Jennifer Garcia Reyes: Comprehensive Guide to Groundwater Flow Net Construction

Overview of Groundwater Flow Net Construction

  • The primary objective of the material provided by Jennifer Garcia Reyes is to demonstrate the methodology for constructing a groundwater flow net using head elevation data from monitoring wells.
  • The process involves horizontal and vertical spatial analysis to determine the direction and intensity of groundwater movement based on hydraulic head measurements.
  • The documents provided are designated as Page 4 of 5 and Page 5 of 5, with a revision date of 12/2018.

Theoretical Foundation of Flow Net Contouring

  • Flow nets represent lines of equal hydraulic head (equipotential lines) and the pathways of water movement (flow lines).
  • Equipotential Lines: These are the primary focus of the graphical exercise. They represent contours where the total hydraulic head is constant.
  • Linear Interpolation: To draw these contours between discrete data points (wells), linear interpolation is used. This assumes a constant gradient between any two points of measurement.
  • Calculation Principle: The location of a specific head value HtargetH_{target} between two points H1H_{1} and H2H_{2} is determined by the ratio of their differences in elevation relative to the physical distance between the points.

Detailed Analysis of Figure 1: Four-Well Interpolation Example

  • Figure 1 provides a practical demonstration of finding contour points between four established monitoring wells with the following head elevations:

    • Well A: 64 ft64\,\text{ft}
    • Well B: 81 ft81\,\text{ft}
    • Well C: 73 ft73\,\text{ft}
    • Well D: 63 ft63\,\text{ft}
  • Target Contour Intervals: The exercise aims to plot contours for every 5 ft5\,\text{ft} increment, specifically the 65 ft65\,\text{ft}, 70 ft70\,\text{ft}, 75 ft75\,\text{ft}, and 80 ft80\,\text{ft} levels.

  • Interpolation between Well B (81 ft81\,\text{ft}) and Well A (64 ft64\,\text{ft}):

    • Total head difference: 81 ft−64 ft=17 ft81\,\text{ft} - 64\,\text{ft} = 17\,\text{ft}.
    • The following contours pass between these points:
      • 80 ft80\,\text{ft}
      • 75 ft75\,\text{ft}
      • 70 ft70\,\text{ft}
      • 65 ft65\,\text{ft}
  • Interpolation between Well B (81 ft81\,\text{ft}) and Well C (73 ft73\,\text{ft}):

    • Total head difference: 81 ft−73 ft=8 ft81\,\text{ft} - 73\,\text{ft} = 8\,\text{ft}.
    • The following contours pass between these points:
      • 80 ft80\,\text{ft}
      • 75 ft75\,\text{ft}
  • Interpolation between Well D (63 ft63\,\text{ft}) and Well C (73 ft73\,\text{ft}):

    • Total head difference: 73 ft−63 ft=10 ft73\,\text{ft} - 63\,\text{ft} = 10\,\text{ft}.
    • The following contours pass between these points:
      • 65 ft65\,\text{ft}
      • 70 ft70\,\text{ft}
  • Interpolation between Well D (63 ft63\,\text{ft}) and Well A (64 ft64\,\text{ft}):

    • Total head difference: 64 ft−63 ft=1 ft64\,\text{ft} - 63\,\text{ft} = 1\,\text{ft}.
    • No whole 5 ft5\,\text{ft} interval contours cross this line.

Site Study: Arsenic Springs and Clearwater Pond (Figure 2)

  • Figure 2 applies the flow net principles to a larger field site containing 14 monitoring wells (labeled B-1 through B-14) and two distinct surface water features: Arsenic Springs and Clearwater Pond.

  • Monitoring Well Elevation Data (Head Measurements):

    • B-1: 172172
    • B-2: 178178
    • B-3: 162162
    • B-4: 168168
    • B-5: 166166
    • B-6: 181181
    • B-7: No value explicitly labeled in the provided view.
    • B-8: No value explicitly labeled in the provided view.
    • B-9: 176176
    • B-10: 177177
    • B-11: 171171
    • B-12: 160160
    • B-14: 173173
    • Another labeled point near the bottom of the map shows an elevation of 168168 (attributed to B-13).
  • Geographic Context:

    • Arsenic Springs: Located in the northwestern portion of the map, adjacent to well B-6 (181181) and B-2 (178178).
    • Clearwater Pond: Located centrally, surrounded by wells B-14 (173173), B-10 (177177), B-1 (172172), and B-4 (168168).
    • Orientation: A North arrow (N) is provided to orient the site layout.

Methodology for Drawing Contours on a Field Map

  • Step 1: Data Plotting: Plot all recorded hydraulic head values from the monitoring wells on the site map.
  • Step 2: Selecting Interpolation Pairs: Identify adjacent wells between which contours must be drawn. Choosing pairs based on proximity is essential for accuracy.
  • Step 3: Calculating Fractional Distances: Use the elevation difference to determine where the target contour (e.g., 170170, 175175, 180180) should lie along the line connecting two wells.
    • If well XX is 172172 and well YY is 168168, the 170170 contour will be exactly at the midpoint of the line segment connecting them.
  • Step 4: Connecting the Points: Connect the interpolated points of equal value with smooth, curved lines (equipotential lines). These lines should never cross each other.
  • Step 5: Establishing Flow Direction: While not explicitly shown in Figure 2, the next logical step in a flow net is to draw flow lines perpendicular to these equipotential lines, moving from high head to low head (e.g., from Arsenic Springs toward the southern portion of the map).