Definition: Mensuration is the application of mathematical formulae in the setting out and calculation of dimensions.
Objective: To demonstrate the relationship between the application of formulae and the units of measurement as described in the latest edition of the Standard System of Measuring Builders' Work (SSMBW).
Outcomes: By the end of this module, the student should be able to:
- Identify areas and volumes from a technical drawing.
- Successfully book dimensions of various formulae on standard dimension paper.
Significance in Building Work: Mensuration is essential for determining:
- Dimensions: length, breadth, depth, thickness, and height.
- Descriptions of building elements.
- Units of measurement.
- Physical quantities.
- Methodology and systematic approach to measurement.
Method and Components of Measurements
Setting Out the Work: This involves utilizing descriptions and dimensions to calculate quantities.
Sidecasts: These are supporting calculations used when dimensions must be amplified, amended, explained, or clarified.
References: Documenting the sources of dimensions or information used in descriptions.
Units of Measurement: Standardized units used for different spatial qualities:
- Perimeter (P), Length, or Circumference: Measured in metres (m).
- Area (A): Measured in square metres (m2).
- Volume (V): Measured in cubic metres (m3).
Measurement of 2D Shapes and Areas
Square:
- Example: Side length of 3000mm (3.00m).
- Perimeter (P): 3.00m×4=12.00m.
- Area (A): 3.00m×3.00m=9.00m2.
Rectangle:
- Example: Dimensions of 7000mm×3000mm (7.00m×3.00m).
- Perimeter (P): (2×7.00m)+(2×3.00m)=20.00m.
- Area (A): 7.00m×3.00m=21.00m2.
Trapezium:
- Formula for Area (A): 2Sum of top and bottom parallel sides×height.
- Example: Top (3100mm), Bottom (4750mm), height (1900mm).
- Calculation Step: 23.10m+4.75m=3.925m.
- Result Area: 3.10m+4.75m=7.85m total of bases; 27.85m=3.925m; final calculation shown as 3.93×1.89=7.43m2 (subject to rounding).
Triangle:
- Formula for Area (A): 21×base×height.
- Example: Base (7.15m), Sides (8.98m), Height (8.24m).
- Perimeter (P): (2×8.98m)+7.15m=25.11m.
- Area (A): 21×7.15m×8.24m=29.46m2.
Sector of a Circle:
- Length (L): 2×π×r×360n, where n is the angle in degrees.
- Example Sector: Angle 80∘, Radius 1.50m.
- Perimeter: (2×1.50m)+(36080×2×π×1.50m)=5.10m.
- Area (A): π×r2×360n=1.57m2.
Fillet:
- Formula for Area: R2−4π×R2.
- Example: Radius (R) = 2500mm (2.50m).
- Area calculation: (2.50×2.50)−4π×2.50×2.50=1.34m2.
Measurement of 3D Shapes and Solids
Pyramid (Square Base):
- Volume (V): 31×Area of base×height.
- Area (A): 2×S×L, where S is side length and L is sloping length (Note: This specific formula applies only to square pyramids).
- Alternative Area: (Area of 4 triangles) = (21×base×height)×4.
Pyramid (Non-Square Base):
- Volume calculation based on the specific base area provided.
Cone:
- Volume (V): 31×Area of base×height=31πr2h.
- Area of sloping side: π×r×sloping height.
Partial Pyramid or Frustum (Square Base):
- Volume (V): 3H×[A+a+A×a], where A is the area of the large base and a is the area of the small base.
- Area: Area of top + Area of bottom + Area of 4 sloping sides.
Partial Pyramid (Non-Square Base):
- Volume (V): 3H×[A+a+A×a].
- Area: Area of top + Area of bottom + Area of 4 sloping sides.
Frustum of a Cone:
- Volume (V): 3H×[A+a+A×a].
- Area: Sum of top surface area, bottom surface area, and 21×Slant Height×(Circumference A+Circumference B).
Prismoid:
- Definition: A solid with parallel ends and planar sides (like a prism).
- Volume (V): 6L×[A+a+4M], where A and a are areas of planar ends and M is the area of the middle section.
Spiral:
- Length (L): C2+P2×Ps.
- Where C=π×D (Circumference), P is pitch (e.g., 3000mm), and D is diameter (e.g., 900mm).
Calculations for Regular Polygons and Irregular Shapes
Regular Polygons (Equal Sided Figures):
- Formula for Area: A=S2×constant, where S is the length of one side.
- Table of Constants:
- Triangle (3 sides): 0.433013
- Square (4 sides): 1
- Pentagon (5 sides): 1.720477
- Hexagon (6 sides): 2.59876
- Heptagon (7 sides): 3.633912
- Octagon (8 sides): 4.828427
- Nonagon (9 sides): 6.181824
- Decagon (10 sides): 7.694209
- Undecagon (11 sides): 9.36564
- Dodecagon (12 sides): 11.19615
- Volume determination: Area×height.
Irregular Shapes (Simpson's Rule):
- Used to determine the area of irregular shapes.
- Formula: 3D×[first ordinate+4(even ordinates)+2(remaining ordinates)].
- Note: To apply Simpson's rule, the shape must be divided into an even number of strips.
Mensuration Exercises and Practical Problems
Exercise 1: Octagon Building:
- Internal dimensions: 3436mm per side.
- External dimensions: 3784mm per side.
- Wall thickness: 220mm. Height: 3000mm.
- Building Details: 4 standard doors (813×2032mm), 1 double door with fanlight (600mm) and sidelight (400mm), 4 windows (1295×996mm).
- Material specs: 54 bricks/m2 for 110mm wall; 15% waste allowance on bricks.
- Tasks: Calculate (a) vinyl floor area, (b) net external plaster area, (c) net number of bricks for superstructure and foundations (900mm deep).
Exercise 2: Circular Column with Frustum Head:
- Column: Diameter 300mm, Height 3m.
- Head (Upside down conical frustum): Top diameter 1m, Head height 350mm.
- Concrete mix: 1:2:5; Bulking: 30%; Waste: 7%; Constant: 30.3 pockets/m3.
- Costs: Cement R 85.00/pocket, Sand R 350.00/m3, Stone R 400.00/m3.
Exercise 3: Circular Dam Construction:
- Requirements: Water for 1000 cattle (10L/day), 5000 sheep (3L/day), and 5000 goats (4L/day) for 100 days.
- Specifications: Wall height 2.5m, wall/floor thickness 500mm.
- Constants: 1000litres=1m3; Radius=Area÷722.
Exercise 4: Steel Springs for Manufacturing:
- Volume: 36,900 bakkies/year for 6 years; 4 springs/bakkie.
- Spring specs: 250mm diameter, 7 full circles, each circle 65mm apart.
- Raw material: High tensile steel rods, each 6000mm long.
- Tasks: Determine the number of rods required and the percentage waste.
Exercise 5: Site Excavation Logistics:
- Site ABCD over sloping ground. Sides excavated to angle of repose (45∘).
- Dimensions: AB=180m, CD=300m, AD=200m.
- Depths: A=2389mm, B=0, C=0, D=3217mm.
- Logistics: 20% bulking factor. Trucks are 7m3. Working day is 8 hours. Truck turnaround time (load/travel) is 45 minutes. Total available time: 20 days.