5.05 - Interval Schedules
Overview of Reinforcement Schedules
Reinforcement schedules can be categorized into two types: response-based and time-based schedules.
Fixed Interval Schedule (FI Schedule)
Definition: A fixed interval schedule provides reinforcement after the first response following a predetermined time interval.
Example: An FI-3 minutes schedule.
A timer starts, and after 3 minutes, the first response is reinforced.
Responses before the time elapses do not yield reinforcement.
Key Features:
Only the first response after the set interval is reinforced, not multiple responses.
Encourages waiting until the end of the interval to reinforce behavior.
Scallop Effect
Observation: The pattern of responding in a fixed interval schedule results in a scalloped response curve.
Characteristics:
Initially low response rate at the beginning of the interval.
As the end of the interval approaches, the response rate accelerates sharply.
Results in a distinctive graphical shape resembling a scallop.
Real-World Example: Checking the time or behavior while waiting for a predictable bus arrival:
Low checking frequency after missing the bus in the first few minutes.
Increased checking frequency as the expected arrival time nears.
Contingency Note: The example of checking the watch does not perfectly exemplify fixed interval scheduling, as it lacks a direct contingency to the bus's arrival.
Variable Interval Schedule (VI Schedule)
Definition: In a variable interval schedule, reinforcement is delivered after the first response that follows a variable length of time.
Example: A VI-30 seconds schedule.
Averages to reinforce a response approximately every 30 seconds, but the actual time varies (e.g., sometimes it's 2 seconds or 60 seconds).
Main Effect: Similar to fixed interval, one response after a varying period of time results in reinforcement.
Response Characteristics of VI Schedule
Response Rate: The response rate is low and constant,
Not displaying the scallop pattern as seen in fixed schedules.
Similar to the consistent response rate observed in variable ratio schedules, but generally flatter.
Example of Application: Pop quizzes in education.
Students may study at a consistent, moderate pace to prepare for potential quizzes that are unpredictable.
The schedule encourages studying regularly without knowing exactly when a quiz may occur.
Conclusion of Simple Reinforcement Schedules
A summary of the four basic reinforcement schedules:
Fixed Ratio (FR)
Variable Ratio (VR)
Fixed Interval (FI)
Variable Interval (VI)
Future topics will involve more complex reinforcement schedules.