GMS note 7
Managing Quality & Quality Control
Quality and Strategy
### Quality as a Competitive Advantage Organizations achieve a competitive advantage through:
Differentiation
Offering unique, high-quality products.
Example: Bose differentiates its audio systems based on superior sound quality that meets customer expectations.
Cost Leadership
Producing quality goods at low cost.
Example: Nucor Steel produces quality steel efficiently via consistent processes, enabling lower pricing.
Response
Providing quick, customized service.
Example: Dell builds PCs to customer specifications within hours, enhancing customer satisfaction.
Conclusion: Quality drives strategic approaches in organizations by boosting customer satisfaction and enhancing market success.
Quality and Profitability
How Quality Improvement Increases Sales
Speed Response
Faster service fosters customer trust, resulting in increased sales.
Flexible Pricing
Higher quality enables competitive yet profitable pricing strategies.
Improved Reputation
A strong brand reputation encourages repeat business and customer loyalty.
### How Quality Improvement Reduces Costs
Reduced rework and scrap.
Fewer warranty claims and failures.
Lower inspection and maintenance costs.
Overall Insight: Quality enhancements lead to reduced internal and external failures while increasing value delivery.
Cost of Quality (COQ)
### Definition
The Total Cost of Quality (COQ) pertains to all expenditures made to attain and keep quality standards free of defects, encompassing costs for conformance and repercussions of non-conformance.
Categories of COQ
Category | Description | Examples |
|---|---|---|
Prevention Costs | Investments to avoid defects before they occur. | Training, maintenance, quality planning. |
Appraisal Costs | Costs incurred in inspecting product quality. | Testing, audits, inspections. |
Internal Failure Costs | Costs arising from defects before products reach customers. | Rework, scrap, downtime. |
External Failure Costs | Costs associated with defects after products have been used by customers. | Warranty claims, returns, lost customers. |
### Good vs. Bad Costs
Good Costs: Prevention + Appraisal = Investments that enhance quality.
Bad Costs: Internal + External Failure = Wasted resources due to poor quality.
Goal: Transition the focus from failure costs to prevention costs.
Total Quality Management (TQM)
### Definition
Total Quality Management (TQM) is a comprehensive approach integrating all organizational functions and processes with the aim of achieving continuous improvement and elevated customer satisfaction.### Core Principles of TQM
Satisfy customer requirements.
Execute tasks correctly in the first attempt.
Ensure consistency (reduce variation).
Commit to continuous improvement.
Instill quality in all organizational endeavors.
Seven Concepts of TQM
Continuous Improvement (Kaizen)
Mandates continual enhancements in quality, processes, and efficiency.
Six Sigma
A data-driven strategy aimed at minimizing defects and variability in processes.
Employee Empowerment
Promotes staff participation and responsibility toward quality initiatives.
Benchmarking
Involves comparing organizational performance against industry leaders.
Just-In-Time (JIT)
Aims to minimize inventory and defects by aligning production schedules with demand.
Taguchi Concepts
Focuses on designing robust systems that can withstand variations.
Knowledge of TQM Tools
Involves the application of statistical and analytical methods for effective quality control.
Continuous Improvement Process (CIP)
Recognizes that innovation leads to continually changing performance standards. Processes deemed effective today may become obsolete tomorrow.
PDCA (Deming) Cycle
A four-step model for continuous improvement:
Plan: Identify customer needs and establish goals.
Do: Execute improvements or solutions.
Check: Assess results and identify issues or areas for improvement.
Act: Implement corrective actions and standardize successes.
The PDCA cycle is perpetuated consistently to uphold progress.
Six Sigma
### Meaning
A methodology that initially emerged from Motorola, later propagated by GE and Honeywell.### Two Interpretations
Statistical:
Represents a 99.9997% defect-free rate, equating to 3.4 defects per million opportunities.
The process variation fits within a range of ±6σ.
Philosophy:
A disciplined framework aimed at diminishing defects, reducing costs, and improving customer satisfaction.
Taguchi Concepts
### Philosophy
The majority of quality problems originate within product and process design.### Key Elements
Robust Design: Ensures that products deliver consistent performance even in adverse conditions.
Quality Loss Function (QLF): The societal costs increase as products deviate from their target specifications, even when such deviations fall within tolerance limits.
Variables:
(L): Loss incurred.
(C): Cost associated with a deviation at the specification limit.
(D): Deviation from the target value.
Example of QLF Calculation:
If deviation = 2 ohms, target loss at 5 ohms = $10.
Tools of TQM (The “Magnificent Seven”)
Tool | Purpose |
|---|---|
Check Sheet | Collects data to highlight patterns or trends. |
Pareto Chart | Identifies the limited causes responsible for the majority of issues. |
Histogram | Displays frequency distribution of measured values. |
Scatter Diagram | Illustrates relationships between two variables. |
Cause-and-Effect Diagram (Fishbone) | Identifies root causes for defects. |
Flowchart | Mapped visual representation of the process sequence for clarity. |
Control Chart | Monitors variations of a process over time. |
Example: Check Sheet for Hospital Delays
Reason | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
Overload of patients | 5 | 2 | 2 | 5 | 7 | 21 |
Patient discharge problems | 2 | 1 | 1 | 2 | 4 | 10 |
Staff problems | 5 | 2 | 5 | 1 | 2 | 15 |
Lack of rooms | 5 | 2 | 4 | 5 | 5 | 21 |
Pareto Chart
Utilizes the 80/20 rule to articulate that 80% of issues generally stem from 20% of causes.
Bars arranged by frequency with a cumulative percentage line to concentrate efforts.
Addressing the top three causes may potentially resolve approximately 85% of delays.
Histogram
Visual depiction of performance data distribution.
Example: Repair times indicating the most prevalent duration is between 10-15 minutes.
Steps to Create a Histogram:
Select measure.
Gather data.
Develop frequency table.
Create the histogram chart.
Interpret results.
Scatter Diagram
Exhibits correlations between pairs of variables:
Positive Correlation: As x increases, y also increases.
Negative Correlation: As x increases, y decreases.
No Correlation: Random scatter implies no relationship.
Nonlinear Pattern: Curvilinear correlations.
Fishbone (Cause-and-Effect) Diagram
A visual technique used to identify potential causes categorized under:
Materials
Methods
Machines
Manpower
Measurement
Environment
Example: Causes of lead-time delays can include supplier issues, transportation problems, and demand variations.
Flowchart
A schematic representation of steps within a process that assists in identifying inefficiencies or bottlenecks (e.g., a hospital emergency service flow).
Statistical Process Control (SPC)
### Purpose
To observe, quantify, and amend process variations in real-time.### Types of Variation
Natural (Common) Causes: Random variations that are typically expected.
Assignable (Special) Causes: Variations that can be identified and corrected, e.g., operator errors or machine malfunctions.
Control Chart
A graphical representation of process performance data featuring upper and lower control limits.
Performance Measurement
### Categories
Variables: Continuous measures (e.g., weight, length, and time).
Attributes: Categorical measures (e.g., defective or non-defective).
Advantages
Variables: Provide more detail concerning the magnitude of errors.
Attributes: Simpler and faster for inspection processes.
Sampling Concepts
Impracticality of 100% Inspection: Given high costs and logistical constraints, sampling becomes necessary.
Objective: To estimate the characteristics of a process (mean, variance) utilizing statistics derived from samples.
Process Distribution: Represents the totality of the production population.
Sampling Distribution: Refers to the distribution of sample averages; it gradually resembles a normal curve as per the Central Limit Theorem.
Central Limit Theorem (CLT)
States that, regardless of the population distribution shape, sample means tend to create a normal distribution if the sample size is sufficiently large (n ≥ 30).
The mean of sample means is denoted by .
The standard deviation of sample means is given by .
Distribution Regions:
99.73% of results fall within the range of .
95.45% falls within the range of .
Control Charts for Variables
### Purpose
To differentiate between random and assignable variation using time-series records.### Chart Types and Purposes
Chart Type
Monitors
Purpose
x̄ Chart
Process mean
Identifies central tendency.
R Chart
Range
Assesses variability across samples.
Example Grouped Under Oat Flakes Box Weight
Mean: 16g, , z = 3 → 99.73% of weights fall within specific limits.
If samples exceed control limits, an investigation into assignable causes is required.
Mean and Range Chart Interpretation
The x̄ -Chart reveals shifts in the process mean.
The R-Chart shows alterations in variability.
Utilizing both charts supports maintaining stable and predictable operations.
Control Charts for Attributes
Utilized for categorical data, specifically for counting the number of defects.
### A. p-Chart
Monitors the proportion of defects, leveraging the binomial distribution.
Example: Clinic Waiting Time:
Sample size n = 70; 15 samples denote 80 total defects.
Mean proportion calculated as .
Indicates the process is in control with no points exceeding set limits.
### B. c-Chart
Appropriate when multiple defects per unit may arise (e.g., typos, malfunctions in circuits).
Distribution Mechanisms:
Population adheres to the Poisson distribution, but sampling aligns with a normal approximation.