Transfer Plan
Transfer Plan Overview
The transfer plan serves as:
A risk assessment tool
A supplement to the declaration of inspection
Guidelines for the Transfer Plan
A Kirby transfer plan:
Must be generated for all cargo transfers.
Requires signatures from:
PIC (Person In Charge)
Towing vessel watch officer
Shore side supervisor
Review cargo transfer orders with the dock operator's transfer paperwork.
Order Verification
Confirm that orders match up.
If discrepancies are found:
Exercise Stop Work Responsibility (SWR)
Report to the officer on watch or supervisor.
Supplemental Documents Included in the Transfer Plan
Barge transfer procedures
Cargo orders
Declaration of inspection
Safety data sheet (SDS)
Heating orders
Inspector survey report
Declaration of security
Product transfer document
Emergency Considerations
After reviewing the SDS, identify necessary personnel protection in case of an accidental release or spill, including:
Personal Protective Equipment (PPE)
Provisions for shelter in place
Evacuation guidelines
Discuss and document emergency shutdown procedures for:
Loss of dock communications
Cargo hose failure
Barge breakaway
Document the radio working channel and establish backup communications with the dock.
Implementation of the Kirby Transfer Plan
Review each segment of the plan during:
Pre-transfer conference
Discuss with the dock operator:
Develop a risk management plan
Address unresolved areas of concern:
Exercise Stop Work Responsibility if necessary
Clarify specific instructions or precautions related to cargo operations, such as:
Vapor pressure limits
Active shore tank
Type of line clear
Ballast considerations
Plan for cargo stops
Cargo Top-Off Execution
Identify execution methods for cargo top off, including:
Top off paddle
GP paddle
Draft gauge
Stop gauge
Retain completed transfer plans on the barge during transfer operations along with all supplemental documents.
Ensure a copy of the transfer plan is present on each barge for tandem transfers.