Excavations and Backfilling Works Notes
Specifications for Excavations and Backfilling Works
General Overview:
The document provides guidelines for excavations and backfilling works based on standard specifications from the Ministry of Public Works and Housing (1996).
Includes civil, architectural, mechanical, and electrical works.
The Bill of Quantities (BOQ) outlines standard quantities for these works.
General Specifications:
Specified works include site cleaning prior to excavation, rubbish removal, and removal of unwanted trees.
The site must be free of obstacles to ensure smooth operations.
Bill of Quantities (BOQ) Details:
Excavation work prices must include removal of buried structures and surplus material.
Quantities must be based on elements' dimensions specified in drawings.
Specific types of soil (clean sand or kurkar) must be used for backfilling, with compaction tests conducted.
Excavation Parameters
Types of Soil:
Excavation can include various soil types as specified in drawings, e.g.
1.1 Excavation of any soil type in cubic meters (M³) with required works.
1.2 Backfilling approved excavated material to maintain levels.
1.3 Use of imported clean sand material for backfilling (M³).
Filling Requirements:
Filling operations must only commence after obtaining written permission from the engineer.
Materials must be free of rubbish and organic substances.
Each filling layer must not exceed 25 cm, and proper compaction must be ensured.
Related Issues
Rocks and Solid Ground Layers:
Specialized tools should be employed for accuracy and safety.
Activities may need engineer approval if blasting is involved.
Agricultural Soil:
Contractor may have to handle agricultural layers and keep them for landscaping purposes at no extra cost.
Site Leveling:
Essential for preparing foundations and should not incur extra costs.
Site Management
Safety Precautions:
Regular checks of excavation sites for stability.
Ensure safe access and means to prevent collapse.
Excavation Safety Key Points:
Avoid underground utilities and ensure safe digging practices.
Check excavation stability daily before work.
Excavation Equipment
Hand Tools:
Spade, shovel, hoe, trowel, rake, pickaxe, mattock for smaller depths.
Machinery Tools:
Tracked and wheeled excavators, bulldozers, chain trenchers for larger depths.
Equipment includes dragline excavators, front-end loaders, and dump trucks.
Safety Procedures
Contractor’s responsibility includes securing the site from collapses and handling damages to adjacent structures.
Contractors must correct any damages caused without financial compensation from the employer.
Quantity Surveying
All excavation quantities calculated based on proper principles.
Volumes calculated from planned areas and vertical heights from excavation bases.
This document serves as a comprehensive guide on the processes, responsibilities, and specifications related to excavations and backfilling works ensuring that all parties adhere to standards while managing site activities effectively.