Arch 371 Practice Management Notes
Course Content
Introduction and Case Study (first lecture)
Key areas of practice management (Lectures 2 – 11):
Professionalism and ethics in architecture.
Client and stakeholder management.
Design management processes.
Architect's role in construction projects.
Building contracts and legal frameworks.
Procurement options and health & safety.
Practice management essentials.
Construction and site-related considerations.
Summary and further Case study (final lecture)
Coursework:
Design report (40%): A comprehensive report detailing a specific design project, focusing on the application of practice management principles.
Final 'in person' 2hr scenario-based exam (60%): An examination involving real-world scenarios to assess understanding and application of course content.
Lecture Schedule
Week 1 (27/1):
Lecture 1 (29.1.25): Case study and Introduction
Presenter: PF
Chapter: 1
Overview of the course and its objectives.
Introduction to the case study that will be used throughout the course.
Week 2 (3/2):
Lecture 2 (5.02.25): Professionalism, Introduce Report
Presenter: PF
Chapter: 1
Guest: Craig Allen, Architect RIBA
Discussion on professionalism in architecture.
Introduction to the design report assignment.
Week 3 (10/2):
Lecture 3 (12.02.25): Clients and stakeholders
Presenter: PF
Chapter: 2
Guest: Andy Murphy, Client, UoL
Understanding the roles and responsibilities of clients and stakeholders.
Effective communication strategies.
Week 4 (17/2):
Lecture 4 (19.02.25): Design Management
Presenter: PF
Chapter: 4
Guest: Paul Parry, QS, Cunliffe
Principles of design management.
RIBA Plan of Work.
Life cycle costs.
Week 5 (24/2):
Lecture 5 (27.02.25): Architect’s Role in Construction
Presenter: PF
Chapter: 4
Guest: Mike Cunningham, Mersey Design Group
Exploring the architect's role in construction.
Responsibilities and liabilities.
Week 6 (3/3):
Lecture 6 (5.03.25): Building Contracts
Presenter: Brook-house
Chapter: 5, 6
Guest: Stephen Brookhouse, University of Westminster
Understanding building contracts.
Standard forms of contract.
Week 7 (10/3):
Lecture 7 (12.03.25): The Legal Framework
Presenter: Dave Watkins
Chapter: 7
Guest: Dave Watkins, Conservation DW Architects
Overview of the legal framework impacting architectural practice.
Planning system and building regulations.
Week 8 (17/3):
Lecture 8 (20.3.25): Procurement options
Presenter: PF
Chapter: 4
Guest: Dave Harding, Contractor UoL
Exploring various procurement options.
Advantages and disadvantages of each method.
Week 9 (24/3):
Lecture 9 (26.03.25): Health and Safety
Presenter: PF
Chapter: 9
Guest: Maria O’Malley, H + S UoL
Health and safety regulations and practices.
CDM Regulations 2015.
Week 10 (31/3):
Lecture 10 (2.4.25): Practice management
Presenter: PF
Chapter: 3
Guest: Adam Hall, Architect FCH
Assignment submission: Thursday 3rd April 2025
Key aspects of practice management.
Forms of trading, fees, and finances.
Easter Break: 3 weeks starting 7/4
Week 11 (28/4):
Lecture 11 (30.4.25): Construction and Site matters
Presenter: PF
Chapter: 10
Guest: Dan Smith, Architect Smith and Young
Construction site matters and quality control.
Claims and dispute resolution.
Week 12 (5/5):
Lecture 12 (7.05.25): Case study and summary
Presenter: PF
Chapter: 10
Final case study analysis.
Course summary and review.
Course Content Details
L2. Professionalism
Architects, professionalism, what it means:
Ethical responsibilities and standards.
RIBA, what it does, codes of conduct:
Role and functions of the Royal Institute of British Architects.
ARB, what it does, codes of conduct:
Role and functions of the Architects Registration Board.
Sustainability, duty to wider society:
Environmental considerations in architectural practice.
BREEAM: Building Research Establishment Environmental Assessment Method.
L3. Clients, Stakeholders, Terms of Appointment, and Communications
Clients, their roles and responsibilities:
Defining client expectations and managing relationships.
Stakeholders:
Identifying and engaging with relevant stakeholders.
Professional Engagement:
Establishing clear terms of appointment.
Communications:
Effective communication strategies within the project team.
L4. Design Management, RIBA Plan of Work, Life Cycle Costs
Design Management:
Managing the design process from inception to completion.
RIBA Plan of Work:
Understanding the RIBA Plan of Work stages.
Costing of Projects:
Methods for cost estimation and control.
Life Cycle costs:
Considering long-term costs in design decisions.
L5. Architects and the Design Team. Copyright and Indemnity Insurance
Architect's role and responsibilities:
Scope of services and professional duties.
The Design Team:
Collaboration and coordination within the design team.
Indemnity Insurance:
Importance of professional indemnity insurance.
Copyright:
Protecting intellectual property rights.
L6. Procurement, Project Management, and Cost Control
Collaborative working:
Benefits of collaborative project delivery.
Procurement options:
Different methods of procurement and their implications.
Project management:
Key project management principles and techniques.
Balancing Programme, Cost, and Quality:
Managing trade-offs between these key factors.
Responsibility and Liability:
Understanding legal and ethical responsibilities.
L7. Health and Safety
Introduction:
Importance of health and safety in construction.
Health and Safety Framework:
Overview of relevant legislation and regulations.
Health and Safety at Work Act:
Key provisions of the Act.
CDM Regulations 2015:
Roles and responsibilities under the CDM Regulations.
Risk assessments:
Conducting and documenting risk assessments.
L8. Contracts
Principles of contract:
Essential elements of a legally binding contract.
Sources of English law: common law, contract law
Why contracts are important:
Minimizing risk and ensuring clarity.
Agreement, Intention, Consideration, Capacity:
Key components of a valid contract.
Standard building contacts: Traditional, D+B:
Types of standard building contracts.
Professional service contracts:
Contracts for architectural services.
L9. The Legal Framework
The LA Planning system, History of legislation
Use classes, NPPF and Local plans:
Understanding land use classifications.
Conservation
Process of submission / determination:
Procedures for planning applications.
Appeals
Building regulations
Approved documents
Fire and life safety
L10. The architect in business
Practice management
Forms of Trading
Fees and Finances
Human Resources and Employment Legislation
Marketing and PR
L11. Construction Site Matters, Quality Control, and Claims
Construction issues, Buildability
Effective specification and detail
Site monitoring and Quality Control
Payments and Valuations
Claims and Dispute resolution
Introduction
Architects have a wide range of professional responsibilities.
RIBA and ARB, codes of conduct.
Society at large, design, and sustainability.
Clients and other stakeholders.
Design Management and life cycle costs.
Administration of Building Contracts and site issues.
Coordinating the Project Design Team.
Health and Safety.
Project Team
Client
Architect
Stakeholder
Cost Consultant
Structural Engineer
Services Engineer
Contractor
Sub Contractor
Specialist Consultant
The Case Study: Library Project
Project for an Education Institution.
Commission was a result of a competition.
Brief followed extensive research.
Consultation with stakeholders.
Design development and Client sign off.
Planning and Building Regulations approval.
Procurement options and obtaining competitive quotations.
Managing the construction contract.
Handover to Client.
RIBA Work Stages
Stage 0 – Strategic definition
Stage 1 – Preparation and Brief
Stage 2 – Concept design
Stage 3 – Developed Design
Stage 4 – Technical Design
Stage 5 – Construction
Stage 5 – Handover
Stage 6 – In use
Stage 0 – Strategic Definition
The University considered that its existing Library was dated.
Wanted a non-institutional “learning café”.
Had asked one firm of architects, but results were uninspiring.
Decided to have a limited competition with 6 architects.
Put together a very preliminary brief, including budget.
Provided a site.
DGC were included because of their previous involvement.
Architects must check if a previous firm has been involved.
There are recommended codes for Clients to run competitions.
Briefs can be very vague to start with.
DGC had continued with marketing to keep them in mind.
Stage 1 – Preparation and Brief
DGC receive a short letter notifying of success at competition.
Now need to agree a fee / schedule of service.
Standard RIBA appointment templates – Programme/Fee/Quality
Still at feasibility stage, so separate fee.
Because the brief is ill-defined, it is difficult to give a firm fee and service proposal.
Agree who we should speak to.
Communication is an important part of an Architect's role.
Review aspirations with key personnel.
Put together an Initial Project Brief.
Advise what site surveys are needed.
Site conditions may have a big bearing on cost and viability.
Advise if other consultants are needed at this stage.
Cost advice, structural viability, Services infrastructure.
Stage 2 – Concept design
Brief / scope / budget / quality are all now defined.
Possible to move on to Outline Proposals.
Broadly in line with budget and brief – obtain feedback from stakeholders.
Structural and Services strategy.
In line with Client aspirations and sustainability requirements.
Outline specifications.
Design Programme.
May discuss procurement options at this early stage.
Project strategies.
Finalise Architects service and Fee agreement.
Now scope of project is properly defined.
Confirm appointment of other consultants.
May need a responsibility matrix.
Stage 3 – Developed design
Now that the concept design is agreed, move forward to Developed design – i.e., “signed off”.
Coordinated set of proposals for structure, building services with KPIs agreed.
Requires other consultants' input and Client involvement.
Outline specification to allow more detailed cost check.
Cost is often the deciding factor – Clients have limited budgets!
Submit Planning application.
In line with Pre-app discussions.
Review procurement options to allow a clear Project Strategy and design programme.
May choose to involve a Contractor at this early stage.
More detailed research and development.
Review health and safety.
Because this may have a fundamental effect upon the design.
Stage 4 – Technical design
Prepare the technical design.
Everything needed to allow the contractor to construct the building.
Input from Structural / Services / IT / Landscape specialists.
Coordination is one of the architect's most important roles.
Input from specialist suppliers and sub-contractors.
Submit a Building Regulations application.
Review operational and maintenance issues with the Client.
To ensure that the building can be used as the architects intend.
Decide upon details of procurement, tender, and prospective contractors.
The Client has a big say in this.
Prepare pre-tender Health and Safety information.
(This project was a traditionally procured job)
Stage 5 – Construction
Review tenders received and prepare a report for the Client.
Like for like basis – then Client decides.
Decide upon which contractor offers the best value.
Form a contract.
Set up a pre-start meeting.
Agree key issues and procedures for communication.
Allow for mobilization.
(the contractor has to set up their own domestic contracts).
Agree “site rules”.
Communicate the programme to Client.
To ensure a smooth interface and minimize disruption.
Administer the Building contract.
Periodic site visits.
To check progress, quality, and resolve any queries.
Stage 6 – Handover and Close out
At practical completion, hand over the building to the Client.
This is an important point in the process.
Carry out commissioning and testing.
To ensure all KPIs are met.
Provide operational manuals and tutorials as required.
To ensure the Clients understand how to use the building.
Ensure Building Control is satisfied.
Minor issues can make it illegal to use the building.
Agree on a final account.
This can be contentious with the Client if there are many extras.
Issue a final certificate.
Stage 7 – In use
Post occupancy evaluation.
This may form part of the original architect's appointment.
Feedback to the client on the performance of the building.
To see how the building actually works.
Research and Development (for Client or Architects Practice).
To learn for the future.
Summary
Define commission and level of professional service
Put a design team together and then communicate effectively
Establish the brief and the Clients criteria
Obtain statutory approvals (Planning & Building Regulations)
Put technical drawings and other information together
Decide on a procurement route, obtain tenders
Administer the building contract
Deal with valuations
Issue practical completion certificate
Key takeaway
It's a team effort!
Reading
Professional Studies in Architecture, Stephen Brookhouse, RIBA Publications. Ch 1, pages 1 - 7