    • Proposal to modify existing roof structure:

      • Replace the existing flat roof with a shed roof design.

      • Extend the roofline and introduce a hip design.

  • Room layout considerations:

    • Inclusion of two additional bedrooms in the design.

    • Clarification on the absence of a second floor:

      • No terrace allowed due to single-story constraint.

      • No balcony permitted for the same reason.

Class Assignments

  • Assignment Guidance:

    • Reminder: Assignment 1 needs to be completed at home.

    • Activities in class are meant for practice.

      • Importance of making genuine effort in activities.

      • Accuracy is less significant; focus on completion and learning.

  • Activity 3 Discussion:

    • Instruction on how to access AutoCAD file for the project.

      • Focus on creating views and detailing an existing kitchen.

  • AutoCAD and Revit Tools:

    • Update on Revit library accessibility:

      • Library issues have been resolved; all necessary files should now be available.

      • Specific categories available in the library:

        • Base cabinets, countertops, and upper cabinets can be accessed easily.

  • Office 365 Use:

    • Instructions for accessing shared folders in Office 365 OneDrive:

      • Ensure to log in and navigate to the shared folder for materials.

  • Class Dynamics:

    • Encouragement of collaboration within class:

      • Students are advised to work together while engaging with Activity 3.