Comprehensive Study Guide: Engineering Surveying I - Basics of Surveying and Horizontal Distance Measurements
Course Overview & Syllabus Details
- Course Code: EGCV2120
- Course Title: Engineering Surveying I
- Credit Hours:
- Prerequisites: None
- Department: Civil and Architectural Engineering, Department of Engineering
- Institution: University of Technology and Applied Sciences, Sultanate of Oman
- Course Goal: Impart knowledge about the principles of surveying, the use of a range of survey equipment in the field to measure, and the preparation of required data for civil engineering works.
Course Overview / Chapters
- Chapter 1: Basics of Surveying and Horizontal Measurement
- Chapter 2: Levelling
- Chapter 3: Angles and Directions
- Chapter 4: Measurement of Areas and Volumes
- Chapter 5: Theodolite Surveying
Course Learning Objectives and Mapping Outcomes
- Course Objective 1: Impart fundamental concepts about surveying, its applications, horizontal distance measurement, and its methods.
- Mapped Outcome 1: Gain knowledge about basics of surveying, classification, and types of surveying; introduction to maps and plans with different scaling.
- Course Objective 2: Illustrate different methods for measuring angles and directions.
- Mapped Outcome 2: Distinguish between the concepts of meridians and bearings, measuring horizontal and vertical angles by angle-measuring instruments.
- Course Objective 3: Demonstrate knowledge about the determination of elevations and its methods.
- Mapped Outcome 3: Analyze basic concepts of elevation and its methods to find the difference in level between any two points.
- Course Objective 4: Examine concepts of computation of area and volume.
- Mapped Outcome 4: Identify different methods for calculating area and volume.
- Course Objective 5: Acquire knowledge about the basics of curves and their applications in the field.
- Mapped Outcome 5: Determine distance and elevations by tachometry.
- Mapped Outcome 6: Interpret the uses of curves in surveying and their types.
- Course Objective 6: Illustrate appropriate methods to measure various parameters at a construction site and their practical applications.
- Mapped Outcome 7: Execute practical work related to surveying by using basic and modern surveying instruments.
Assessment Plan & Rubric
- Mid Exam:
- Weight:
- Learning Outcomes Mapping: Outcomes 1 & 3
- TEST:
- Weight:
- Learning Outcomes Mapping: Outcome 1
- FINAL EXAM:
- Weight:
- Learning Outcomes Mapping: Outcomes 1, 2, 3, 4, 5 & 6
- PRACTICAL:
- Weight:
- Learning Outcomes Mapping: Outcomes 1, 2, 3, 4, 5 & 7
- Total Weight:
Instructions to Students
- Be regular and punctual to all classes.
- Carry handouts (hard or soft copy) for every class.
- Bring a pen, scale, pencil, eraser, and CASIO scientific calculator.
- Use of mobile phones inside the class is prohibited.
- Attend classes in the specific section registered.
Basics of Surveying and Definitions
- Surveying Definition: The art and science of determining the relative positions of points above, on, or beneath the surface of the earth, or establishing such points, and representing them graphically or numerically (Bannister).
- Land Surveying Definition: The detailed measurement and description of land, including its boundaries, topography, and dimensions.
Objectives of Surveying
- To determine the relative positions of points on the earth's surface.
- To set out lines and grades needed for the construction of buildings, roads, dams, and other structures.
- To calculate areas, volumes, and other related quantities.
- To prepare necessary maps and diagrams of an area.
Classification of Surveying
Primary Classifications
- Plane Surveying:
- Assumes the earth's surface is flat (a horizontal plane).
- Neglects the curvature of the earth.
- Applicable for relatively small areas of less than .
- Plumb lines across different points are treated as parallel lines.
- Used for most engineering construction projects such as canals, railways, highways, buildings, and pipelines.
- Geodetic Surveying:
- Takes into account the true spheroid shape and curvature of the earth's surface.
- Applicable for large survey areas exceeding .
- Plumb lines converge toward the center of the earth.
- Carried out for highly precise works.
- Crucial for national mapping, land development, mining, agriculture, and environmental management.
Branches classified by Purpose
- Control Surveying: Establishes horizontal and vertical positions of control points used as reference points for other surveys.
- Land Surveying (Planimetric / Property / Boundary / Cadastral Survey): Determines the boundaries and areas of land parcels.
- Topographic Survey: Prepares a plan or map of a region showing natural and man-made features along with structural elevations.
- Engineering Survey: Collects requisite data for planning, design, and execution of engineering projects. Divided into three steps:
- Reconnaissance Survey: Explores site conditions and availability of infrastructures.
- Preliminary Survey: Collects adequate data to prepare a plan/map of the area for design purposes.
- Location Survey: Sets out work on the ground for actual construction and execution.
- Route Survey: Plans, designs, and lays out routes for linear projects including highways, railways, canals, and pipelines.
- Construction Survey: Establishes points, lines, and grades required for staking out engineering works after designs are finalized.
- Astronomic Survey: Determines latitude, longitude, and azimuth of observation stations using astronomical observations.
- Mine Survey: Special survey procedures conducted specifically for surface (opencast) and underground mining operations.
Branches classified by Nature of Field
- Land Surveying
- Marine (Hydrographic) Surveying
- Astronomical Surveying
Branches classified by Survey Methods
- Triangulation Surveying: Survey stations are connected with survey lines forming a network of triangles. Used for large areas with uneven boundaries. Triangle formulas are applied to solve dimensions.
- Traverse Surveying: The survey area is divided into a series of connected lines forming an open or closed polygon or framework.
Principles of Surveying
- Principle 1: Work from the Whole to the Part
- The entire area is first enclosed by main controlling stations and main survey lines.
- The area is subsequently divided into smaller parts by forming well-conditioned triangles.
- Main lines are measured with high accuracy to prevent the accumulation of errors. Minor details are filled in later. If work progresses from part to whole, small errors multiply and accumulate over large areas.
- Principle 2: Locate New Stations by at Least Two Measurements from Fixed Reference Points
- Positions of new stations must always be anchored using a minimum of two reference measurements from established reference points.
- Measurements can be linear (using tape/chain) or angular (using theodolite/compass), or a combination of both.
Plans and Maps

Definitions & Comparative Features
- Plan:
- Graphical representation to scale of features on, near, or below the surface of the earth as projected onto a horizontal plane.
- Drawn on a large scale (e.g., or scale , such as or ).
- Covers a small area with high detail (exact dimensions of buildings, road widths, structural elements).
- Depicts horizontal distances and directions.
- Map:
- Visual or graphical representation of a large portion of the earth's surface on a flat sheet of paper on a small scale.
- Drawn on a small scale (e.g., or scale , such as or ).
- Covers a large area showing key relationships (distance, direction, size) between major features without exact structural detail.
- Topographic maps explicitly depict vertical distances (elevations) using contours.
Types of Maps
- Physical (Relief) Map: Displays natural geographical features of the earth such as mountains, plateaus, plains, rivers, and oceans.
- Thematic Map: Displays specific themes or data distributions such as climate, rainfall, vegetation, land use, population density, or life expectancy.
- Political Map: Displays administrative and political boundaries of cities, towns, governorates, states, and national borders.
- Topographic Map: Utilizes contour lines to show relief, shape, and elevation of terrain. Closely spaced contour lines represent steep terrain, whereas widely spaced lines represent flat terrain.
Types of Plans
- Architectural Plans: Includes site plans, floor plans, and sectional drawings detailing geometry and layout.
- Structural Plans: Details structural engineering elements including column layouts, footing designs, beam schedules, and reinforced concrete slab reinforcement.
Fundamental Concepts & Computations
Rounding Off Rules
- Rule 1: If the digit following the rounding digit is , , , or , drop all digits to the right of the rounding digit.
- Example 1.1: Round off
- To nearest Hundredths:
- To nearest Tenths:
- To nearest Units:
- Example 1.1: Round off
- Rule 2: If the digit following the rounding digit is , , , , or , add to the rounding digit and drop all digits to the right.
- Example 1.2: Round off
- To nearest Hundredths:
- To nearest Tenths:
- To nearest Units:
- Example 1.3: Round off and to the nearest hundredths:
- Example 1.2: Round off
Units of Measurement
Linear & Area Conversions
Worked Example 1.4
Convert to:
- Hectares:
- Acres:
Angular Units
- Measured in degrees (), minutes (), and seconds ().
- Sexagesimal System:
- Conversion Examples:
- Express in angular sexagesimal units:
- Whole degrees =
- (Whole minutes = )
- Result:
- Express in decimal degrees:
- Degree to Radian Conversion:
- Express in angular sexagesimal units:
Scaling
- Definition: Scale is the ratio of the distance on the drawing/map to the corresponding actual horizontal distance on the ground.
- Types of Scale:
- Full-Size Scale: Actual length is represented in full size ().
- Reducing Scale: Actual length is reduced to fit the drawing sheet.
- Increasing / Enlarging Scale: Small actual features are enlarged to display fine details clearly.
Scale Classification Ranges
- For Maps:
- Large scales:
- Intermediate scales: to
- Small scales: to
- For Plans:
- Site plans: to
- Detail plans: to
Methods of Expressing Scale
- Verbal Scale (In Words): Stated directly in words, e.g., "One inch represents 16 miles".
- Graphical / Linear Scale: Drawn directly on the map as a graduated bar/ruler line representing ground distances. Remains accurate even if paper shrinks or expands.
- Representative Fraction (RF Scale): Expressed as a unitless ratio or fraction, e.g., or , where unit on paper equals of the same units on the ground.
Scale Ordering Problems
- Rule: A larger scale has a smaller denominator fraction value. Smaller representative fractions indicate smaller scales.
Example 1.6
Arrange scales from Smallest to Largest: Given: , , ,
- Smallest to Largest:
Practice Problem 1.5
Arrange the following scales from Smallest to Largest:
- Option A:
- Option B:
- Option C:
- Option D:
Order from Smallest to Largest:
- ()
- ()
- ()
- ()
Map Scale Measurement Problem
Calculate distance in kilometers given map scale and measured paper length :
- Scale conversion:
- Distance :
Horizontal Distance Measurement Methods
Basic Principles
- Two points form a line.
- The shortest distance between two points is a straight line.
Surveying Methods for Distance Measurement
- Pacing: Counting natural walking steps. Error is roughly
- Odometer: A wheel rolled along the ground that converts rotations to distance.
- Chaining / Taping: Direct measurement using steel tapes or chains.
- Stadia (Tachometry): Optical method using theodolite and leveling rod.
- Electronic Distance Measurement (EDM): Uses phase shift or pulse timing of electromagnetic/laser waves.
- Global Positioning System (GPS): Satellite-based signal positioning.
Taping Equipment & Accessories

- Engineer's Steel Tape: Graduated tape for linear measurement.
- Hand Level: Used to maintain tape horizontally on sloping ground.
- Marking Pins (Arrows): Steel pins to mark full tape-length intervals.
- Range Pole (Ranging Rod): Wood/metal pole painted red/white to mark line alignments.
- Tension Handle / Spring Balance: Standardizes applied pull/tension.
- Clamping Handle: Clamps tape securely without damaging it.
- Plumb Bob: Transfers point vertically from suspended tape level to ground peg.
Taping Procedure Steps
- Aligning the tape along the straight line.
- Stretching the tape under standard tension.
- Plumbing elevated ends over ground marks.
- Marking and tallying full tape lengths.
- Measuring remaining fractional tape lengths.
Basic Surveying Terms

- Survey Stations: Fixed control points on the ground defining survey lines.
- Main Stations: Primary boundary corner points enclosing the survey.
- Tie / Subsidiary Stations: Points selected along main lines to run secondary/tie lines.
- Main Survey Lines: Lines joining main survey stations.
- Base Line: The longest main survey line that forms the core backbone framework of the survey layout.
- Check Line: A line run from the apex of a triangle to a fixed point on the opposite base line to verify geometric accuracy.
- Tie Line: A secondary line connecting tie stations to capture interior site features and details.
- Offsets: Lateral perpendicular or oblique distance measurements from features/objects to the chain line.

- Perpendicular Offsets: Lateral measurements taken at an exact right angle to the survey line.
- Oblique Offsets: Lateral measurements taken at an angle other than when direct perpendicular layout is obstructed.
Errors in Surveying & Tape Corrections
- Error Definition: Difference between the measured value and the true/exact value of a quantity.
Systematic Taping Corrections
1. Correction for Absolute Length / Standard Length ()
When a tape's actual length differs from its nominal standard length :
- Correction per tape length
- Total correction
- Rule: If tape is too short (), measured distances read higher than actual, so correction is negative (). If tape is too long (), correction is positive ().
2. Temperature Correction ()
- = Coefficient of thermal expansion ()
- = Temperature during field measurement ()
- = Standard calibration temperature ()
- = Measured length ()
3. Pull / Tension Correction ()
- = Applied pull during field measurement ()
- = Standard calibration pull ()
- = Cross-sectional area of tape ()
- = Modulus of Elasticity ()
- = Measured length ()
4. Sag Correction ()
Applied when tape is suspended at support points without continuous ground contact:
- = Total weight of suspended tape span ()
- = Weight of tape per unit length ()
- = Applied pull ()
- Note: Sag correction is ALWAYS negative ().
5. Slope Correction ()
- = Elevation difference between tape ends
- = Slope angle
- Note: Slope correction is ALWAYS negative ().
Exercise Problems on Tape Corrections
Exercise Problem 1
A rectangular plot was measured using a steel tape which was found to be too short. Recorded length = , recorded width = . Calculate actual/correct area of the plot.
- Solution Steps:
- Nominal length
- Actual tape length
Exercise Problem 2
A distance of was measured with a steel tape standardized under and . Tape standard length . Field conditions: , . Tape suspended at ends, total weight . Tape properties: , , .
- Individual Corrections Summary:
- Absolute length correction
- Combined temperature & pull correction
- Sag correction
Exercise Problem 3
A single span distance of is measured using a steel tape supported at ends under pull (), (), unit weight , , , .
- Individual Corrections:
- Temperature correction
- Pull correction
- Sag correction
Obstacles in Linear Measurement
An obstacle is an object (pond, building, river, jungle) intersecting a survey line that prevents direct linear taping along that line.
Categories of Obstacles
- Obstacle to Chaining but not Vision: (e.g., rivers, ponds, sheets of water).
- Obstacle to Vision but not Chaining: (e.g., trees, jungles, small hills).
- Obstacle to both Chaining and Vision: (e.g., tall buildings, large structures).
Worked Numerical Examples for Obstacles
1. River Obstacle via Similar Triangles

A chain line crosses a river at . Given , , and . Calculate width
- Geometric Relation: By similar right triangles ():
- Calculation:
2. Building Obstacle via Right-Angle Trigonometry

A building obstructs survey line . Line is offset perpendicular to line . Given and . Calculate lengths and
- Calculation for :
- Calculation for :
3. River Width via Sine Rule
Given line along near bank. Observed angles to point across river:
- Triangle Angles:
- Sine Rule in :
- Width of River (perpendicular distance where ):
4. Pond / Lake Obstacle via Cosine Rule
A pond obstructs chain line . Line . Given , , , . Line is not perpendicular to . Calculate distance
- Step 1: Apply Cosine Rule in to find :
- Step 2: Apply Cosine Rule in to solve :
Academic References
- Bannister, A., Raymond, S. & Baker, R., Engineering Surveying, Longman Scientific and Technical, England.
- Basak, N.N., Surveying and Levelling, Tata McGraw Hill Education Private Limited.
- Punmia, B.C., Jain, A.K. & Jain, A.K., Surveying Vol. I & II, Laxmi Publications Pvt Ltd, New Delhi, 2005.
- Nathanson, J., Surveying Fundamentals and Practices, Prentice Hall Publishers, 2011.
- Irvine, W. & Maclennan, F., Surveying for Construction, Tata McGraw Hill Education Private Limited.
- Pettet, J., Site Surveying and Levelling, London: Hutchinson.
- Roy, S.K., Fundamentals of Surveying, Second Edition, Prentice Hall of India, 2004.
- Clark, D., Plane and Geodetic Surveying Vol. I and II, Constable and Company, London, 1980.
- Davis, R.E., Foote, F.S. & Kelly, J.W., Surveying: Theory and Practice, 7th Ed., McGraw-Hill, New York, 1980.