Project Management CAPM

1/12 CAPM TRAINING 1-2

  • Predictive versus Adaptive

    • Predictive: predicting what’s going to happen

    • Adaptive: iterative, completed in increments

    • Scrum: Everyone comes together with a shared goal to get to the finish line (connects to Rugby)

    • Waterfall Model(Predictive):

      • Conception

      • Initiation

      • Analysis

      • Design

      • Construction

      • Testing

      • Deployment

      • It’s sequential

    • Agile(Adaptive):

      • Same thing but it doesn’t “fall” through the stages like the waterfall does

      • It is more of a loop, constantly reevaluating what is on the back log


S2, Part 5: Project, Program, Portfolio

  • Portfolio: collection of work, strategic alignment, broad scope

  • Program: multiple projects, common objective, larger scope

  • Project: temporary, specific goal, deliverables



S2, PART 6: PROJECTS VS OPERATIONS

  • Projects: temporary, unique, have a start and end, defined budget

  • Operations: NOT temporary, indefinite, ongoing activities


S2, PART 8: P.M. LIFE CYCLE

IPECC

  • Initiating

    • Set up goals, expectations, and scope of the project

  • Planning

    • Develop a specific plan for the tasks and activities to be completed, including schedule and budget

  • Executing

    • Carry out the plan

  • Controlling

    • Respond to changes, adjust the schedule, goals, and expectations as needed

  • Closing

    • Deliver the final project and assess the project and the process

Any documentation of the project is called a project artifact


S2 PART 9: ISSUES, RISKS, ASSUMPTIONS, CONSTRAINTS

  • Risks: uncertain event, scales of probability and impact

    • Pure risk: someone could get hurt, always negative

    • Business risk: loss of ROI, time or cost savings, could be positive or negative

      • Kind of related to sports betting, you spend money on a bet and you could win or lose

  • Issues: a risk that has already happened, issue log, issue owner, etc.

  • Assumptions: believe to be true, not proven to be true

  • Constraints: anything that limits your options


S2, PART 10: PROJECT SCOPE

  • Scope: defines boundaries of a project, outlines what’s included and excluded

    • Project scope and project quality go hand-in-hand

    • Customer defines quality

      • When scope becomes bigger it is called scope creep


S2, PART 11: P.M. PROCESSES

Project _____ Management

  • Schedule

  • Cost

  • Quality

  • Resource

  • Communications

  • Risk

  • Procurement

  • Stakeholder

  • (49 total processes)


S2, PART 12: ETHICS

  • Project managers are committed to doing what’s right and honorable

  • Aspirational versus mandatory conduct

    • Mandatory conduct comes from the law


CAPM SECTION 3

Project Management Lifecycle

  • IPECC

    • Initiating

    • Planning

    • Executing

    • Monitoring/Controlling

    • Closing


Iron Triangle

FINAL QUESTION ^^^

  • Waterfall

    • Building a house

    • Fixed scope in that you have to finish the house

    • Time and resources are not easily determined or predicted

  • Agile

    • Think of an ice cream cone

    • Don’t put the sprinkles first

    • Most important things first and them see if you can fit the less important things


QUALITY IN PM

  • Quality is defined as:

    • “conformance to requirements”

    • “fit for use” or “fitness for use”

    • Totality of an entity, satisfies needed abilities, stated or implied needs

  • Don’t confuse quality with grade

    • Quality processes:

      • Quality planning

      • Quality assurance about prevention

      • Quality control about inspecting afterwards to prevent “escape defects”

  • You have to “build in” quality

  • PMI theme - Quality requires:

    • A plan

    • Implementation

    • Measurement

    • Reaction

    • Documentation

  • DOD: Definition of Done

  • A plan - Standards, objectives, roles and responsibilities, processes, tools, how to deal with non-conformance

  • Metrics - to verify conformance — cost performance, customer satisfaction, failure rate

  • Managing quality - executing processes through quality assurance and control

  • Quality Assurance and Control - before the customer sees the product, after the customer sees the work — scope validation

  • Quality audit


TYPES OF QUALITY COSTS

  • Cost of conformance to requirements

    • Safety measures

    • Team development and training

    • Proper materials and processes

  • Cost of non-conformance to requirements (a cost/burden to the organization)

    • Liabilities

    • Rework/scrap

    • Lost business


QUALITY METRICS

  • Examples:

    • % of tasks completed on time

    • Cost performance

    • Failure rate

    • # defects identified per day

    • Total downtime per month

    • Errors found per line of code

    • Customer satisfaction scores


DESIGN FOR EXCELLENCE (DFX)

Design for X — Excellence

  • X is usually a variable that the project is trying to address


SAMPLING TYPES

  • Attribute Sampling- binary: Is this a defect? Yes or no

  • Variable sampling- how big of a defect is this?



CHECK SHEET

  • Issue with this is that there isn’t digitization and it’s not specific enough


PARETO DIAGRAM

  • The line above shows what percentage the number indicates from the quality issues


ISHIKAWA/FISHBONE DIAGRAM


HISTOGRAM


RUN CHART


2/9

CAPM TRAINING SECTION 8


THROUGHPUT

  • The units to be produced over time

  • How it’s all connected


CRITICAL CHAIN

  • Pareto principle - throughput

  • Cost and protect throughput

  • Constraints = 1 or at the most 2

  • difference between feeder and resource buffer = 158 and 159

    • Resource buffer = a person that needs time to do their tasks accordingly

  • Page 162 = we change the way we measure progress, progress is measured from the critical path and how much we have completed

  • Instead of multitasking, implementing focus

  • Page 178 = compete on lead time, not on cost


PREDICTIVE PLAN SCHEDULE

  • Key question - when can this be done?

  • Progressive elaboration - from general idea to specific plan

  • Goals

    • Task and milestone start dates and end dates

    • Dependencies between tasks - predecessors and successors

    • Allocate resources effectively - to complete tasks

    • Ensure the project stays on track

CRITICAL PATH

  • The longest path through a project

  • The least amount of float or flexibility

  • Steps

    • Define the project tasks

    • Estimate the duration of each task

    • Identify the dependencies between each task

    • Draw the project network diagram

    • Monitor progress and adjust the plan as needed


SECTION 8

  • In a project management plan, what is the purpose of the schedule?
    Correct answer: To outline the specific tasks, milestones, and deadlines for completing the project

  • Which of the following best describes the application of the critical path method (CPM)?
    Correct answer: A technique for identifying the sequence of project tasks that must be completed on time in order for the project to be completed on schedule

  • Which of the following tasks is considered to be a defining task in project management?
    Correct answer: Managing and allocating project resources

  • Which of the following methods is considered to be the most accurate for estimating the duration of tasks in project management?
    Correct answer: Bottom-up estimation

  • Which of the following is NOT a tool or technique used for identifying dependencies between tasks in project management?
    Correct answer: Surveying team members

  • Which of the following is NOT a characteristic of the critical path?
    Correct answer: It is the shortest path through the project network

  • Schedule Variance (SV) is calculated by:
    Correct answer: Subtracting the planned value from the earned value (EV − PV)

  • In a Work Breakdown Structure (WBS), what is the lowest level of the hierarchy referred to as?
    Correct answer: Work package

  • Which of the following is NOT a key component of a quality management plan?
    Correct answer: Employee training program

  • Which of the following is NOT a key responsibility of the project manager regarding integration management?
    Correct answer: Managing the project team's performance evaluations


SECTION 9


MINIMUM VIABLE PRODUCT

  • Minimum: the most rudimentary, bare-bones foundation of the solution possible

  • Viable: sufficient enough for early adopters

  • Product: something tangible customers can touch and feel


PROJECT CONTROL IN PREDICTIVE PROJECTS

  • Need to monitor and control 5 things:

    • Iron Triangle:

      • Scope

      • Time

      • Cost

    • Also:

      • Quality

      • Risk


COST VARIANCE AND EARNED VALUE MANAGEMENT

  • Cost variance: compare actual to planned (video to say this backwards)

    • Positive - actual < planned

    • Negative - actual > planned

  • EVM (Earned Value Management) is a big subject

    • Addresses cost and schedule


BAC - budget at completion

EAC - estimate at completion



SECTIONS 12-13

  • Information radiator

    • Where stakeholders go to see how everything is doing

      • Interactive dashboard

  • Story points

    • On burndown chart

    • How much is completed and how much is left

    • Addressing stakeholders wants and needs

  • Backlog

    • Looking to complete the highest priorities on the backlog

  • Project controls

    • Monitor risks

  • Who should lead scrum meetings

    • different team members on rotation