Earthquake case studies

Haiti 2010

  • Basic info

    • LIC

    • Caribbean and North American plate- transform boundary

    • 7.3 magnitude earthquake

    • Epicentre near the town of Léogǎne, approximately 25km from Port-au-prince

  • Causes

    • Situated at the Northern end of the Caribbean plate on a transform plate boundary with the North American plate. The North American plate is moving west, and there is friction between the two. Pressure between the two built up, and was released as an earthquake

  • Impacts

    • Primary

      • 1.5 million made homeless

      • 300,000 killed

      • Massive destruction of homes and commercial buildings- 50% of government buildings

      • Main port severely damaged and key roads blocked

      • Widespread destruction of water pipes, electricity cables and communication systems

    • Secondary

      • Outbreak of cholera- 6000 killed

      • Huge refugee flow

      • Over 2 million lacked access to food and water

      • Widespread looting, increased violent crime and 60% increase in unemployment

      • Approximately 600,000 left port-au-prince for other areas

  • Responses

    • Immediate

      • Very little money raised actually made it to Haiti

      • Temporary hospitals established

      • Distribution of bottled water, food and emergency tents

    • Long term

      • 110,000 cubic meters of rubble removed from canals

      • Cash-for-work programmes established


Indian Ocean tsunami- Boxing Day 2004

  • Basic info

    • Magnitude 9.2 earthquake undersea, displacing 30³km of water and causing waved up to 30m high

    • Indo-Australian and Eurasian plate- convergent

    • Affected 14 countries, including Indonesia, Sri Lanka and Thailand

  • Causes

    • Caused by a rupture along the fault boundary between the Burma plate and the Indian plate

  • Impacts

    • Primary

      • Tsunami- waves up to 30m high, travelling at 500mph

      • 230,000 killed

      • Coastal communities, buildings and infrastructure obliterated

      • Seabed rose by up to 15 meters

    • Secondary

      • Over 1.7 million displaced

      • Rotting corpses and lack of sanitation created disease

      • Fishing industry and tourism destroyed

      • Saltwater contaminated fresh water supplies and agricultural land

      • Long term trauma to locals

  • Responses

    • Immediate

      • Emergency aid

      • Local workers paid through cash-for-work systems to remove debris

    • Long term

      • Establishment of the Indian Ocean tsunami early warning system in 2006

      • Development of stronger building codes and community based hazard education


Christchurch 2011

  • Basic info

    • 10km west of Christchurch

    • Lasted 10 seconds

    • Measured 6.3 on the Richter scale

    • 4.99km deep

  • Causes

    • Earthquake occurred on a conservative margin between the Pacific plate and the Australasian plate

  • Impacts

    • Primary

      • 185 people killed

      • 3129 people injured

      • 6800 received minor injuries

      • 100,000 properties damaged

      • Water and sewage pipes damaged

      • The cathedral spire collapsed

      • Liquefaction destroyed many roads and buildings

      • 2200 forced to live in temporary housing

    • Secondary

      • 5 rugby World Cup matches cancelled

      • Schools closed for 2 weeks

      • 1/5 of the population were closed for a long time

      • 2 large aftershocks

      • Economists suggest it will take 50-100 years for New Zealand’s economy to recover

  • Responses

    • Immediate

      • Specialised search and rescue teams brought in, alongside 300 Australian police

      • Central business district cordoned off to ensure safety, remaining closed until 2013

    • Long term

      • Canterbury earthquake recovery authority (CERA) formed to manage the rebuilding process into zones to assess damage

      • Christchurch divided into zones to assess damage

      • 10,000 new affordable homes built

      • Mental health support provided

      • Government provided funding for rebuilding


Fukushima 2011

  • Basic info

    • March 11

    • Measured 9.0 on the Richter scale

    • Struck off Japan’s northeast coast, about 250 miles From Tokyo at a depth of 20 miles

  • Causes

    • The Eurasian plate is subducted by the pacific plate, forming a subduction zone to the east of Japan. Friction built up over time, causing a ‘megathrust’ earthquake. Scientists discovered a thin, slippery clay layer lining the fault, which allowed the two plates to slide 50 meters, causing the earthquakes and tsunami

  • Impacts

    • Primary

      • 16,000 died

      • 4.4 million households left without electricity

      • Transport networks disrupted

      • Land subsidence of more than 50cm in areas

      • Moved the earths axis between 10 and 25 cm

      • Liquefaction damaged 1,000 buildings

    • Secondary

      • Cost of $235 billion USD

      • Waves of up to 40m up to 6 miles inland

      • Seven reactors at the Fukushima nuclear power station experienced a meltdown, resulting in radiation levels over 8 times normal levels

  • Responses

    • Immediate

      • Tsunami warnings issued 3 minutes after the earthquake

      • 100,000 members of the Japan self-defence force dispatched for search and rescue operations

      • 20km evacuation zone around the power station

    • Long term

      • Budget of 23 trillion yen to rebuild over 10 years

      • By 24th March, 375 km of the Tohoku expressway repaired

      • Central government enacted the ‘act on the development of tsunami resilient communities’