Notes on the Project Dossier: Risk Evaluation Using the 8D Approach at YAZAKI
Context of the Project
University: Sidi Mohammed Ben Abdellah, Faculty of Science and Technology
Master's Thesis Title: Evaluation of Component Risks through the Adoption of the 8D Approach
Summary: Conducted at YAZAKI TANGER to identify and analyze potential risks associated with wiring components to minimize quality issues.
Introduction to YAZAKI and the Project
YAZAKI Corporation: Global leader in automotive wiring and components, established in Japan in 1929.
YAZAKI Morocco: Established a production unit in Tangier in 2000 focused on automotive wiring.
Project Objective: Evaluate risks associated with components to enhance product quality using the 8D methodology which addresses root causes of issues.
8D Methodology Overview
8D Stages:
Action 1: Prepare the 8D Process - Form an interdisciplinary team.
Action 2: Describe the Problem - Clearly state the problem and its impact.
Action 3: Implement Immediate Actions - Contain the problem temporarily.
Action 4: Identify Root Causes - Utilize tools like the Ishikawa Diagram and AMDEC.
Action 5: Validate Permanent Solutions - Ensure solutions address the root causes effectively.
Action 6: Implement Corrective Actions - Develop a plan for execution.
Action 7: Prevent Recurrence - Standardize effective solutions.
Action 8: Recognize Team Efforts - Acknowledge contributions to motivate stakeholders.
Risk Evaluation Process
Diagnostic and Problematic Identification: Use historical data to classify observed anomalies in component risks, employing analysis tools such as Pareto diagrams for prioritization.
Root Cause Identification: Implement Ishikawa diagrams and AMDEC to analyze and validate different potential causes of components' issues.
Common Risks Identified
Material Shortages: Caused by supplier errors or production misalignment.
Excessive Material: Can be attributed to supplier issues as well, creating discrepancies in component quality.
Deformation: Occurs from improper handling or faulty production processes.
Non-Functional Relays: Cannot be detected until later stages and lead to significant quality issues.
Missing Parts: Introduced mainly during the assembly phase under high-pressure environments.
AMDEC: Failure Mode and Effects Analysis
Purpose: Identify and evaluate potential failures in components, assessing their impact and detection chances to improve overall reliability.
Process:
Assess each mode of failure based on occurrence frequency, non-detection probability, and severity affecting production.
Create a risk priority number (RPN) by multiplying these three factors (RPN = Occurrence x Severity x Detection).
Corrective and preventive actions
Corrective Action Examples:
Improved inspections of components.
Enhanced storage procedures to prevent damage.
Continuous monitoring of supplier deliveries for critical components.
Preventive Measures:
Implement standardized operating procedures for all phases from storage to production.
Develop training programs focusing on quality checks and problem resolution techniques for operators and staff.
Conclusion
Expected Outcomes: The project aims to create a systematic approach to evaluate and mitigate risks in component quality that supports YAZAKI's mission to maintain high standards in their production.
Methodology Impact: The adoption of the 8D methodology has been instrumental in understanding and resolving issues comprehensively, thereby enhancing the overall operational quality.
en francais