Systems Analysis and Design - Chapter 7 Flashcards
Software as a Service (SaaS)
Software deployment model that hosts an application as a service over the Internet.
Reduces the customer’s need for software maintenance, operation, and support.
Service-Oriented Architecture (SOA)
A way of engineering systems where reusable business functionality is provided through well-defined interfaces.
It's an architectural style, not a software architecture itself.
Traditional vs. Web-Based Systems Development
Traditional Development
System design is affected by compatibility issues.
Systems run on local and wide-area networks.
Often uses Internet links and resources.
Development paths include:
In-house development
Purchase of a software package with modification
Use of outside consultants
Scalability is affected by network limitations.
Web-Based Development
Systems are developed and delivered on an Internet-based framework.
Treats the Web as the platform.
Easily scalable and can run on multiple hardware environments.
Used for CRM, order processing, and materials management.
Treats software applications as services.
Requires middleware to communicate with existing software and legacy systems.
Opens more complex security issues.
Middleware connects dissimilar applications to communicate and exchange data.
Evolving Trends
Web 2.0
Second generation of the web, enabling collaboration, interaction, and information sharing.
Enhances interactive experiences.
Cloud Computing
Online software where applications and services are accessed and used through an Internet connection.
Mobile Devices
Smartphones, tablets, and other computing devices that are not permanently connected.
Outsourcing
Transfer of information systems development, operation, or maintenance to an outside firm.
Service Provider
Offers outsourcing solutions.
Application Service Provider (ASP)
Delivers a software application or access to it for a fee.
Internet Business Services (IBS)
Also called managed hosting.
Provides web-based support for transactions.
Outsourcing Fees
Fixed Fee Model: A set fee for a specified level of service and user support.
Subscription Model: Variable fee based on the number of users or workstations.
Usage Model/Transaction Model: Variable fee based on the volume of transactions or operations.
Outsourcing Issues and Concerns
Mission-critical IT systems are outsourced if cost-effective and reliable.
Overseas outsourcing raises issues with control, culture, communication, and security.
Reviewing the outsourcing firm’s history and financial condition is vital.
Outsourcing clients can be affected by mergers and acquisitions.
Employee job security is a major concern.
Offshore Outsourcing
Also called global outsourcing.
Shifting IT development, support, and operations to other countries.
Driven by lower costs.
Risks and concerns include impact on the economy, project control, and security issues.
In-House Software Development Options
Software Development Options
Develop own systems.
Purchase, customize, and implement a software package.
Total cost of ownership (TCO) is most important.
Develop user applications based on commercial software packages.
Make or Buy Decision
Refers to the choice between developing (make) and purchasing (buy).
company’s IT department develops in-house software.
Software package is obtained from a vendor or application service provider.
Software Package: Obtained from a vendor or application service provider.
Software Vendors: Develop software for sale.
Value-Added Reseller (VAR): Enhances a commercial package by adding custom features.
Horizontal Application: Can be used by many different types of organizations.
Vertical Application: Developed for a specific type of business.
Developing Software In-House
Satisfies unique business requirements.
Minimizes changes in business procedures and policies.
Meets constraints of existing systems and technology.
Develops internal resources and capabilities.
Purchasing a Software Package
Lower costs.
Requires less time to implement.
Proven reliability and performance benchmarks.
Requires less technical development staff.
Future upgrades provided by the vendor.
Input from other companies (users).
Customizing a Software Package
Purchase a basic package for customization.
Negotiate with the vendor for enhancements.
Purchase and make project-specific modifications (ensure license allows).
Creating User Applications
User Application: Utilizes standard business software.
User Interface: Enables effective interaction.
Service Desk/Information Center (IC): Provides user support.
Screen/Report Generators: Allow users to design forms and reports.
Appropriate controls are required for data security and integrity.
The Systems Analyst’s Role
Based on decisions taken by the organization in the systems development process.
Considers current and future needs.
Evaluation and selection of alternatives is a complicated process.
Forecasting actual costs is difficult.
Evaluation and Selection Team: Selects hardware and software, includes systems analysts and users.
Ensures critical factors are not overlooked.
Analyzing Cost and Benefits
Financial Analysis Tools
Payback Analysis: Determines the time taken for an information system to pay for itself.
Return on Investment (ROI): Percentage rate that compares total net benefits to total costs.
Net Present Value (NPV): Total value of the benefits minus the total value of the costs. , where is the discount rate and is the time period.
Cost-Benefit Analysis Checklist
List each development strategy.
Identify all costs and benefits.
Consider future growth and scalability.
Include support costs for hardware and software.
Analyze software licensing options.
Apply financial analysis tools.
Study the results and prepare a report.
The Software Acquisition Process
Step 1: Evaluate the Information System Requirements
Identify key features.
Consider network and Web-related issues.
Estimate volume and future growth.
Specify hardware, software, or personnel constraints.
Prepare a request for proposal or quotation.
Request for Proposal (RFP): Used for detailed information about the product or service.
Request for Quotation (RFQ): Used when price is the primary factor.
Step 2: Identify Potential Vendors or Outsourcing Options
Use the Internet for information.
Consulting firms can help select software packages.
Use online forums or newsgroups for opinions and ideas.
Step 3: Evaluate the Alternatives
Get feedback from existing users.
Perform application testing with users.
Benchmarking: Measures the time a package takes to process transactions; match against RFP features and rank choices.
Step 4: Perform Cost-Benefit Analysis
Calculate total cost of ownership (TCO) for each option.
Study the software license conditions.
Consider a supplemental maintenance agreement.
Step 5: Prepare a Recommendation
Evaluate and describe alternatives with costs, benefits, advantages, and disadvantages.
Submit a formal system requirements document and deliver a presentation.
Step 6: Implement the Solution
Implementation tasks depend on the solution selected.
Complete implementation steps before the new software becomes operational:
Loading
Configuring and testing
Training users
Converting data files
Completion of Systems Analysis Tasks
System Requirements Document
Also called software requirements specification.
Contains the requirements for the new system.
Describes the alternatives considered.
Makes a specific recommendation to management.
Similar to a contract.
Identifies items that system developers must deliver to users.
Format and organize the systems document for ease of use.
Presentation to Management
Helps take key decisions to affect the future development of the system.
Suggestions for effective presentations:
Brief overview
Summarize primary alternatives
Explain the selection choice
Allow time for discussion
Obtain a final decision or agree on a timetable
Depending on management’s decision, a systems analyst will:
Implement an outsourcing alternative
Develop an in-house system
Purchase or customize a software package
Perform additional systems analysis work
Stop all further work
Post presentation and management decision, the project begins a transition to the systems phase of the SDLC.
Transition to System Design
Preparing for Systems Design
Systems design requires accurate documentation.
Provide detailed specifications for output, input, data, processes, and other requirements.
Logical Design: Defines what must take place.
Physical Design: Describes the actual process of entering, verifying, and storing data.
Logical and physical designs are closely related.
Accurate systems analysis is required.