Gr.B AME 70 % Quota Examination – Comprehensive Study Notes
Coach & Bogie Technical Parameters
- New ICF coach wheel
- Nominal (new) diameter : 915\,\text{mm}
- Condemning dia. for BOX-N wagon wheel : 906\,\text{mm}
- ICF bogie force-transmission elements
- Centre pivot pin – carries vertical load + transmits tractive forces
- Side bearer – takes body load
- Equilibrating stays – check lateral thrust on bolster springs
- Anchor links do NOT take tractive/braking forces ➜ statement tested in exam
- LHB coach features
- Coupler : H-type CBC
- Bogie / body force path : Traction centre
- Frequent wheel defect : Shelled tread
- Emergency quick-fill device : Brake accelerator valve (helps in faster brake build-up when driver makes an emergency application)
- FIBA secondary air-suspension (LHB)
- Duplex check valve equalises pressure between left & right air springs of same bogie
- Draw-gear (ICF)
- Components : Draw bar, Draft key, Draft gear, Rubber pads
- NOT a component : Destruction tube (dummy answer in exam)
- Coach lifting with a 140 t crane
- Use lifting beam between slings & body to spread load and avoid body damage
Brake Systems & Pneumatics
- Coaching rake air-leakage test (BP pressure drop)
- Max. allowable leak : 0.6\,\text{kg cm}^{-2} in 180\,\text{s} after cock shut
- Bogie-mounted brake system (BMBS) – Wagons
- 2 brake cylinders/bogie + cylinders incorporate in-built automatic slack adjuster
- CASNUB bogie variants
- 22 NL (non-BMBS) : brake head is integral with brake beam
- LHB brake control
- Brake accelerator valve at coach end senses sudden \Delta P in BP and vents aux. reservoir for quicker cylinder build-up
- Brake power certificates (BPC)
- BOXNHL CC rake (trial) validity : 10000\,\text{km} / (35+5)\,\text{days}
- Premium freight train BPC colour : Green
Wheel / Axle Health Monitoring
- On-line Monitoring of Rolling stock (OMRS) misses high bearing temperature; detects flat, shelling, etc.
- Ultrasonic axle test normally finds cracks, inclusions, stress-risers; corrosion is NOT generally picked
Electrical & HVAC on Coaches
- Roof-mounted AC package unit supply : 415\,\text{V}, 3\,\phi, 50\,\text{Hz}
- VESDA = Very Early Smoke Detection Apparatus (aspirated smoke sampling)
Freight Wagons & Brake Vans
- Side-discharge open wagon type : BOBYN (for coal/ore)
- Brake van with CASNUB bogies : BVCM
- Centre Buffer Coupler (CBC) defects causing uncoupling :
- Excess knuckle or lock wear
- Wear of bearing-piece slot on operating handle
- Any of the above ➜ all options correct in exam
- ODC speed limits : Class “B” — 40\,\text{km h}^{-1} max.
Locomotive Systems
ALCO (2600 HP)
- Air-compressor : driven off diesel crankshaft via flexible coupling
- Compression ratio : 11.75:1
- Pressurised cooling water system : raises boiling point, dissipates more heat, avoids hot-engine faults (✓ all)
EMD (HHP 4000/4500 HP)
- Radiator fan : 3-phase induction motor drive
- Companion alternator feeds radiator-fan motor circuit
- Bogie frame : High-Tensile Cast Steel (HTCS)
Vande Bharat Trainset – 3-ϕ propulsion
- Traction inverter converts DC-link output to variable-V/f 3-ϕ AC for traction motors
Scheduled Maintenance & Inspection
- 1400 HP DEMU Cummins DPC — ‘D’ check periodicity : 18\,\text{months} \pm30\,\text{d}
- Wheel defects – LHB shelled tread, high flange, flat, etc.
Safety, Operating Rules & Signalling
- SPAD (Signal Passed At Danger) : poor running-room food is NOT a cause
- Loco-pilot feels jerk on passenger train → Must stop at next block station without clearing section & inform SM
- Fixed vs non-fixed signals :
- Fixed : Home, Starter, Shunt
- Detonators are hand signals, hence NOT fixed
- Speed indicator board shape : Triangular; speed shown in multiples of 10\,\text{km h}^{-1}
- Working Time-Table (WTT) carries permanent speed restrictions, MPS & Engg. allowance but NOT temporary restrictions (those are in T/371s, Caution Orders)
Disaster Management & Breakdown Cranes
- NDMA chair : Prime Minister; NDRF = National Disaster Response Force
- Commercial Dept. pays ex-gratia to victims’ kin
- 140 t crane
- Brakes : Wheel-mounted disc
- Safe working : Parking brake ON, outriggers firmly grounded, SLI must not be bypassed (unsafe practice)
- Cold-cutting equipment (ART/ARMV) for hole making : Tre-panner
Materials, Metallurgy & Processes
- Stainless-steel corrosion resistance from \text{Cr} (≥ 10.5 wt%)
- Surface-hardening no-go process : Tempering (it softens)
- Welding without consumable electrode : GTAW (TIG)
- Casting feeder column : Riser
- Forging essential tool : Die
- Milling : multi-edge cutter rotary machining
- Non-Destructive vs destructive testing : Impact test is destructive
- Heat-treatment surface hardening options : Carburising, Nitriding, Cyaniding (case-depth diffusional)
Painting & Surface Prep.
- PU vs Alkyd paint
- PU superior in abrasion, corrosion, gloss retention
- Not low cost (false statement in exam)
- Surface cleaning steps pre-painting
- Shot-blasting, hot phosphating, scraping
- Wet-flattening is NOT a recognised cleaning step
- Paint film defects
- Peeling : rupture/lift of top layer
- Electrical fires category : Class E
Workshop Management & Production Control
- Process costing suits continuous/identical-unit flow ➜ Wheel manufacturing
- ‘Occupier’ under Factories Act for a Railway workshop appointed by General Manager
- Production Control Org.
- Inspection section certifies job/route cards
- Group Incentive Scheme salient point
- Idle time booked only for power failure > 1 h
- Factories Act weekly work-hour limit (incl. overtime) : 60\,\text{h}
Industrial Relations & Labour Acts
- Protective Act against exploitation : Trade Union Act, 1926
- PSU under MoR : RITES, RVNL, IRCON (all)
- Millwright shop is a service/maintenance shop, not production
Finance, Estimates & Contracts
- Capital vs Revenue
- Mechanised coach cleaning → charge to Revenue, NOT Capital
- Sundry revenue excludes parcel earnings (comes under Goods)
- GM’s power (PH-4200) : sanction works up to 10\,\text{cr}
- PCME’s power to sanction M&P (PH-4100) : \le 50\,\text{lakh}
- Environmental works ceiling in estimates : 0.5\% of total cost
- Performance Guarantee for works contracts : 5\% of contract value
- Rate Contract definition : supplier obliged to supply any qty at fixed rate during validity
- GEM may be used for service contracts (mechanised cleaning, OBHS, station cleaning, etc.)
- Tender Committee membership limit : Sr. Scale exec officer can sit up to \text{₹ }4\,\text{cr} for open tenders
- PAC item indents : PHOD signature required > ₹ 25 lakh
- Works Estimate – environmental component \le 0.50\%
Stores & Codes
- PL (Price List) number digits : 8
- Main group code “30–39” : Carriage & Wagon items
HR , Leave & Passes
- Medical category for direct JE/Mech (PU) : C-1
- Child-Care Leave
- 730 days total; can be clubbed with other leave; draws full pay only for first 365 days (thereafter 80 %) ➜ exam stated: “full salary for entire 730 d” is incorrect
- Also available to single male employees
- MACP
- 3 financial up-gradations at 10-20-30 yrs; does NOT alter seniority (wrong statement tested)
- LAP encashment during service : max 60\,\text{days}
- Suspension entitlements : subsistence allowance, medical treatment, stay at HQ unless permitted; not full pay, no leave ex-India, etc.
- Major vs minor penalties (D&AR)
- Recovery for pecuniary loss is minor not major
- Suspension is not a penalty (administrative action)
- HRMS modules
- Present : Pass, Leave, Cadre Mgmt.
- D&AR module not yet live
- Electronic passes not issued through HRMS : School pass for bona-fide student
- Post-retirement Complimentary Passes (Grp A/B) : 3 sets / year
- Commutation of pension : max 40\% of basic
- Qualifying service for pension : \ge 10\,\text{yrs}
- Family pension eligibility includes spouse, dependent son (<25 yr), mentally retarded son ➜ any of these
Official Language & Constitutional Provisions
- Constitution – Part V, Article 120 covers language in Parliament
- Hindi awards by Rly Board
- Maithili Sharan Gupta award – Hindi poetry book
- Region-“B” state exclusion : West Bengal (hence falls in Region C)
- Hindi courses equivalence
- Pragya = Matric level Hindi competency
- Section 3(3) OL Act ➜ general orders, tender notices, press releases etc. to be bilingual (Hindi + English)
- Zonal OL Implementation Committee chaired by GM
- National Hindi Day : 14 Sept
- 8th Schedule languages : 22
- Correct Hindi meaning check : Recommendation ≠ समझौता (should be “सिफ़ारिश”)
Safety Hours, HOER & Misc.
- HOER categories – Waiting-room bearer ⇒ "Essentially Intermittent" (EI)
- Non-fixed signal example : detonating (torpedo)
- Cold cutting hole-maker – Tre-panner
- Safe Load Indicator on crane must not be bypassed
Abbreviations & Codes Quick-List
- VESDA – Very Early Smoke Detection Apparatus
- FIBA – (LHB) Fault Indication & Brake System for air-sprung bogies
- CBC – Centre Buffer Coupler
- BMBS – Bogie-Mounted Brake System
- BPC – Brake Power Certificate
- OMRS – On-line Monitoring of Rolling Stock
- HMIS – Hospital Management Info. System
- HRMS – Human Resource Mgmt. System
- GEM – Govt. e-Marketplace
- NDMA/NDRF – National Disaster Mgmt. Authority / Response Force
These consolidated notes reproduce all key data points from the Shift-1 70 % AME Gr-B question paper, inter-linking technical, operational, financial and statutory knowledge for rapid revision.