126 Terms

1
New cards

The historical time frame covering the constructions of pyramids in Egypt is a time when the distinctions between the design and construction professionals identified the following as builders

Master Builders

2
New cards

During the roman empire, they developed which of the following? 1-concrete, 2-bridges, 3-domes, 4-arches, and 5-trusses

1,3,4

3
New cards

Road construction was created during the industrial revolution? T/F

false

4
New cards

Stone construction was revitalized in the middle ages by the roman catholic church? T/F

true

5
New cards

Skyscrapers came about in the late 1800s as a result of what? 1-electricity, 2-steel replacing iron, 3-portland cement, 4- reinforced concrete, 5-mass produced glass

All of these

6
New cards

the 20th century brought about building codes, standards, and specs to help regulate and control quality? T/F

true

7
New cards

The construction industry includes which of the following sectors? 1-industrial, 2-environmental, 3-residential, 4-commercial, 5-heavy civil

all of these

8
New cards

Most building construction projects are designed with an engineer leading the design process? T/F

false

9
New cards

Most construction projects in the United States are funded by public money? T/F

false

10
New cards

Heavy/Civil construction includes which of the following= 1-roadways, 2-bridges, 3-airport hangers, 4-railways, 5-data centers, 6-tunnels

1,2,4,6

11
New cards

No construciton project would exist without an?

owner

12
New cards

The book identifies a group of project values. Which one of the PV is most important?

Safety

13
New cards

The owner creates the basis for the design of a project and it is called the program of requirements? T/F

true

14
New cards

Most design build prjects are designer lead? T/F

False

15
New cards

CoSci has student chapters with all national construction organizations except which?

Design Build Institute of America

16
New cards

Which of these project delivery methods is thew contractor not involved in the deisgn?

Design-Bid-Build

17
New cards

The law requires contractors to provide certasin bonds on public projects, which are they? 1-construction, 2-payment, 3-bid, 4-performance, 5- project

2,4,5

18
New cards

Which of the following 2 items is generally the first to be utiliozed in contractor selection process?

RFQ-request for qualifcations

19
New cards

Now that you have been given the project, it is now the time to look closely at what exactly youre responsible for? T/F

false, look before you bid

20
New cards

The project manual, which includes the specs, defines the quanity of work-length, width, volume and so on? T/F

False

21
New cards

Which of these requests does not invlve pricing components

RFQ

22
New cards

The notice to proceed is the document issued by the owner authorizing the contractor to start-

Construction

23
New cards

The residential construction market is relatively easy to get into but many companies are small with high fail risk? T/F

True

24
New cards

Most environmental prjects are designed with an architect leading the design? T/F

False

25
New cards

In team dynamics, which of the following is not one of the 4 personality types? amiables, analyticals, drives, universalists

Universalists

26
New cards

_ and _ are the 2 major compnents that make up constarct documents

drawings and specifications

27
New cards

Cad stands for_

Computer Aided Design

28
New cards

There is a particular way in which drawings are organized in a set identify the correct order. a-architectural, b-structural, c-MEP, d-general, e-civil

deabc

29
New cards

WHat division would you find insulation?

Division 7

30
New cards

Which is not one of the four basic types of construction contracts?

Professional Services Agreement

31
New cards

Document used to make changes in a set of contract documents before trades are awarded?

Addenda

32
New cards

Which of the following is the preferred delivery method for public institutional commerical construction projects?

Design-Build

33
New cards

of the 4 distint stages of the design process, which is third? Schematic design, contrcat documents, programming and feasibility, design development

Design development

34
New cards

Who is responsible for adminstering local building codes?

Authority having Jurisdiction (AHJ)

35
New cards

Which of the following completes Big Guy's quote for preconstruction abilities? The ability to read in _ dimensions and see in _ dimensions

2 & 3

36
New cards

Charcateristics of good estimators would include what?

technical abilities, visualization skills, knows contract documents, detailed number skills

37
New cards

Are construction estimates typically organized by construction specification institute division of work? T/F

true

38
New cards

Name the 4 primary categoris of direct costs in construction estimates

labor, subcontracts, material, equipment

39
New cards

Lead time is the amount of time it takes for products or equipment to be delivered to job? T/F

true

40
New cards

Liquidated damages are the daily amount of time paid by the contractpr to the owner for each day that the proiject fails to meet the completion date specified in the contract? T/F

False

41
New cards

Which of the following does not belong to the 4 indirect costs ina construction esitmate?

Small tools for installation

42
New cards

General Conditions or Job overhead are calculated on basis of

Time

43
New cards

The benefit of a cost model is to guide design? T/F

true

44
New cards

Conceptual estimating through the design process can ensure that the completed design is in line with the budget? T/F

True

45
New cards

Who should perform the constructability review?

Construction manager

46
New cards

Which of the following would be included in feasibility study for a new school? traffic and parking, envrionment impacts, landscaping, proximity to fast food

Traffic and parking, environmental impacts

47
New cards

List the most common preconstruction services

Constructability reviews, life cycle analysis, target value design, value engineering

48
New cards

Proconstruction services is the process that represents the front end planning, cost estimation, and execution planning for a prject that gets the project to _

Start

49
New cards

What are 4 ways owners can benefit from alternative project methods?

higher quality, greater value, less waste, more innovation

50
New cards

Complete the following statement- The simplest ways to understand the difference is that we manage _ and lead _

things & people

51
New cards

Give 3 examples of effective speaking

review and summarize, set a "by when", watch nonverbal cues

52
New cards

Give 3 examples of effective listening

Positive listening energy, show respect and concern, stop talking

53
New cards

name 3 key members of the project team

owner, architect, GC/CM

54
New cards

The most underutilized resources available during the design phases is the engagement of the field personel who have experience installing the systems, equioment, and products? T/F

True

55
New cards

What marks the official end of the project?

substantial completion

56
New cards

Name the positions that make up the the memebrs of the on site construction management team

Field engineer, project manager, super intendent

57
New cards

Project close out includes which of the following?

final completion, certificate of occupancy, project punch lists, substantial completion

58
New cards

The AHJ is responsible for which?

Adminstering building bodes, issuing building permits, issuing certificates of occupancy, inspections for compliance

59
New cards

Which are the stages of the design process?

schematic design, programming/feasibility, construction documents, design development

60
New cards

What is the measure of a succesful project? profit goals achied, AHJ accepted building, Bank accepted building, budget aligned with program

All of the above

61
New cards

Its not _ until somebody _ it

architecture & builds

62
New cards

Which of the following is a means of contractor receiving clarification from the architect regarding details of the design after the contract documents have been publisbed and guaranteed max price executed? submittal approvals, addenda, RFI responses, Change order request

RFI responses

63
New cards

What is the purpose of a submittal?

color options, product data, product sample, product literature

64
New cards

The prupose of shop drawings is to supplement contract documents? T/F

True

65
New cards

What is the name of the document that establishes the template for measuring work progress as it related to requests for payment?

Schedule of values

66
New cards

Liquidated damages are assessed in lieu of actual damages? T/F

true

67
New cards

What is retainage? percentage established in contract to withhold from progress payments, amound that is deducted from the schedule of values, amount deducted from an approved change order

All of these

68
New cards

Which of the following is a form of dispute resolution?

mediation, binding arbitration, non binding arbitration

69
New cards

a site logistics plan should include all of the following-

location of temporary field offices, traffic routes, security measures for construction, site location and access

70
New cards

a mock up is seperate from the building? T/F

true

71
New cards

Which construction software will provide project management and document control?

Procore, E-builder, Newforma

72
New cards

Assignment 8 had you study 5 construction software packages. Which is the software package for scheduling

Ebuilder, newforma, primavera, procore( all)

73
New cards

Indetify 3 issues that the superintendent must be concerned with when trying to manage construction operations?

Material and equipment deliveries, subcontractor coordination, jobsite safety

74
New cards

When scheduling subcontractors, you should try to follow what fundamental rules?

are we ready for them? can we pay them? Has the mock up been reviewed and approved for their work? Do they have everything they need to complete their work?

75
New cards

Just in time deliveries focuses on planning for materials and equipment to arrive, be unloaded, and set in place? T/F

True

76
New cards

Identify factors that can negatively impact construction productivity

high rise construction, changes, crowded work spaces, inexperienced or poorly trained craftsmen

77
New cards

Identify environmental issues that might interfere with the project schedule and cause un-expected delays on the job

archaeological finds, endangered species, wetlands

78
New cards

Construction results in 40% of all waste in North America? T/F

true

79
New cards

How do we document DAILY work progress on our projects?

Personal diaries and cell phones

80
New cards

The SWPPP is to control soil erosion? T/F

true

81
New cards

The back charge is?

chagres for work failed to complete, charges for damages to others work, amount charged for work performed not per plans and specs

82
New cards

A site logistics plan should include

Material storage zones and their location, location of field offices, security measures

83
New cards

Quality control is the _ that ensures the quality required by the plans and specs

program

84
New cards

Quality assurance is the _ that achieve the quality required by the plans and specs

process

85
New cards

A trade partner is the same as a subcontractor? T/F

false

86
New cards

What are the most common types of schedules used in construction?

Network diagrams and Gantt charts

87
New cards

What are the funadamental stages of schedule development?

planning, schedule, sequencing

88
New cards

A 3WLA schedule is which level of schedule?

Level 4

89
New cards

Who are the stakeholders involved in the planning phase of a project?

CM, Owner, Architect

90
New cards

Name the 3 different types of activities that are included in the typical schedule

production, procurement, and administration activities

91
New cards

The critical path is the _ path through a network diagram schedule and includes those activities that have zero float

longest

92
New cards

Float and slack are the same? T/F

true

93
New cards

3WLA schedules are prepared by which of the following?

superintendent

94
New cards

in primavera the listing of items contained in the network diagram are called _

activities

95
New cards

The fundamental steps included in the project control cycle include a step for benchmarks. Which of the following 2 are used to establish those benchmarks?

Schedule and estimate

96
New cards

What are the 2 essential items of a effective project control system?

info such as man hours per task and accurate reporting

97
New cards

Name 3 factors that can impact project performance

inadequate tools and equipment, overcrowding, weather

98
New cards

A superintendent cant _ quality; they must _ for quality

ensure & inspect

99
New cards

What are the fundamental objectives of a quality management plan?

mistake prevention, do it right first time, continuous improvement

100
New cards

What is the difference between quality control and assurance? quality control addresses at the project level and deals with _ to the plans and specs

conformance