core capability-a unique set of skills that confers competitive advantages to a firm, because rival firms cannot easily duplicate them.
customer management-the management of the customer interface, including all aspects of order processing and fulfillment.
customers-parties that use or consume the products of operations management processes.
dematerialization-the process of transforming a tangible good into an intangible product or service, through digitization or direct service replacement.
echelon-a downstream stage of supply or consumption.
lean operation-an operation that produces maximum levels of efficiency and effectiveness using a minimal amount of resources.
logistics management-management of the movement and storage of materials at lowest cost while still meeting customers’ requirements.
operational planning-a type of planning that establishes short-term priorities and schedules to guide operational resource allocations
operations management-the management of processes used to design, supply, produce, and deliver valuable goods and services to customers.
process-a system of activities that transforms inputs into valuable outputs.
stakeholders-groups of people who have financial or other interest in the well being of an operation.
strategic planning-a type of planning that addresses long term decisions that define the operations objectives and capabilities for the firm and its partners.
suppliers-parties that provide inputs to operational processes.
supply chain-the global network of organizations and activities involved in deigning, transforming, consuming, and disposing of goods and services.
supply chain management-the design and execution of relationships and flows that connect the parties and processes across a supply chain.
supply management-the identification, acquisition, positioning, and management of resources and capabilities that a firm needs to attain its strategic objectives.
tactical planning-a type of planning that addresses intermediate-term decisions to target aggregate product demands and to establish how operational capacities will be used to meet them.
tier-an upstream stage of supply.
total product experience-all the goods and services that are combined to define a customer’s complete consumption experience.
what are the three types of supply chain planning?-strategic, tactical, and operational planning (in order of longest to shortest term)
operations management deals with the effective and efficient management of transformational processes. what are the four major functional activities that this encompasses?-customer, internal operations, logistics, and supply management
who are the three major partners, outside the firm, that are involved in operations management?-customers, suppliers, and stakeholders
what is the difference between operations management and supply chain management?-Operations activities take place in various functional and geographic locations across a supply chain network and operations management is mainly about managing processes. the supply chain has grown to become a dominant way to look at operations management, but supply chain management is mainly about managing flows and relationships.
analytics-the application of sophisticated operations research techniques to big data with the goal of identifying, interpreting, and communicating meaningful patterns in the data.
big data-large data sets generated by technologies such as social media and the Internet of Things. big data are often paired with predictive analytics or other similar analytical procedures.
business model-the combination of the choices determining the customers an SBU will target, the value propositions it will offer, and the supply chain/operations management capabilities it will employ.
business unit strategy-determines how a strategic business unit will compete.
capabilities-unique and superior operational abilities that stem from the routines, skills, and processes that the firm develops and uses.
corporate strategy-determines the overall mission of the firm and the types of businesses that the firm wants to be in.
cost-the expenses incurred in acquiring and using a product.
cyber security-the protection of firms and their systems from theft of data and intellectual property, the alteration of data, and the impairment or denial of process control.
ESG (environmental, social, and governance)-a set of criteria for an organization’s operations that socially conscious investors can apply to assess how well the organization is performing on various socially important dimensions.
fit-the extent to which there is alignment between the firm’s operational capabilities, its value proposition, and the desires of its critical customers.
flexibility-an operation’s ability to respond efficiently to changes in products, processes (including supply chain relationships), and competitive environments.
functional strategy-determines how the function will support the overall business unit strategy.
innovation-both radical and incremental changes in processes and products.
Internet of Things-the network of physical devices that are embedded with sensors, softwares, and connectivity that enable data exchange and analysis.
key customer-a customer that the firm has targeted as being important to its future success.
lead time-the amount of time that passes between the beginning and end of a set of activities.
operations strategy-a set of competitive priorities coupled with supply chain structural and infrastructural design choices intended to create capabilities that support a set of value propositions targeted to address the needs of critical customers.
order losers-product traits that, if not satisfied, cause the loss of either the current order or future orders.
order qualifiers-product traits that must be met at a certain level for the product to be considered by the customer.
order winners-product traits that cause the customer to select one product over its competitors.
order to delivery lead time-the time that passes from the instant the customer places an order for a product until the instant that the customer receives the product.
quality-a product’s fitness for consumption in terms of meeting customers’ needs and desires.
ransomware attack-a cyber attack in which the attacker makes the system unoperational and demands a payment, often in cryptocurrency, to return it to normal status.
responsible investing-targeting and investing in companies that positively embody the goals of ESG.
risk management-developing operations that anticipate and deal with problems resulting from natural events, social factors, economic issues, or technological issues.
strategic business units (SBUs)-the semi independent organizations used to manage different product and market segments.
strategic profit model (SPM)-a model that shows how operational changes affect the overall performance of a business unit.
sustainability-maintaining operations that are both profitable and nondamaging to society or the environment.
SWOT (strengths, weaknesses, opportunities, threats)-a strategic planning technique to help firms identify opportunities where they can develop a sustainable competitive advantage and areas where the firm is significantly at risk.
timeliness-the degree to which a product is delivered or available when the customer wants it.
time to market-the total time that a firm takes to conceive, design, test, produce, and deliver a new or revised product for the marketplace.
triple bottom line-an approach to corporate performance measurement that focuses on a company’s total impact measured in terms of profit, people (social responsibility), and the planet (environmental responsibility).
value proposition-a collection of product and service features that is both attractive to customers and different than competitors’ offerings.
What three levels does operations strategic planning occur on?-corporate, business unit, and operations strategy
the business model, which drives operations strategic planning, interprets the demands of the critical customer into what three concepts?-order winners, losers, and qualifiers
the fit between which three elements defines the effectiveness of a operation strategy?-key customers, value propositions, and operations capabilities.
In developing future capabilities of the supply chain, what must operations managers protect?-firm’s core capabilities
operations and supply chain management impacts what?-costs, timely delivery, innovation, reponsiveness, security, and sustainability.
bottleneck-an activity or resource that limits or constrains the output of a process.
capacity-the limit on the amount of output per period of time that a process can generate or store given a level of inputs and resources available.
cycle time-the time that it takes to process one unit at an operation in the overall process.
delay-an unintentional stoppage of the flow of work.
diseconomies of scale-occurs when the cost per unit increases as an operations size increases.
economies of scale-as production volume increases with additions of capacity, the unit cost to produce a product decreases to an optimal level.
effective capacity -the level of capacity or output that a process can be expected to produce under normal conditions; what management plans for under normal capacity.
flow time-the time it takes one unit to get through a process.
inspection-an activity that checks or verifies the result of another activity.
Juran’s Law-a key premise of process thinking: 15% of operational problems are the result of human errors; the other 85% are due to systematic process errors.
learning curve-as the production volume doubles, the labor hours required decrease by a constant proportion.
Little’s Law-an empirically proven relationship that exists between flow time, inventory, and throughput.
maximum relationship-the highest level of output that a process can achieve under ideal conditions in the short term, also known as design capacity.
metrics-a measure, a standard, and a consequence that work together to close the gap between what is valued by the customer and what is intended by the organization.
operation-an activity that changes/transforms an input.
parallel structure-a process where there are two or more resources doing the same task simultaneously.
process-a system of activities that transforms inputs into valuable outputs.
process capabilities-the specific types of outputs and levels of performance that a process can generate.
process thinking-a way of viewing activities in an organization as processes rather than as departments or functions.
serial/sequential structure-a process structure where the activities occur one after the other in a sequence
storage-an activity that intentionally stops the flow of work items and places them under formal control.
theory of constraints (TOC)-the overall management system that strives to improve system performance by indentifying, focusing on, and managing constraints.
transportation-an activity that moves an input from one place to another without changing any of its other characteristics.
utilization-the percent of process capacity that is actually used.
wait time-the amount of time that an item spends waiting.
yield rate-the percentage of units successfully produced as a percentage of inputs.
what are examples of inputs used by a process?-materials, energy, information, management, technology, and labor
what are examples of outputs used by a process?-products, information, and experiences
what are the six types of process activities?-operations, decisions, storage, transportation, delays, and inspection
what type of activity determines the maximum level of output from a process and why?-the bottleneck activity, because it has the lowest capacity and therefore must be the focus if managers want to increase output and/or decrease lead time.
Capacity calculations-sum of total processing time and total setup time for products divided by the total operating time available
variability in processes _______ capacity, cost, and lead times.-consumes
combine-a disposition decision to join the activity with others that do the same or similar thing.
dispositioning-a decision regarding what to do with each specific activity at the time of analysis.
eliminate-a disposition decision to drop the activity because it generates waste.
future state -the new or proposed process that the changes in the existing processes are intended to achieve.
keep-a disposition decision where we agree to keep the process as is for the time being.
necessary but not value adding activity-any activity that does not add value directly but is necessary before a value-adding activity to take place.
physical layout diagram-a technique that documents both the horizontal and vertical movements of work within the process
process flow diagramming-a technique used to indicate the general flow of plant processes and equipment.
process flow table-a technique that records process activities, their key attributes, and their sequence.
process mapping and analysis-a technique for graphically documenting the activities in a process with the goal of identifying opportunities for improvement.
process summary table-a table that summarizes the current process and the proposed new process and identifies the expected improvements offered by the proposed process.
question mark activity-any activity that cannot be easily categorized into one of the prior categories (value, necessary but not value-adding, waste)
repositioning-deciding where to position an activity in the overall process—either on the critical path or off the critical path.
rethink-a disposition decision to reevaluate the activity with the goal of improving its efficiency
service blueprinting-a technique for mapping an entire service system, so that the process can be analyzed, monitored, and improved in its ability to satisfy the needs of the customer.
swim lanes-a visual element used in process flow diagrams or flowcharts that organizes the activities into groups based on the major types of tasks being carried out or the departments responsible for those activities.
value-adding activity-any activity that moves the product closer to the form or location desired by the customer.
value stream mapping-a mapping technique that analyzes the flow of material and information needed to bring a product to the consumer.
waste generating activity-any activity that consumes resources and time without returning any form of value.
process mapping and analysis tools provide the means for process improvements. what are the six major steps?-1) determine the desired outcome and metrics needed to evaluate performance; 2) identify and bound the critical process; 3) document the existing process (current state map); 4) analyze the process and prioritize opportunities for improvement (specifically bottleneck activity); 5) recommend appropriate changes to the process (future state map); 6) implement the changes and monitor improvements.
what are the four process mapping and analysis tools?-process flow table, physical layout diagram, process map, and process summary table
what specifically does process mapping and analysis tools help describe?-number and types of activities in a process, their organization, the time they require, and the distance they cover.
augmented reality-a virtual reality experience that overlays virtual information onto a camera feed depicting a real world scene.
beta testing-an approach in which customers use product prototype versions and provide feedback to developers.
componenets standardizations-reusing part designs across multiple products in order to reduce development and production costs
computer aided design (CAD)-systems that automate the development of drawings and technical specifications
computer aided engineering (CAE)-systems that create and analyze three-dimensional product models, reducing the need to build physical prototypes.
concurrent engineering-the simultaneous design and development of all the processes and information needed to produce, sell, distribute, and service a product.
crowdsourcing-the process of obtaining ideas or services by soliciting contributions from a large group of people, especially from an online community.
customer requirements planning matrix-a template that guides identification and translation of customer requirements into products features.
design for assembly-focus on minimizing the number of parts in a product and easing the assembly processes.
design for environment-focus on minimizing the detrimental environmental impacts of product and process designs across all stages of a product’s life.
design for logistics-focus on minimizing packaging, handling, and shipping costs for products.
design for manufacture (DFM)-an umbrella term that describes methods and tools that focus design activities on improving the ease with which products can be produced.
design for product serviceability-focus on easing product disassembly and reusing product components.
design for Six Sigma-focus on systematically evaluating the consistency with which a good or service can be produced or delivered given the capabilities of the processes used.
early supplier involvement (ESI)-a codevelopment approach in which suppliers participate directly in product design activities.
failure modes and effects analysis (FMEA)-a procedure for identifying and correcting potential quality problems inherent to product or process designs.
group technology-an approach to work layout and scheduling that gathers in one location all of the equipment and work skills necessary to complete production of a family of similar products.
House of Quality-a template that guides identification and translation of customer requirements into product features.
innovation portfolio planning-the process of selecting and prioritizing innovation projects to ensure that they are consistent with the firm’s strategy and development capacity.
modular product design-using combinations of components with standardized product interfaces to create different product variations.
new process design and development projects-the transformation of product specifications and new process technology into a new or revised production system.
new product design and development projects-the transformation of a new market opportunity and/or new product technology into a set of specifications that define a product.
open innovation-an organizational effort to capture ideas and resources from sources outside the firm for use in innovation efforts.
producibility-a measure of the speed, ease, cost efficiency, and reliability with which a product can be produced.
product life cycle-a pattern of sales growth and decline over the period in which a product is offered.
product life cycle management (PLM)-a facilitated process used to capture and share all the information needed to define the products throughout their life.
quality function deployment (QFD)-a method for translating ordinary language used to describe customer needs into engineering language used to set product and process design parameters.
risk priority number (RPN)-a rating used ing FMEA to indicate the combined probability, severity, and undetectability of a failure mode.
robust design-focus on designing products that can be made consistently even with varying inputs and operating conditions.
stage gate process-a disciplined approach that defines specific criteria for each project stage that must be completed before proceeding to the next stage.
3D printing-also called additive manufacturing, this process makes products by putting down successive layers of thin material such as plastic, metal, ceramics, or food.
value engineering/value analysis-a method to improve the benefits and costs of a product through a detailed examination of its function.
virtual reality-a computer generated scenario and environment that simulated a realistic experience
voice of the customer (VOC)-research efforts that gather detailed data describing customers’ wishes, needs, likes, and dislikes regarding specific product features and functionalities.
How do innovative firms gain advantages over their competitors?-idea and opportunity development, project portfolio planning, project management, and postproject learning.
What are the typical six stages of an innovation project?-concept development, product and process planning, detailed design and development, product and market testing, commercialization, and market introduction.
What are the benefits of concurrent innovation processes?-reducing execution time, optimizing resource usage, improved system performance
assemble to order (ATO)-products that are produced from standard components and modules
back office processes-processes that are not seen by the customer
batch process-a process in which goods or services are produced in groups (batches) and not in a continuous stream.
cellular manufacturing-the production of products with similar process characteristics on small assembly lines called cells.
continuous process-a single flow process used for high volume nondiscrete, standardized products.
customer contact-the presence of the customer in a process.
engineer to order (ETO)-unique, customized products.
fixed position layout-the layout used when the product cannot be moved during production.
flexible manufacturing systems (FMS)-combine automated machines, robots, and material handling systems that are all controlled by a single computer.
front office processes-processes that have contact with the customer.
functional layout-a layout that groups together similar resources.
job shop-a flexible process structure for products that require different inputs and have different flows through the process.
line balancing-used to assign tasks so that idle time and the number of workstations are minimized.
make to order (MTO)-products that have similar designs but are customized during production
make to stock (MTS)-finished goods that are held in inventory in advance of customer orders.
mass customization-uses advanced technologies to customize products quickly and at a low cost
precedence relationships-presents the order in which tasks must be completed
product families-groups of products that have similar processing requirements
product layout-a layout where resources are arranged according to a regularly occurring sequence of activities.
product process matrix-categorizes processes into structures based on output volume and variety.
project-a one time or infrequently occurring set of activities that create outputs within pre-specified time and cost schedules.
repetitive process-a process in which discrete products flow through the same sequence of activities.
service process matrix-categorizes service processes based upon the degree of customization/customer interaction and labor/capital intensity.
takt time-the maximum allowable time at each workstation, based on customer demand.
what are the seven classifications in the product-process matrix (by output volume and variety)?-project, job shop, batch, repetitive process, continuous process, mass customization, and cellular manufacturing
what are the two contemporary process structures (product process matrix)?-mass customization and cellular manufacturing
what are the four classifications of the service-process matrix (by customization/customer interaction and labor/capital intensity)?-professional service, service factory, service shop, and mass service
What does the service-process matrix classify service processes considering?-customization/customer interaction and labor/capital intensity
What does the product-process matrix classify product processes considering?-output volume and variety
What are the four types of layouts?-product, functional, cellular, and fixed position
What are the four reasons for economies of scale?-1) allocation of fixed cost; 2) beneficial equipment and construction costs; 3) lower costs for purchases (because of higher volumes); 4) learning curve (employees become more efficient at their jobs as volume increases