Untitled
Introduction
- Participants: Phil, Connor, Brian, and others.
- Setting: A call discussing roles and responsibilities related to Quality Management Systems (QMS) at Aerodyne.
Role Overview
- Phil's Position - Title: QMS Manager - Duration: Officially in role for approximately 1.5 years; affiliated with Aerodyne for about ten and a half years. - Previous Roles: - Quality Manager in the past. - Quality Engineer prior to that. - Responsibilities: - Overseeing document control and processes within the QMS. - Managing internal and external audits (specifically aerospace-related).
Quality Management Systems (QMS)
- Definition: QMS refers to a formalized system that documents processes, procedures, responsibilities, and resources for achieving quality policies and objectives.
- Importance of Document Control: - Controlled modification access to documents (only owners of processes can modify). - Related to compliance with AS 9100 standards, which incorporate ISO 9001 with added aerospace requirements.
Documentation Management
Historical Context - Master files include Word documents, Excel files, PowerPoint presentations stored on the company’s G drive under the folder path:
ISO docs current. - Evolution from ISO 9001 to AS 9100 influenced the current documentation practices.Types of Documentation - Reference charts, forms, work instructions, procedures, process diagrams, etc. - Documentation tracks processes from receiving customer quotes to product shipping, ensuring quality assurance throughout the lifecycle.
AS 9100 Standards
- Overview: AS 9100 is an international standard for quality management systems in the aerospace industry.
- Key Requirement: - Organizations must articulate what they do in written procedures followed by a practical verification that aligns with stated processes in audits.
Discussion on Documentation Accessibility
- A proposal to discuss document locations and types to ensure long-term management.
- Discussion of container actions and immediate corrections related to nonconformance during the audits.
Audit Process and Root Cause Analysis (RCA)
Nonconformance Issues - Immediate Action: Narrowed read/write permissions in ISO docs to only specific individuals (Phil and Frank). - Root Cause Analysis Methods: - Fishbone diagram and 5 Why’s approaches discussed for identifying contributing factors to issues related to document access.
Specific Scenario - A noted incident involved Mike Ross, who was able to access and modify documents during the audit despite expected read-only permissions. - Differentiation of document ownership: Phil manages overall document control but other process owners manage their specific documents.
Action Plan Development
- Need to create an action plan to prevent recurrence of access issues. Requires logs and tracking of permissions.
- Mention of the upcoming CMMC compliance and the importance of retaining logs for better traceability.
Current and Future Recommendations
- Proposals for an internal documentation matrix that outlines access controls for various folders and documents.
- Changes to folder structures discussed as a potential quick fix to streamline permissions management. - Suggestion to move master files into subfolders to reduce complexity in access permissions.
Conclusion
- Agreement to follow up on creating the fishbone diagram and finalize the RCA report by Monday.
- Discussion of helping each other with documentation and process improvements moving forward.
- Acknowledgement of the collaborative effort required to tackle the complexities of the QMS and document control.