ\bar{x}):
      • xˉ=∑xn\bar{x} = \frac{\sum x}{n}
    • Summation of all n=12n = 12 monthly observations:
      • ∑x=6.2+5.8+5.0+3.6+2.4+1.8+2.0+3.2+4.2+5.4+6.0+6.4=52.0 kWh/m2\sum x = 6.2 + 5.8 + 5.0 + 3.6 + 2.4 + 1.8 + 2.0 + 3.2 + 4.2 + 5.4 + 6.0 + 6.4 = 52.0\,\text{kWh/m}^2
    • Mean computation:
      • xˉ=52.012=133=4.3333... kWh/m2\bar{x} = \frac{52.0}{12} = \frac{13}{3} = 4.3333...\,\text{kWh/m}^2
    • Rounding to 3 significant figures: xˉ=4.33 kWh/m2/day\bar{x} = 4.33\,\text{kWh/m}^2/\text{day}.
  • Determination of the Median Daily Solar Radiation:

    • Ascending ordered distribution of the 1212 data values:
      • 1.8, 2.0, 2.4, 3.2, 3.6, 4.2, 5.0, 5.4, 5.8, 6.0, 6.2, 6.41.8, \, 2.0, \, 2.4, \, 3.2, \, 3.6, \, 4.2, \, 5.0, \, 5.4, \, 5.8, \, 6.0, \, 6.2, \, 6.4
    • Position of the median for an even sample size (n=12n = 12):
      • Position=n+12=132=6.5th position\text{Position} = \frac{n + 1}{2} = \frac{13}{2} = 6.5^{\text{th}}\,\text{position}
    • Average of the 6th6^{\text{th}} value (4.24.2) and the 7th7^{\text{th}} value (5.05.0):
      • Median=4.2+5.02=9.22=4.60 kWh/m2/day\text{Median} = \frac{4.2 + 5.0}{2} = \frac{9.2}{2} = 4.60\,\text{kWh/m}^2/\text{day}
  • Measures of Spread: Range and Interquartile Range (IQR):

    • Calculation of Range:
      • Range=Maximum Value−Minimum Value\text{Range} = \text{Maximum Value} - \text{Minimum Value}
      • Range=6.4−1.8=4.60 kWh/m2/day\text{Range} = 6.4 - 1.8 = 4.60\,\text{kWh/m}^2/\text{day}
    • Calculation of Lower Quartile (Q1Q_1) and Upper Quartile (Q3Q_3):
      • Lower half of distribution (66 lowest values): 1.8, 2.0, 2.4, 3.2, 3.6, 4.21.8, \, 2.0, \, 2.4, \, 3.2, \, 3.6, \, 4.2
      • Q1Q_1 is the median of this subset (average of 3rd3^{\text{rd}} and 4th4^{\text{th}} terms):
        • Q1=2.4+3.22=2.80 kWh/m2/dayQ_1 = \frac{2.4 + 3.2}{2} = 2.80\,\text{kWh/m}^2/\text{day}
      • Upper half of distribution (66 highest values): 5.0, 5.4, 5.8, 6.0, 6.2, 6.45.0, \, 5.4, \, 5.8, \, 6.0, \, 6.2, \, 6.4
      • Q3Q_3 is the median of this subset (average of 9th9^{\text{th}} and 10th10^{\text{th}} terms):
        • Q3=5.8+6.02=5.90 kWh/m2/dayQ_3 = \frac{5.8 + 6.0}{2} = 5.90\,\text{kWh/m}^2/\text{day}
    • Interquartile Range (IQRIQR):
      • IQR=Q3−Q1=5.90−2.80=3.10 kWh/m2/dayIQR = Q_3 - Q_1 = 5.90 - 2.80 = 3.10\,\text{kWh/m}^2/\text{day}
  • Graphical Representation Protocols:

    • When charting solar insolation on a grid:
      • Horizontal axis (xx-axis): Independent categorical variable representing consecutive months (Jan through Dec).
      • Vertical axis (yy-axis): Dependent continuous variable representing Solar Radiation in kWh/m2/day\text{kWh/m}^2/\text{day}, scaled uniformly from 0.00.0 to at least 7.07.0.
      • Graph conventions: Clear title, fully labeled axes with explicit units, accurate bar heights or connected plot points, and correct uniform grid increments.

Cylindrical Water Thermal Tank Capacity & Geometry (Question 3)

Cylindrical Water Thermal Tank Dimensions

  • Physical Specifications of the Thermal Storage Unit:

    • Geometric profile: Closed vertical circular cylinder.
    • Internal diameter: d=2.4 md = 2.4\,\text{m}.
    • Internal base radius: r=d2=2.4 m2=1.2 mr = \frac{d}{2} = \frac{2.4\,\text{m}}{2} = 1.2\,\text{m}.
    • Vertical height: h=1.8 mh = 1.8\,\text{m}.
  • Exact Internal Volume (m3\text{m}^3):

    • Volume formula for a right circular cylinder:
      • V=πr2hV = \pi r^2 h
    • Substitution of dimensions:
      • V=π×(1.2 m)2×1.8 mV = \pi \times (1.2\,\text{m})^2 \times 1.8\,\text{m}
      • V=π×1.44 m2×1.8 mV = \pi \times 1.44\,\text{m}^2 \times 1.8\,\text{m}
      • V=2.592π m3V = 2.592\pi\,\text{m}^3
    • Exact volume expressed in terms of π\pi: 2.592π m32.592\pi\,\text{m}^3 (or 324125π m3\frac{324}{125}\pi\,\text{m}^3).
  • Volumetric Storage Capacity in Litres (L\text{L}):

    • Standard SI volumetric metric conversion equivalence: 1 m3=1000 litres1\,\text{m}^3 = 1000\,\text{litres}.
    • Calculation using unrounded exact volume:
      • Vlitres=2.592π×1000=2592π litresV_{\text{litres}} = 2.592\pi \times 1000 = 2592\pi\,\text{litres}
      • Vlitres≈2592×3.14159265...≈8143.008 litresV_{\text{litres}} \approx 2592 \times 3.14159265... \approx 8143.008\,\text{litres}
    • Rounding to 3 significant figures:
      • V=8140 litresV = 8140\,\text{litres}
  • Exterior Total Surface Area (AA) for Insulating Paint Coverage:

    • A completely enclosed cylinder includes two circular planar faces (top and bottom) and one unrolled curved lateral rectangular face.
    • Formula for total surface area (AtotalA_{\text{total}}):
      • Atotal=2πr2+2πrhA_{\text{total}} = 2\pi r^2 + 2\pi r h
    • Substitution of parameters:
      • Abases=2π×(1.2 m)2=2π×1.44 m2=2.88π m2A_{\text{bases}} = 2\pi \times (1.2\,\text{m})^2 = 2\pi \times 1.44\,\text{m}^2 = 2.88\pi\,\text{m}^2
      • Alateral=2π×1.2 m×1.8 m=4.32π m2A_{\text{lateral}} = 2\pi \times 1.2\,\text{m} \times 1.8\,\text{m} = 4.32\pi\,\text{m}^2
      • Atotal=2.88π m2+4.32π m2=7.20π m2A_{\text{total}} = 2.88\pi\,\text{m}^2 + 4.32\pi\,\text{m}^2 = 7.20\pi\,\text{m}^2
    • Evaluation to 3 significant figures:
      • Atotal≈7.20×3.14159265...≈22.619 m2A_{\text{total}} \approx 7.20 \times 3.14159265... \approx 22.619\,\text{m}^2
      • Atotal=22.6 m2A_{\text{total}} = 22.6\,\text{m}^2

Internal Planting Bed Optimization & Spatial Constraints (Question 4)

  • Spatial Parameters and Boundary Restrictions:

    • Plot boundary: Primary rectangular section ABCDABCD with dimensions 14.0 m14.0\,\text{m} (length along AB,DCAB, DC) by 9.0 m9.0\,\text{m} (width along BC,ADBC, AD).
    • Planter bed footprint: Identical modular rectangular units measuring 2.0 m×1.5 m2.0\,\text{m} \times 1.5\,\text{m}.
    • Mandatory circulation restriction: Walkway gap of at least 0.5 m0.5\,\text{m} must be preserved around all outer walls and between adjacent planter boxes.
  • Mathematical Modeling of 2D Grid Packing:

    • Orientation A (Box length 2.0 m2.0\,\text{m} aligned parallel to the 14.0 m14.0\,\text{m} wall):
      • Along the 14.0 m14.0\,\text{m} dimension:
        • Let nxn_x be the number of boxes along the length.
        • Total length consumed by nxn_x boxes and (nx+1)(n_x + 1) boundary/aisle paths of width 0.5 m0.5\,\text{m}:
          • nx(2.0)+(nx+1)(0.5)≤14.0n_x(2.0) + (n_x + 1)(0.5) \le 14.0
          • 2.0nx+0.5nx+0.5≤14.02.0 n_x + 0.5 n_x + 0.5 \le 14.0
          • 2.5nx≤13.52.5 n_x \le 13.5
          • nx≤13.52.5=5.4n_x \le \frac{13.5}{2.5} = 5.4
        • Since nxn_x must be a non-negative integer, maximum nx=5n_x = 5.
        • Verification: 5×2.0 m+6×0.5 m=10.0 m+3.0 m=13.0 m≤14.0 m5 \times 2.0\,\text{m} + 6 \times 0.5\,\text{m} = 10.0\,\text{m} + 3.0\,\text{m} = 13.0\,\text{m} \le 14.0\,\text{m} (feasible with 1.0 m1.0\,\text{m} excess clearance).
      • Along the 9.0 m9.0\,\text{m} dimension:
        • Let nyn_y be the number of boxes along the width.
        • Total width consumed by nyn_y boxes of width 1.5 m1.5\,\text{m} and (ny+1)(n_y + 1) boundary/aisle paths of width 0.5 m0.5\,\text{m}:
          • ny(1.5)+(ny+1)(0.5)≤9.0n_y(1.5) + (n_y + 1)(0.5) \le 9.0
          • 1.5ny+0.5ny+0.5≤9.01.5 n_y + 0.5 n_y + 0.5 \le 9.0
          • 2.0ny≤8.52.0 n_y \le 8.5
          • ny≤8.52.0=4.25n_y \le \frac{8.5}{2.0} = 4.25
        • Since nyn_y must be an integer, maximum ny=4n_y = 4.
        • Verification: 4×1.5 m+5×0.5 m=6.0 m+2.5 m=8.5 m≤9.0 m4 \times 1.5\,\text{m} + 5 \times 0.5\,\text{m} = 6.0\,\text{m} + 2.5\,\text{m} = 8.5\,\text{m} \le 9.0\,\text{m} (feasible with 0.5 m0.5\,\text{m} excess clearance).
      • Total capacity for Orientation A:
        • NA=nx×ny=5×4=20 planter boxesN_A = n_x \times n_y = 5 \times 4 = 20\,\text{planter boxes}
    • Orientation B (Box length 2.0 m2.0\,\text{m} aligned parallel to the 9.0 m9.0\,\text{m} wall):
      • Along the 14.0 m14.0\,\text{m} dimension (1.5 m1.5\,\text{m} box edge):
        • 2.0nx+0.5≤14.0  ⟹  2.0nx≤13.5  ⟹  nx≤6.75  ⟹  nx=62.0 n_x + 0.5 \le 14.0 \implies 2.0 n_x \le 13.5 \implies n_x \le 6.75 \implies n_x = 6.
      • Along the 9.0 m9.0\,\text{m} dimension (2.0 m2.0\,\text{m} box edge):
        • 2.5ny+0.5≤9.0  ⟹  2.5ny≤8.5  ⟹  ny≤3.4  ⟹  ny=32.5 n_y + 0.5 \le 9.0 \implies 2.5 n_y \le 8.5 \implies n_y \le 3.4 \implies n_y = 3.
      • Total capacity for Orientation B:
        • NB=6×3=18 planter boxesN_B = 6 \times 3 = 18\,\text{planter boxes}
    • Optimal Geometric Configuration:
      • The maximum number of beds that can be positioned while adhering to the 0.5 m0.5\,\text{m} clearance buffer is 20 planter boxes20\,\text{planter boxes}, deployed in a 5×45 \times 4 orthogonal grid arrangement.

Cuboidal Timber Compost Bin Design & Surface Area (Question 5)

  • Geometric Form and Outer Dimensions:

    • Structure: Closed six-faced rectangular cuboid.
    • Length (ll): 2.5 m2.5\,\text{m}.
    • Width (ww): 1.2 m1.2\,\text{m}.
    • Height (hh): 0.8 m0.8\,\text{m}.
  • Internal Storage Capacity (Volume):

    • Formula for cuboid volume:
      • V=l×w×hV = l \times w \times h
    • Calculation:
      • V=2.5 m×1.2 m×0.8 mV = 2.5\,\text{m} \times 1.2\,\text{m} \times 0.8\,\text{m}
      • V=3.0 m2×0.8 m=2.40 m3V = 3.0\,\text{m}^2 \times 0.8\,\text{m} = 2.40\,\text{m}^3
    • The internal composting volume is exactly 2.4 m32.4\,\text{m}^3.
  • Total Exterior Surface Area (SASA) for Protective Sealant:

    • Formula for total outer surface area of a closed rectangular prism:
      • SA=2(lw+lh+wh)SA = 2(lw + lh + wh)
    • Pairwise face area evaluations:
      • Top and bottom faces: 2×(2.5 m×1.2 m)=2×3.00 m2=6.00 m22 \times (2.5\,\text{m} \times 1.2\,\text{m}) = 2 \times 3.00\,\text{m}^2 = 6.00\,\text{m}^2
      • Front and back faces: 2×(2.5 m×0.8 m)=2×2.00 m2=4.00 m22 \times (2.5\,\text{m} \times 0.8\,\text{m}) = 2 \times 2.00\,\text{m}^2 = 4.00\,\text{m}^2
      • Left and right end faces: 2×(1.2 m×0.8 m)=2×0.96 m2=1.92 m22 \times (1.2\,\text{m} \times 0.8\,\text{m}) = 2 \times 0.96\,\text{m}^2 = 1.92\,\text{m}^2
    • Summation:
      • SA=6.00 m2+4.00 m2+1.92 m2=11.92 m2SA = 6.00\,\text{m}^2 + 4.00\,\text{m}^2 + 1.92\,\text{m}^2 = 11.92\,\text{m}^2
    • Total surface area requiring weatherproofing sealant: 11.9 m211.9\,\text{m}^2 (to 3 s.f.) or exactly 11.92 m211.92\,\text{m}^2.

Plant Seed Selection & Theoretical Probability (Question 6)

  • Sample Space Inventory:

    • Total seed packets contained within tray (NN): 80 packets80\,\text{packets}.
    • Breakdown by plant variety:
      • Tomato packets: 3636
      • Lettuce packets: 2424
      • Pepper packets: 1212
      • Cucumber packets: 88
    • Total verification check: 36+24+12+8=8036 + 24 + 12 + 8 = 80.
  • Single-Event Selection Probability (Lettuce):

    • Theoretical probability definition:
      • P(E)=Number of favourable outcomesTotal number of possible outcomesP(E) = \frac{\text{Number of favourable outcomes}}{\text{Total number of possible outcomes}}
    • Application for a single randomly chosen lettuce packet:
      • P(Lettuce)=2480P(\text{Lettuce}) = \frac{24}{80}
    • Simplifying by finding the greatest common divisor (GCD=8\text{GCD} = 8):
      • P(Lettuce)=24÷880÷8=310P(\text{Lettuce}) = \frac{24 \div 8}{80 \div 8} = \frac{3}{10}
    • Decimal representation: 0.300.30
  • Repeated Trials with Replacement and Mathematical Expectation:

    • Total independent sampling iterations: n=250 trialsn = 250\,\text{trials}.
    • Probability of drawing a tomato seed packet in any individual trial:
      • P(Tomato)=3680=36÷480÷4=920=0.45P(\text{Tomato}) = \frac{36}{80} = \frac{36 \div 4}{80 \div 4} = \frac{9}{20} = 0.45
    • Expected value formula for a discrete binomial process:
      • E(X)=n×pE(X) = n \times p
    • Computation:
      • E(X)=250×920=12.5×9=112.5E(X) = 250 \times \frac{9}{20} = 12.5 \times 9 = 112.5
    • A student is expected to pick a tomato seed packet 112.5 times112.5\,\text{times} (or 112112 to 113 times113\,\text{times} in practical counts).

Greenhouse Water Demand & Deficit Modeling (Question 7)

  • Greenhouse Operational Conditions for July:

    • Month: July (31 days31\,\text{days}).
    • Active planter bed installations: 12 boxes12\,\text{boxes}.
    • Daily consumption coefficient per planter box: 18.5 litres/box/day18.5\,\text{litres/box/day}.
  • Total July Water Demand:

    • Daily aggregate irrigation demand (DdailyD_{\text{daily}}):
      • Ddaily=12 boxes×18.5 L/box/day=222.0 litres/dayD_{\text{daily}} = 12\,\text{boxes} \times 18.5\,\text{L/box/day} = 222.0\,\text{litres/day}
    • Total monthly water demand (DJulyD_{\text{July}}) over 31 days31\,\text{days}:
      • DJuly=222.0 L/day×31 days=6882 litresD_{\text{July}} = 222.0\,\text{L/day} \times 31\,\text{days} = 6882\,\text{litres}
  • July Water Budget and Ending Reserve:

    • Initial thermal storage water capacity (V0V_0 from Question 3 cylindrical tank):
      • Using exact base capacity: V0=2592π L≈8143.01 litresV_0 = 2592\pi\,\text{L} \approx 8143.01\,\text{litres} (or rounded value of 8140 litres8140\,\text{litres}).
    • Rainfall contribution captured during July (RJulyR_{\text{July}}):
      • RJuly=2400 litresR_{\text{July}} = 2400\,\text{litres}
    • Total available water volume before consumption:
      • Vavail=V0+RJuly=8143.01 L+2400 L=10543.01 litresV_{\text{avail}} = V_0 + R_{\text{July}} = 8143.01\,\text{L} + 2400\,\text{L} = 10543.01\,\text{litres}
      • (If using 8140 L8140\,\text{L}: 8140+2400=10540 litres8140 + 2400 = 10540\,\text{litres}).
    • Net storage remaining at the end of July (VendV_{\text{end}}):
      • Vend=Vavail−DJulyV_{\text{end}} = V_{\text{avail}} - D_{\text{July}}
      • Vend=10543.01 L−6882 L=3661.01 litresV_{\text{end}} = 10543.01\,\text{L} - 6882\,\text{L} = 3661.01\,\text{litres}
      • (If using 8140 L8140\,\text{L}: 10540 L−6882 L=3658 litres10540\,\text{L} - 6882\,\text{L} = 3658\,\text{litres}; both round to 3660 litres3660\,\text{litres} to 3 s.f.).
  • Post-July Depletion Lifespan in August:

    • Conditions: Daily irrigation requirement remains 222.0 litres/day222.0\,\text{litres/day}; zero supplemental rainfall input (0 L0\,\text{L}).
    • Days remaining of water supply (TT):
      • T=VendDdaily=3661.01 L222.0 L/day≈16.491 daysT = \frac{V_{\text{end}}}{D_{\text{daily}}} = \frac{3661.01\,\text{L}}{222.0\,\text{L/day}} \approx 16.491\,\text{days}
      • (If using 3658 L3658\,\text{L}: 3658222≈16.477 days\frac{3658}{222} \approx 16.477\,\text{days}).
    • The remaining water supply will support the greenhouse for approximately 16.5 days16.5\,\text{days} (or 16 full operational days16\,\text{full operational days}).

Cost Efficiency Analysis & Multi-space Geometry (Question 8)

  • Candidate Auxiliary Storage Tank Specifications:

    • Option A (Spherical Tank Geometry):
      • Radius: r=1.0 mr = 1.0\,\text{m}.
      • Purchase Cost: \n      650.
      • Geometric Volume Formula: V=43πr3V = \frac{4}{3}\pi r^3.
    • Option B (Cuboidal Tank Geometry):
      • Dimensions: Length 1.5 m1.5\,\text{m}, Width 1.5 m1.5\,\text{m}, Height 1.8 m1.8\,\text{m}.
      • Purchase Cost: \n      820.
      • Geometric Volume Formula: V=l×w×hV = l \times w \times h.
  • Volumetric Capacity and Unit Cost Derivations:

    • Analysis of Option A (Spherical):
      • Volume in m3\text{m}^3:
        • VA=43π(1.0 m)3=43π m3≈4.18879 m3V_A = \frac{4}{3}\pi (1.0\,\text{m})^3 = \frac{4}{3}\pi\,\text{m}^3 \approx 4.18879\,\text{m}^3
      • Capacity in litres (1 m3=1000 L1\,\text{m}^3 = 1000\,\text{L}):
        • CapacityA=4.18879×1000=4188.79 litres\text{Capacity}_A = 4.18879 \times 1000 = 4188.79\,\text{litres}
        • Rounded to 3 s.f.: 4190 litres4190\,\text{litres}.
      • Cost per litre ($/litre\text{\$/litre}):
        • \text{Unit Cost}_A = \frac{\text{Total Cost}}{\text{Capacity}} = \frac{\\n      650}{4188.79\,\text{L}} \approx \\n      0.15517/\text{litre}
        • Expressed to 3 s.f.: \$\n      0.155/\text{litre} (15.5 cents/litre15.5\,\text{cents/litre}
    • Analysis of Option B (Cuboidal):
      • Volume in m3\text{m}^3:
        • VB=1.5 m×1.5 m×1.8 m=4.050 m3V_B = 1.5\,\text{m} \times 1.5\,\text{m} \times 1.8\,\text{m} = 4.050\,\text{m}^3
      • Capacity in litres:
        • CapacityB=4.050×1000=4050 litres\text{Capacity}_B = 4.050 \times 1000 = 4050\,\text{litres}
      • Cost per litre ($/litre\text{\$/litre}):
        • \text{Unit Cost}_B = \frac{\text{Total Cost}}{\text{Capacity}} = \frac{\\n      820}{4050\,\text{L}} \approx \\n      0.20247/\text{litre}
        • Expressed to 3 s.f.: \$\n      0.202/\text{litre} (20.2 cents/litre20.2\,\text{cents/litre}
  • Financial Value Decision and Recommendation:

    • Metric Comparison Summary:
      • Total Volume: Option A (4190 L4190\,\text{L}) provides 140 litres140\,\text{litres} more capacity than Option B (4050 L4050\,\text{L}).
      • Initial Investment: Option A (\$\n      650) is \$\n      170 cheaper upfront than Option B (\$\n      820).
      • Cost-Efficiency: Option A costs \$\n      0.155/\text{litre} versus Option B at \$\n      0.202/\text{litre}.
    • Mathematical Conclusion: Option A is superior as it achieves a significantly lower cost per unit volume (\\n      0.155/\text{L} < \\n      0.202/\text{L}) while offering larger total water storage at a lower total capital outlay.