Building Development Process Study Notes

Building Development Process

Overview of the Course

  • Understanding the building development process is pivotal in mastering the fundamentals of architecture and construction.

  • The course aims to:
      - Define residential buildings and their physical elements.
      - Identify key stakeholders and their roles in development.
      - Discuss parameters influencing building design.
      - Explain the construction sequence.

Class 1 Buildings

  • Definition: Houses or dwellings of a domestic or residential nature, either single or horizontally attached (e.g., terrace houses, townhouses).

  • Two subclasses:
      - Class 1a: A single dwelling, detached or attached (townhouse, etc.).
      - Class 1b: Boarding house/guest house/hostel with less than 300 m² floor area and ordinarily having less than 12 occupants.

Historical Context of Residential Building in Australia

Key Historical Periods
  1. Pre 1800s (Colonial Era)
       - Characterized by crime and poverty.
       - Convict labor was used for construction, relying on local natural materials (timber, stone, mud brick).
       - Common features: fireplaces for cooking/heating, basic government or institutional buildings.

  2. 1800s (Early to Late Victorian)
       - Influenced by the gold rush.
       - Ornate cast iron columns, front porches, and covered verandahs.
       - Use of heavy ornamentation, brick patterning, colored glass.
       - Emergence of terrace houses and notable architectural styles.

  3. 1890 to 1915 (Federation Period)
       - Developments catered to the economic conditions; houses built where jobs were located (e.g., Brisbane along the river).
       - Queenslander houses emerged, featured high-set designs to reduce flood risk.
       - Utilized wide wrap-around verandas, lightweight materials, and fire adaptability.

  4. 1915 to 1940s (Inter-war Period)
       - Impact of the Great Depression leading to simplicity in housing styles (plain brickwork).
       - Introduction of Californian Bungalow styles with basic fittings, small verandahs, sometimes fibro walls.

  5. 1950s to 1970s (Modern Era)
       - Post-war construction reflected baby boomer needs.
       - Dominance of double brick as a building material.
       - Rise of project homes and mass production in construction.

  6. 1970s to 2000 (Federation Revival)
       - Focus on developers and sustainability with a revival of older styles in contemporary settings.
       - Slab floors and brick veneer became popular.

  7. 2000 to Present (Contemporary Period)
       - Significant push towards incorporating sustainable designs.
       - Shift from basic structures to environmentally sustainable designs.
       - Increase in average home sizes leading to greater resource use.

Essential Elements of Building Design

Key Factors Influencing Design
  • Site Conditions: Critical to the building's development process:
      - Location (orientation, prevailing breezes, views)
      - Lot size and slope
      - Existing vegetation
      - Access and services available

  • Purpose of Building: Functional features including the number of rooms, layout, and amenities.

  • Legal Design Considerations: Compliance with Australian laws and standards, zoning, easements, and environmental controls.

  • Strength & Stability: Buildings must withstand:
      - Dead Loads: Weight of the structure itself.
      - Live Loads: Weight from occupants and furniture.
      - Environmental Loads: Effects from external forces (wind, snow, earthquakes).

Construction Process Elements
  1. Site Preparation

  2. Foundation Work

  3. Framing

  4. Enclosure (walls, roof)

  5. Services Installation (plumbing, electrical)

  6. Interior Finishes

  7. Final Inspection and Handover

Key Stakeholders in Building Development

  • Stakeholders can have a significant role in the success of a construction project:
      - Building Owner / Client: The primary stakeholder focused on living space design.
      - Architect: Responsible for design and documentation.
      - Engineers: Civil, structural, services, landscape, mechanical engineers hold specific roles throughout the project.
      - Contractors: Builders and tradespeople involved directly in the construction phase.

  • Importance of an integrated project team for effective communication and collaboration throughout project development.

Stakeholder Roles and Responsibilities

  • Client: Defines what they need/want from a building (privacy, space layout).

  • Architect: Develops design briefs, prepares working drawings and specifications required for approvals.

  • Engineers: Provide expertise regarding stability, safety, legal codes, and other technical aspects.

  • Construction Team: Manages procurement, labor, quality control, and adherence to timelines.

Building Design Considerations

  • Thermal Comfort: Achieved through careful design ensuring adequate insulation, natural ventilation, and orientation. Important factors include:
      - Air Temperature
      - Humidity
      - Air Velocity/Climatic influence

  • Aesthetic Appeal: Influenced by materials, designs, and the surrounding environment. Factors affecting aesthetics include construction methods, adjacent properties, and climatic considerations.

Lifespan and Durability
  • Buildings must account for eventual deterioration due to:
      - Use and maintenance
      - Environmental factors (heat, rain, wear)

  • Regular checks should be performed to mitigate risks of structural damage over time.

Definitions and Terminology

  • Footings: Base of foundation distributing the building load.

  • Cladding: Exterior covering for walls to protect against elements.

  • R-value: A measure of thermal resistance of insulation; higher values reflect better performance.

  • HVAC: Heating, Ventilation, and Air Conditioning systems critical for maintaining internal climates.

Conclusion

  • The notes provide an exhaustive overview of the residential building construction process, historical development in Australia, roles of stakeholders, and essential design considerations. Understanding these elements is crucial for comprehending the complexity of building systems and processes.