Untitled

Introduction

  • Participants: Phil, Connor, Brian, and others.
  • Setting: A call discussing roles and responsibilities related to Quality Management Systems (QMS) at Aerodyne.

Role Overview

  • Phil's Position   - Title: QMS Manager   - Duration: Officially in role for approximately 1.5 years; affiliated with Aerodyne for about ten and a half years.   - Previous Roles:     - Quality Manager in the past.     - Quality Engineer prior to that.   - Responsibilities:     - Overseeing document control and processes within the QMS.     - Managing internal and external audits (specifically aerospace-related).

Quality Management Systems (QMS)

  • Definition: QMS refers to a formalized system that documents processes, procedures, responsibilities, and resources for achieving quality policies and objectives.
  • Importance of Document Control:   - Controlled modification access to documents (only owners of processes can modify).   - Related to compliance with AS 9100 standards, which incorporate ISO 9001 with added aerospace requirements.

Documentation Management

  • Historical Context   - Master files include Word documents, Excel files, PowerPoint presentations stored on the company’s G drive under the folder path: ISO docs current.   - Evolution from ISO 9001 to AS 9100 influenced the current documentation practices.

  • Types of Documentation   - Reference charts, forms, work instructions, procedures, process diagrams, etc.   - Documentation tracks processes from receiving customer quotes to product shipping, ensuring quality assurance throughout the lifecycle.

AS 9100 Standards

  • Overview: AS 9100 is an international standard for quality management systems in the aerospace industry.
  • Key Requirement:   - Organizations must articulate what they do in written procedures followed by a practical verification that aligns with stated processes in audits.

Discussion on Documentation Accessibility

  • A proposal to discuss document locations and types to ensure long-term management.
  • Discussion of container actions and immediate corrections related to nonconformance during the audits.

Audit Process and Root Cause Analysis (RCA)

  • Nonconformance Issues   - Immediate Action: Narrowed read/write permissions in ISO docs to only specific individuals (Phil and Frank).   - Root Cause Analysis Methods:     - Fishbone diagram and 5 Why’s approaches discussed for identifying contributing factors to issues related to document access.

  • Specific Scenario   - A noted incident involved Mike Ross, who was able to access and modify documents during the audit despite expected read-only permissions.   - Differentiation of document ownership: Phil manages overall document control but other process owners manage their specific documents.   

Action Plan Development

  • Need to create an action plan to prevent recurrence of access issues. Requires logs and tracking of permissions.
  • Mention of the upcoming CMMC compliance and the importance of retaining logs for better traceability.

Current and Future Recommendations

  • Proposals for an internal documentation matrix that outlines access controls for various folders and documents.
  • Changes to folder structures discussed as a potential quick fix to streamline permissions management.   - Suggestion to move master files into subfolders to reduce complexity in access permissions.

Conclusion

  • Agreement to follow up on creating the fishbone diagram and finalize the RCA report by Monday.
  • Discussion of helping each other with documentation and process improvements moving forward.
  • Acknowledgement of the collaborative effort required to tackle the complexities of the QMS and document control.